| | Q | CCA | Title |
|---|
| 05000400/FIN-2014007-01 | 2014Q3 | | Failure to Establish Test That Verified Interlock Capability |
| 05000400/FIN-2014007-02 | 2014Q3 | | Failure to Establish Appropriate Procedural Limitations Based on Design Requirements of the Emergency Diesel Generators |
| 05000400/FIN-2014007-03 | 2014Q3 | | Failure to Establish Appropriate Procedural Limitations to Prevent Exceeding TS Limits and Safety Analysis Assumptions |
| 05000400/FIN-2014007-04 | 2014Q3 | | Inadequate Categorization of Valves in Potential Release Paths During Accidents |
| 05000400/FIN-2014004-02 | 2014Q3 | | Loss of Emergency Planning Sirens |
| 05000400/FIN-2014004-01 | 2014Q3 | | Potential Impact of Sump Pumps out of Service |
| 05000400/FIN-2014403-01 | 2014Q4 | H.7 | Security |
| 05000400/FIN-2014005-01 | 2014Q4 | H.11 | Failure to Adequately Implement the Equipment Clearance Procedure |
| 05000400/FIN-2015404-01 | 2015Q2 | | Security |
| 05000400/FIN-2015404-02 | 2015Q2 | | Security |
| 05000400/FIN-2015404-03 | 2015Q2 | | Security |
| 05000400/FIN-2015002-01 | 2015Q2 | P.2 | Failure to Maintain Emergency Assessment Capability |
| 05000400/FIN-2015002-02 | 2015Q2 | H.8 | Failure to Adequately Implement the Control Room Area HVAC System Procedure |
| 05000400/FIN-2015002-03 | 2015Q2 | H.5 | Inadequate Post Modification Testing of 1CZ-1 and 1CZ-2 HMCP Breakers |