Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000400/FIN-2014005-01Failure to Adequately Implement the Equipment Clearance ProcedureUnanalyzed Condition
Internal Flooding
Significance Determination Process
05000400/FIN-2014007-01Failure to Establish Test That Verified Interlock Capability
05000400/FIN-2014007-02Failure to Establish Appropriate Procedural Limitations Based on Design Requirements of the Emergency Diesel Generators
05000400/FIN-2014007-03Failure to Establish Appropriate Procedural Limitations to Prevent Exceeding TS Limits and Safety Analysis Assumptions
05000400/FIN-2014007-04Inadequate Categorization of Valves in Potential Release Paths During Accidents
05000400/FIN-2014008-01Failure to Identify and Evaluate All Targets Within the Zone of Influence of Ignition SourcesProbabilistic Risk Assessment
Significance Determination Process
Fire Watch
05000400/FIN-2014403-01Security
05000400/FIN-2014403-02Licensee-Identified Violation
05000400/FIN-2015001-01Licensee-Identified Violation
05000400/FIN-2015002-01Failure to Maintain Emergency Assessment CapabilityTime of Discovery
05000400/FIN-2015002-02Failure to Adequately Implement the Control Room Area HVAC System ProcedureSignificance Determination Process
05000400/FIN-2015002-03Inadequate Post Modification Testing of 1CZ-1 and 1CZ-2 HMCP BreakersSignificance Determination Process
05000400/FIN-2015003-01Failure to Adequately Implement the Clearance and Tagging Procedure
05000400/FIN-2015003-02Written NRC Biennial Examinations Did Not Meet Qualitative Standards
05000400/FIN-2015003-03Failure to Implement Adequate Corrective ActionsSignificance Determination Process
05000400/FIN-2015003-04Loss of A ESW TrainSignificance Determination Process
05000400/FIN-2015003-05Failure to implement EQ Program RequirementsInternal Flooding
Condition Adverse to Quality
05000400/FIN-2015003-06Failure to Report the Loss of Emergency Assessment Capability
05000400/FIN-2015004-01B ESW System Safety-Related Cables Submerged in WaterSignificance Determination Process
05000400/FIN-2015004-02Failure to Adequately Implement Post-Maintenance TestingSignificance Determination Process
05000400/FIN-2015007-01Failure to Establish As-found Testing on 6.9kV Vacuum Breakers
05000400/FIN-2015008-01Untimely 10 CFR 50.73 Notification of an Inoperable CIV
05000400/FIN-2015008-02Failure to Follow EPM-410 ProcedureSignificance Determination Process
05000400/FIN-2015404-01Security
05000400/FIN-2015404-02Security
05000400/FIN-2015404-03Security
05000400/FIN-2015404-04Licensee-Identified Violation
05000400/FIN-2015404-05Licensee-Identified Violation
05000400/FIN-2016001-01NRC Biennial Written Examinations Did Not Meet Qualitative StandardsSignificance Determination Process
05000400/FIN-2016002-01Licensee-Identified ViolationSafe Shutdown
Significance Determination Process
Fire Protection Program
05000400/FIN-2016002-02Licensee-Identified ViolationHot Short
Safe Shutdown
Significance Determination Process
05000400/FIN-2016003-01Subsequent Loss of Safety-Related Chilled Water System Results in a Loss of Safety FunctionMission time
05000400/FIN-2016004-01Licensee-Identified ViolationSignificance Determination Process
Operability Determination
05000400/FIN-2017001-01Licensee-Identified ViolationInternal Flooding
Significance Determination Process
05000400/FIN-2017002-01Evaluate Fire Protection Discrepancies in RHR/CS Pump Rooms
05000400/FIN-2017002-02B ESCW Chiller Failure to Start
05000400/FIN-2017003-01Incomplete and Inaccurate Emergency Action Level SubmittalsSignificance Determination Process
05000400/FIN-2017003-02Review of Removal of the Technical Support Center (TSC) Temporary Diesel GeneratorSignificance Determination Process
05000400/FIN-2017003-03Licensee-Identified ViolationSignificance Determination Process
05000400/FIN-2018001-01Adequacy of Fire Brigade Response During Fire Dril
05000400/FIN-2018002-01Failure to Promptly Identify and Correct a Condition Adverse to Quality For a Through-Wall Leak in the ESW Screen Wash PipingCondition Adverse to Quality
Through-Wall Leak
Through-Wall Leakage
05000400/FIN-2018002-02Inadequate Fire Brigade Performance Assessment of Announced Fire Drill
05000400/FIN-2018002-03Failure to Adequately Document Changes to the Emergency Plan
05000400/FIN-2018002-04Failure to Implement Adequate Steam Generator Blowdown Demineralizer Control Procedures
05000400/FIN-2018002-05Failure to Follow Secondary Water Chemistry Plan for Elevated Levels of Secondary Water ImpuritiesDownpower
05000400/FIN-2018002-06Failure to Implement Viable Compensatory Actions with Seismic Monitoring System Out of Service for Planned Preventive Maintenance
05000400/FIN-2018002-07Minor Violation
05000400/FIN-2018003-01Failure to Implement Adequate Periodic Exercising of Turbine Trip Solenoid Operated Valves
05000400/FIN-2018410-01Security
05000400/LER-1986-004, Forwards LER 86-004-00.LER 86-003-00 Will Not Be Issued,As Event Does Not Require LER5 December 1986Forwards LER 86-004-00.LER 86-003-00 Will Not Be Issued,As Event Does Not Require LER