| Q | CCA | Title |
---|
05000400/FIN-2014002-02 | 2014Q1 | P.3 | Failure to Prevent Recurrence of a Signifiant Condition Adverse to Quality |
05000400/FIN-2014002-01 | 2014Q1 | H.1 | Failure to Adequately Perform the New Fuel Oil Surveillance Requirement |
05000400/FIN-2014002-03 | 2014Q1 | H.8 | Failure to Comply With Technical Specification |
05000400/FIN-2014003-01 | 2014Q2 | H.13 | Failure to Adequately Implement a Plant Modification |
05000400/FIN-2014008-01 | 2014Q2 | | Failure to Identify and Evaluate All Targets Within the Zone of Influence of Ignition Sources |
05000400/FIN-2014007-01 | 2014Q3 | | Failure to Establish Test That Verified Interlock Capability |
05000400/FIN-2014007-02 | 2014Q3 | | Failure to Establish Appropriate Procedural Limitations Based on Design Requirements of the Emergency Diesel Generators |
05000400/FIN-2014007-03 | 2014Q3 | | Failure to Establish Appropriate Procedural Limitations to Prevent Exceeding TS Limits and Safety Analysis Assumptions |
05000400/FIN-2014007-04 | 2014Q3 | | Inadequate Categorization of Valves in Potential Release Paths During Accidents |
05000400/FIN-2014004-02 | 2014Q3 | | Loss of Emergency Planning Sirens |
05000400/FIN-2014004-01 | 2014Q3 | | Potential Impact of Sump Pumps out of Service |
05000400/FIN-2014403-01 | 2014Q4 | H.7 | Security |
05000400/FIN-2014005-01 | 2014Q4 | H.11 | Failure to Adequately Implement the Equipment Clearance Procedure |