05000400/FIN-2015004-02
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Adequately Implement Post-Maintenance Testing |
Description | A self-revealing Green NCV of Criterion XI, Test Control, Appendix B of 10 CFR Part 50, occurred due to the licensees failure to perform adequate post-maintenance testing on the essential services chilled water (ESCW) chillers. Specifically, on multiple occasions the licensee failed to perform section 7.8, Current Signal Input Resistor Adjustment, of procedure CM-I0014, York Essential Services Chilled Water Chiller Temperature Control Maintenance, following maintenance on the temperature controller associated with the ESCW chillers. The licensee took corrective actions to adjust the current limiters on the ESCW chillers to be at the correct setting of 65 amps. The licensee entered this issue into the CAP as NCRs 1944657 and 1950574. The licensees failure to perform adequate post-maintenance testing on the, ESCW Chiller was a performance deficiency. Specifically, the failure to perform section 7.8 of procedure CM-I0014 to ensure the configuration of the temperature controllers were per design specifications resulted in the current limiters on each unit being out of calibration for extended periods of time. The performance deficiency was more than minor because if left uncorrected, it would have the potential to lead to a more significant safety concern. For the A train, continued omission of section 7.8 following maintenance on its temperature controller, had the potential of the pre-rotation vanes pulling excessive load resulting in a trip of the A train chiller. For the B train, continued omission of section 7.8 following maintenance on its temperature controller had the potential of the pre-rotation vanes not picking up adequate load to meet the cooling demands during accident conditions. The inspectors used Table 2 of Attachment 4, Initial Characterization of Findings, of IMC 0609, Significance Determination Process, to determine that the finding was associated with the Mitigating Systems Cornerstone. Using the guidance provided in Table 3 of Attachment 4, the inspectors transitioned to Appendix A, Significance Determination Process (SDP) for Findings At-Power, of IMC 0609. Using Exhibit 2, Mitigating Systems Screening Questions, of the appendix, the inspectors determined that the finding was of very low safety significance (Green) because while the chillers were in a nonconforming condition, operability of the chillers was maintained. The finding was assigned the cross-cutting aspect of bases for decisions, as described in the area of human performance, because the licensee made the decision not to perform section 7.8 of maintenance procedure CM-I0014 without documenting a reason for omitting the section following maintenance on the ESCW temperature controllers (H.10). |
Site: | Harris |
---|---|
Report | IR 05000400/2015004 Section 1R19 |
Date counted | Dec 31, 2015 (2015Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.19 |
Inspectors (proximate) | G Hopper J Austin M Bates M Riches |
Violation of: | 10 CFR 50 Appendix B Criterion XI |
CCA | H.10, Bases for Decisions |
INPO aspect | CO.2 |
' | |
Finding - Harris - IR 05000400/2015004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|