05000400/FIN-2014005-01 | Failure to Adequately Implement the Equipment Clearance Procedure | Unanalyzed Condition Internal Flooding Significance Determination Process | |
05000400/FIN-2014007-01 | Failure to Establish Test That Verified Interlock Capability | ||
05000400/FIN-2014007-02 | Failure to Establish Appropriate Procedural Limitations Based on Design Requirements of the Emergency Diesel Generators | ||
05000400/FIN-2014007-03 | Failure to Establish Appropriate Procedural Limitations to Prevent Exceeding TS Limits and Safety Analysis Assumptions | ||
05000400/FIN-2014007-04 | Inadequate Categorization of Valves in Potential Release Paths During Accidents | ||
05000400/FIN-2014008-01 | Failure to Identify and Evaluate All Targets Within the Zone of Influence of Ignition Sources | Probabilistic Risk Assessment Significance Determination Process Fire Watch | |
05000400/FIN-2014403-01 | Security | ||
05000400/FIN-2014403-02 | Licensee-Identified Violation | ||
05000400/FIN-2015001-01 | Licensee-Identified Violation | ||
05000400/FIN-2015002-01 | Failure to Maintain Emergency Assessment Capability | Time of Discovery | |
05000400/FIN-2015002-02 | Failure to Adequately Implement the Control Room Area HVAC System Procedure | Significance Determination Process | |
05000400/FIN-2015002-03 | Inadequate Post Modification Testing of 1CZ-1 and 1CZ-2 HMCP Breakers | Significance Determination Process | |
05000400/FIN-2015003-01 | Failure to Adequately Implement the Clearance and Tagging Procedure | ||
05000400/FIN-2015003-02 | Written NRC Biennial Examinations Did Not Meet Qualitative Standards | ||
05000400/FIN-2015003-03 | Failure to Implement Adequate Corrective Actions | Significance Determination Process | |
05000400/FIN-2015003-04 | Loss of A ESW Train | Significance Determination Process | |
05000400/FIN-2015003-05 | Failure to implement EQ Program Requirements | Internal Flooding Condition Adverse to Quality | |
05000400/FIN-2015003-06 | Failure to Report the Loss of Emergency Assessment Capability | ||
05000400/FIN-2015004-01 | B ESW System Safety-Related Cables Submerged in Water | Significance Determination Process | |
05000400/FIN-2015004-02 | Failure to Adequately Implement Post-Maintenance Testing | Significance Determination Process | |
05000400/FIN-2015007-01 | Failure to Establish As-found Testing on 6.9kV Vacuum Breakers | ||
05000400/FIN-2015008-01 | Untimely 10 CFR 50.73 Notification of an Inoperable CIV | ||
05000400/FIN-2015008-02 | Failure to Follow EPM-410 Procedure | Significance Determination Process | |
05000400/FIN-2015404-01 | Security | ||
05000400/FIN-2015404-02 | Security | ||
05000400/FIN-2015404-03 | Security | ||
05000400/FIN-2015404-04 | Licensee-Identified Violation | ||
05000400/FIN-2015404-05 | Licensee-Identified Violation | ||
05000400/FIN-2016001-01 | NRC Biennial Written Examinations Did Not Meet Qualitative Standards | Significance Determination Process | |
05000400/FIN-2016002-01 | Licensee-Identified Violation | Safe Shutdown Significance Determination Process Fire Protection Program | |
05000400/FIN-2016002-02 | Licensee-Identified Violation | Hot Short Safe Shutdown Significance Determination Process | |
05000400/FIN-2016003-01 | Subsequent Loss of Safety-Related Chilled Water System Results in a Loss of Safety Function | Mission time | |
05000400/FIN-2016004-01 | Licensee-Identified Violation | Significance Determination Process Operability Determination | |
05000400/FIN-2017001-01 | Licensee-Identified Violation | Internal Flooding Significance Determination Process | |
05000400/FIN-2017002-01 | Evaluate Fire Protection Discrepancies in RHR/CS Pump Rooms | ||
05000400/FIN-2017002-02 | B ESCW Chiller Failure to Start | ||
05000400/FIN-2017003-01 | Incomplete and Inaccurate Emergency Action Level Submittals | Significance Determination Process | |
05000400/FIN-2017003-02 | Review of Removal of the Technical Support Center (TSC) Temporary Diesel Generator | Significance Determination Process | |
05000400/FIN-2017003-03 | Licensee-Identified Violation | Significance Determination Process | |
05000400/FIN-2018001-01 | Adequacy of Fire Brigade Response During Fire Dril | ||
05000400/FIN-2018002-01 | Failure to Promptly Identify and Correct a Condition Adverse to Quality For a Through-Wall Leak in the ESW Screen Wash Piping | Condition Adverse to Quality Through-Wall Leak Through-Wall Leakage | |
05000400/FIN-2018002-02 | Inadequate Fire Brigade Performance Assessment of Announced Fire Drill | ||
05000400/FIN-2018002-03 | Failure to Adequately Document Changes to the Emergency Plan | ||
05000400/FIN-2018002-04 | Failure to Implement Adequate Steam Generator Blowdown Demineralizer Control Procedures | ||
05000400/FIN-2018002-05 | Failure to Follow Secondary Water Chemistry Plan for Elevated Levels of Secondary Water Impurities | Downpower | |
05000400/FIN-2018002-06 | Failure to Implement Viable Compensatory Actions with Seismic Monitoring System Out of Service for Planned Preventive Maintenance | ||
05000400/FIN-2018002-07 | Minor Violation | ||
05000400/FIN-2018003-01 | Failure to Implement Adequate Periodic Exercising of Turbine Trip Solenoid Operated Valves | ||
05000400/FIN-2018410-01 | Security | ||
05000400/LER-1986-004, Forwards LER 86-004-00.LER 86-003-00 Will Not Be Issued,As Event Does Not Require LER | 5 December 1986 | Forwards LER 86-004-00.LER 86-003-00 Will Not Be Issued,As Event Does Not Require LER |