Issue date | Site | Title | Topic | |
---|---|---|---|---|
IR 05000263/2007006 | 23 October 2007 | Monticello Perry | IR 05000263-07-006(DRS); 08/27/2007 Through 09/14/2007; Perry Nuclear Power Plant. Routine Engineering Baseline Inspection | Safe Shutdown Time of Discovery |
IR 05000349/2010402 | 22 June 2010 | Perry 05000349 | IR 05000349-10-402, (Drs), on 05/17/2010 - 05/21/2010, for Perry Nuclear Power Plant, Routine Security Baseline Inspection | Affidavit |
IR 05000440/2001015 | 30 January 2002 | Perry | IR 05000440/2001-015; on 11/19-12/31/2001; Firstenergy Nuclear Operating Company; Perry Nuclear Power Plant. Personnel Performance During Non-Routine Plant Evolutions | High Radiation Area Locked High Radiation Area Significance Determination Process Process Control Program Overexposure |
IR 05000440/2002001 | 4 March 2002 | Perry | Annual Assessment Letter - Perry Nuclear Power Plant (Report 50-440/2002-01) | |
IR 05000440/2002002 | 11 April 2002 | Perry | IR 05000440/2002-002, Fristenergy Nuclear Operating, Co, Perry Nuclear Power Plant, Unit 1, Perry, Oh, Inspection on 02/1/-03/31/2002, Related to Procedures & Records. No Violations Noted | Fire Barrier Probabilistic Risk Assessment Significance Determination Process |
IR 05000440/2002003 | 3 May 2002 | Perry | IR 05000440/2002-003(DRS), on 04/08/2002 - 04/12/2002, Firstenergy Nuclear Operating Company, Perry Nuclear Power Plant, Unit 1, Exercise Evaluation | |
IR 05000440/2002004 | 29 July 2002 | Perry | IR 05000440-02-004(DRS), on 06/10-27/2002, Perry, Unit 1. Safety System Design & Performance Capability Inspection | |
IR 05000440/2002005 | 29 July 2002 | Perry | IR 05000440-02-005, on 04/01/02 - 06/30/02, First Energy Nuclear Operating Co., Perry Nuclear Power Plant; Maintenance Risk Assessments and Emergent Work Evaluation, Surveillance Testing, Event Follow-Up | Hot Short Boric Acid High winds Offsite Dose Calculation Manual Fire Barrier Significance Determination Process Earthquake Power change Failure to Scram |
IR 05000440/2002006 | 30 October 2002 | Perry | IR 05000440-02-006; on 07/01/2002 - 09/30/2002, Perry Nuclear Power Plant, Maintenance Effectiveness, Surveillance Testing | Offsite Dose Calculation Manual Fire Barrier Probabilistic Risk Assessment Temporary Modification Zebra Mussel Locked High Radiation Area Significance Determination Process Scram Discharge Volume Maintenance Rule Program Fire Protection Program Power change |
IR 05000440/2002007 | 22 November 2002 | Perry | IR 05000440-02-007, First Energy Nuclear Operating Company, Perry Nuclear Power Plant, on 10/03/02 | |
IR 05000440/2002008 | 4 March 2003 | Perry | Final Significance Determination for a White Finding and Notice of Violation (IR 05000440-02-008) | Significance Determination Process Preliminary White Finding |
IR 05000440/2002301 | 5 April 2002 | Perry | Er 05000440/2002-301, on 03/05-03/13/2002, Firstenergy Nuclear Operating Company, Perry, Unit 1. the Announced Operator Licensing Initial Examination Was Conducted by Regional Examiners in Accordance with the Guidance of NUREG-1021 | |
IR 05000440/2003001 | 4 March 2003 | Perry | Annual Assessment Letter - Perry Nuclear Power Plant. (Report 05000440-03-001) | |
IR 05000440/2003002 | 7 March 2003 | Perry | IR 05000440-03-002, on February 10-14, 2003, First Energy Nuclear Operating Co., Perry Nuclear Power Plant. Permanent Plant Modification and Changes, Tests, and Experiments | Non-Destructive Examination Commercial Grade Dedication Temporary Modification Significance Determination Process Foreign Material Exclusion Scram Discharge Volume Operability Determination Battery sizing Fuel cladding Through-Wall Leak Fire Protection Program |
IR 05000440/2003003 | 15 April 2003 | Perry | IR 05000440-03-003, on 12/29/2002 - 03/31/2003, First Energy Nuclear Operating Company; Perry Nuclear Power Plant. Fire Protection, Surveillance Testing, Event Follow-up | Safe Shutdown Half scram Fire Barrier Probabilistic Risk Assessment Fire impairment Temporary Modification Condition Adverse to Quality Significance Determination Process Foreign Material Exclusion Scram Discharge Volume Operability Determination Hourly Fire Watch Scaffolding Siren |
IR 05000440/2003004 | 28 July 2003 | Perry | IR 05000440-03-004, on 04/01/2003 - 06/30/2003, for Firstenergy Nuclear Operating Company; Perry; Access Control to Radiologically Significant Areas, Other Activities | High winds High Radiation Area Fire Barrier Hydrostatic Nondestructive Examination Locked High Radiation Area Significance Determination Process Operability Determination Scaffolding Substantial potential for an overexposure Power change Overexposure |
IR 05000440/2003005 | 25 July 2003 | Perry | IR 05000440-03-005, on 06/09/2003 - 06/27/2003, Perry Nuclear Power Plant, Unit 1. IR 05000440-03-05; on 06/09/03-06/27/03; Firstenergy Nuclear Operating Company; Perry Nuclear Power Plant; Identification and Resolution of Problems | Packing leak Fire Barrier Condition Adverse to Quality Significance Determination Process Foreign Material Exclusion |
IR 05000440/2003007 | 21 August 2003 | Perry | IR 05000440-03-007, on 07/28/03 - 08/01/03, Firstenergy Nuclear Operating Co., Perry Nuclear Power Plant. Supplemental Inspection IP 95001. Mitigating Systems | Condition Adverse to Quality Significance Determination Process |
IR 05000440/2003008 | 15 January 2004 | Perry | IR 05000440-03-008, on 11/17/03 Through 12/05/03, for Perry Nuclear Power Plant, Unit 1; Fire Protection Triennial Baseline Inspection | Hot Short Safe Shutdown Fire Barrier Emergency Lighting Significance Determination Process Fire Protection Program |
IR 05000440/2003009 | 10 October 2003 | Perry | IR 05000440-03-009; 08/27/2003-09/11/2003; Perry Nuclear Power Plant. Special Inspection for Anomalies at Perry Following the August 14, 2003, Loss of Offsite Power (LOOP) | Time of Discovery Past operability Significance Determination Process Operability Determination |
IR 05000440/2003010 | 30 January 2004 | Perry | IR 05000440-03-010; on 10/01-12/31/03; for Perry Nuclear Power Plant; Maintenance Risk Assessments and Emergent Work Control; Surveillance Testing; Identification and Resolution of Problems | Safe Shutdown High winds High Radiation Area Offsite Dose Calculation Manual Fire Barrier Internal Flooding Hydrostatic Past operability Probabilistic Risk Assessment Temporary Modification Locked High Radiation Area Significance Determination Process Job Performance Measure Operability Determination Earthquake Preliminary White Finding |
IR 05000440/2003012 | 22 December 2003 | Perry | IR 05000440-03-012, on 12/01/03 - 12/04/03; Perry Nuclear Power Plant; Supplemental Inspection IP 95001; Mitigating Systems | |
IR 05000440/2003301 | 28 February 2003 | Perry | Er 05000440-03-301(DRS), on January 27 - February 6, 20033, Firstenergy Nuclear Operating Company, Perry Nuclear Power Plant. Initial License Examination Report | |
IR 05000440/2004001 | 27 August 2003 | Perry | IR 05000440-04-001, Perry, Mid-Cycle Plant Performance Assessment Letter | |
IR 05000440/2004002 | 16 April 2004 | Perry | IR 05000440-04-002, 01/01/2004 - 03/31/2004; Perry Nuclear Power Plant; Equipment Availability and Functional Capability; Identification and Resolution of Problems | Fire Barrier Probabilistic Risk Assessment Temporary Modification Condition Adverse to Quality Significance Determination Process |
IR 05000440/2004003 | 23 January 2004 | Perry | Re Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report No. 05000440-04-03) | Significance Determination Process Preliminary White Finding |
IR 05000440/2004004 | 10 February 2004 | Perry | IR 05000440-04-004, on 01/12/2004 - 01/16/2004; Perry Nuclear Power Plant; Supplemental Inspection IP 95001 Occupational Radiation Safety Cornerstone | High Radiation Area Locked High Radiation Area |
IR 05000440/2004005 | 28 January 2004 | Perry | Final Significance Determination for a White Finding - NRC IR 05000440-04-005) | Significance Determination Process Large early release frequency Preliminary White Finding |
IR 05000440/2004006 | 12 March 2004 | Perry | EA-04-020, Perry Nuclear Power Plant, Notice of Violation for IR 05000440-04-006 | |
IR 05000440/2004007 | 29 July 2004 | Perry | IR 05000440-04-007, on 04/01/2004 Through 06/30/2004, for Perry Nuclear Power Plant; Adverse Weather, Post-Maintenance Testing, Identification and Resolution of Problems | High Radiation Area Offsite Dose Calculation Manual Fire Barrier Enforcement Discretion Probabilistic Risk Assessment Fire impairment Locked High Radiation Area Significance Determination Process Earthquake Fire Watch Hourly Fire Watch Power change Downpower Overexposure |
IR 05000440/2004008 | 5 August 2004 | Perry | IR 05000440-04-008; 05/17/04-05/21/04 and 6/7/04-6/10/04; Perry Nuclear Power Plant. Inspection Procedure (IP) 95002, Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area, Root Cause and Extent | Past operability Finite Element Analysis Condition Adverse to Quality Significance Determination Process |
IR 05000440/2004009 | 22 June 2004 | Perry | IR 05000440-04-009; 05/24/2004 - 05/28/2004; Perry Nuclear Power Plant; Supplemental Inspection; IP 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. | |
IR 05000440/2004010 | 8 October 2004 | Perry | IR 05000440-04-010(DRS); 08/09/2004 - 08/27/2004; Perry Nuclear Power Plant, Unit 1; Combined Biennial Engineering Inspections of Routine Evaluations of Changes, Tests, or Experiments and Routine Permanent Plant Modifications Concurrent wit | Condition Adverse to Quality |
IR 05000440/2004011 | 2 July 2004 | Perry | IR 05000440-04-011; 05/24/04 - 06/04/04; Perry Nuclear Power Plant, Special Inspection for Repeat Failure of the Division 1 Emergency Service Water (ESW) Pump on May 21, 2004 | Enforcement Discretion Nondestructive Examination Finite Element Analysis Condition Adverse to Quality Significance Determination Process |
IR 05000440/2004013 | 24 October 2004 | Perry | IR 05000440-04-013; on 07/01/2004 - 09/30/2004; Perry Nuclear Power Plant; Equipment Availability and Functional Capability; Post-Maintenance Testing; Surveillane Testing; Identification and Resolution of Problems; Other Activitites | High Radiation Area Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Probabilistic Risk Assessment Temporary Modification Zebra Mussel Locked High Radiation Area Finite Element Analysis Condition Adverse to Quality Significance Determination Process Scram Discharge Volume Operability Determination Fire Protection Program Downpower |
IR 05000440/2004014 | 27 October 2004 | Perry | IR 05000440-04-014(DRS); 10/04/2004 - 10/08/2004; Perry Nuclear Power Plant; Emergency Preparedness Specialist Report | |
IR 05000440/2004015 | 9 February 2005 | Perry | IR 05000440-04-015, on 10/01/2004 - 12/31/2004; Perry Nuclear Power Plant; Fire Protection; Maintenance Risk Assessments and Emergent Work Control; Post-Maintenance Testing | Safe Shutdown Packing leak Half scram Fire Barrier Internal Flooding Probabilistic Risk Assessment Significance Determination Process Job Performance Measure Foreign Material Exclusion Operability Determination Maintenance Rule Program Scaffolding Power change Downpower |
IR 05000440/2004016 | 23 December 2004 | Perry | IR 05000440-04-016 on 10/04/2004 - 11/19/2004 for Perry Nuclear Power Plant; Other Activities | Grab sample Offsite Dose Calculation Manual Significance Determination Process Preliminary White Finding |
IR 05000440/2004301 | 17 February 2005 | Perry | NRC Initial License Examination Report 50-440/04-301(DRS) | Earthquake Fuel cladding |
IR 05000440/2005001 | 30 August 2004 | Perry | Mid-Cycle Performance Review and Inspection Plan - Perry Nuclear Power Plant (Report 05000440-05-001) | Condition Adverse to Quality |
IR 05000440/2005002 | 5 May 2005 | Perry | IR 05000440-05-002, on 01/01/2005 - 03/31/2005; Perry Nuclear Power Plant; Evaluations of Changes, Tests, or Experiments; Equipment Alignment; Operator Performance During Non-Routine Evolutions and Events; Post-Maintenance Testing; Refuelin | Safe Shutdown Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level High Radiation Area Half scram Mission time Fire Barrier Tornado Missile Internal Flooding Past operability Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Foreign Material Exclusion Fuel cladding Liquid penetrant Fire Protection Program Scaffolding Power change Overexposure |
IR 05000440/2005005 | 23 March 2005 | Perry | IR 05000440-05-005, on 01/07/2005 - 02/18/2005, Perry Nuclear Power Plant, Unit 1; Special Inspection for Recirculation Pump Downshift Events of December 23, 2004, and January 6, 2005 | Reactor Vessel Water Level Significance Determination Process Operability Determination Maintenance Rule Program Grace period |
IR 05000440/2005006 | 20 July 2005 | Perry 05000040 | IR 05000440-05-006; on 04/01/2005 - 06/30/2005; for Perry Nuclear Power Plant; Adverse Weather, Equipment Alignment, Maintenance Risk Assessments and Emergent Work Control, Surveillance Testing, Identification and Resolution of Problems | Ultimate heat sink Fire Barrier Time to boil Past operability Probabilistic Risk Assessment Fire impairment Zebra Mussel Condition Adverse to Quality Significance Determination Process Frazil ice Power change |
IR 05000440/2005007 | 29 March 2005 | Perry | EA-04-214, Perry Nuclear Power Plant, Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report No. 05000440-05-007(DRS)) | Offsite Dose Calculation Manual Significance Determination Process Preliminary White Finding |
IR 05000440/2005009 | 7 November 2005 | Perry | IR 05000440-05-009 on 07/01/2005 - 9/30/2005 for Perry; Equipment Alignment, Fire Protection, Operator Performance During Non-Routine Evolutions & Events, Surveillance Testing, Occupation Radiation Safety, Identification & Resolution of Pro | Unanalyzed Condition Boric Acid Packing leak High Radiation Area Fire Barrier Stroke time Internal Flooding Hydrostatic Probabilistic Risk Assessment Fire impairment Temporary Modification Zebra Mussel Locked High Radiation Area Condition Adverse to Quality Missed surveillance Significance Determination Process Process Control Program Operability Determination Fire Protection Program Scaffolding Substantial potential for an overexposure Overexposure |
IR 05000440/2005010 | 7 February 2006 | Perry | IR 05000440-05-010; 10/1/2005-12/31/2005; Perry Nuclear Power Plant; Post-Maintenance Testing | Hot Short Fire Barrier Probabilistic Risk Assessment Condition Adverse to Quality Significance Determination Process Job Performance Measure Operability Determination Fire Protection Program Downpower |
IR 05000440/2005012 | 16 November 2005 | Perry | IR 05000440-05-012, on 10/24/2005 - 10/28/2005; Perry Nuclear Power Plant; Supplemental Inspection; Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area | Probabilistic Risk Assessment Condition Adverse to Quality Significance Determination Process Large early release frequency |
IR 05000440/2005015 | 18 January 2006 | Perry | IR 05000440-05-015; 12/05/2005 - 12/09/2005; Perry Nuclear Power Plant; Supplemental Inspection; IP 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. | Grab sample |
IR 05000440/2006001 | 2 March 2006 | Perry | (Eco) Annual Assessment Letter (Report 05000440/2006001) | |
IR 05000440/2006002 | 24 April 2006 | Perry | IR 05000440-06-002; 01/01/2006 - 03/31/2006; Perry Nuclear Power Plant; Operator Performance During Non-Routine Evolutions and Events; Post-Maintenance Testing | Safe Shutdown High winds Fire Barrier Probabilistic Risk Assessment Significance Determination Process Scram Discharge Volume Fire Protection Program Downpower |