Finding | |
---|---|
Title | Failure to Implement Adequate Corrective Actions |
Description | A self-revealing green finding was identified for failure to implement adequate corrective actions for the repeated failure of PS-4175, low pressure steam inlet crossover pressure switch in accordance with licensee procedure AD-PI-ALL-0100, Corrective Action Program. Specifically, on multiple occasions the licensee failed to install a pressure switch rated for design conditions on the Main Turbine which led to an unplanned reactivity addition, when PS-4175 failed open. The licensee entered this into their corrective action program (CAP) as action request (AR) 755621 and took immediate actions to reduce power to less than 100 percent. Reactor power reached a maximum value of 100.5 percent. Failure to implement adequate corrective action for the repeated failure of pressure switch PS- 4175 in accordance with licensee procedure AD-PI-ALL-0100 was a performance deficiency. The performance deficiency was determined to be more than minor because if left uncorrected the performance deficiency had the potential to lead to a more significant safety concern. Specifically, if not for the manual actions taken by the operators to insert control rods, the reactivity addition would have continued and would have ultimately resulted in a reactor trip on high neutron flux. Using IMC 0609, Significance Determination Process Attachment 4, Initial Characterization of Findings, and Appendix A, The SDP for Findings At-Power, (June 19, 2012), the inspectors determined the finding was a contributor as a Transient Initiator to the Initiating Events cornerstone. The inspectors determined the finding was of very low safety significance (Green) because it did not result in a reactor trip and it did not cause the loss of any mitigation equipment relied upon to transition the plant from the onset of the trip to a stable shutdown condition. The inspectors concluded the finding was associated with the design margins aspect (H.6) of the human performance cross-cutting area since the licensee repeatedly failed to install a pressure switch adequate for the operating conditions. |
Site: | Harris |
---|---|
Report | IR 05000400/2015003 Section 1R12 |
Date counted | Sep 30, 2015 (2015Q3) |
Type: | Finding: Green |
cornerstone | Initiating Events |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.12 |
Inspectors (proximate) | B Caballero G Hopper J Austin J Dodson M Bates M Riches |
CCA | H.6, Design Margins |
INPO aspect | WP.2 |
' | |