MONTHYEARL-24-226, License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 12024-10-31031 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 1 IR 05000440/20240032024-10-30030 October 2024 Integrated Inspection Report 05000440/2024003 and 07200069/2024001 L-24-179, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 52024-10-21021 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 5 L-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration ML24150A2022024-07-25025 July 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-License Renewal Scoping Summary Rpt L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 05000440/LER-2024-003, Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage2024-07-15015 July 2024 Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage IR 05000440/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000440/2024401 L-24-020, License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 22024-06-27027 June 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 2 05000440/LER-2024-002, Reactor Water Clean Up Leak Detection Loss of Safety Function2024-06-27027 June 2024 Reactor Water Clean Up Leak Detection Loss of Safety Function L-24-036, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-27027 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models 05000440/LER-2024-001, Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition2024-06-20020 June 2024 Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition IR 05000440/20240112024-06-17017 June 2024 Fire Protection Team Inspection Report 05000440/2024011 ML24157A3782024-06-0606 June 2024 – Revised Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 ML24141A1632024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-24-103, Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams2024-05-0202 May 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams ML24117A1222024-04-26026 April 2024 Confirmation of Initial License Examination IR 05000440/20240012024-04-24024 April 2024 Integrated Inspection Report 05000440/2024001 L-24-097, Submittal of 2023 Annual Radiological Effluent Release Report2024-04-22022 April 2024 Submittal of 2023 Annual Radiological Effluent Release Report L-24-096, Submittal of Annual Radiological Environmental Operating Report2024-04-22022 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24095A3282024-04-19019 April 2024 License Renewal Revised Schedule Letter 2024-09-09
[Table view] Category:License-Operator Examination Report (Non-Power Reactors Only)
MONTHYEARML0331101972003-11-0606 November 2003 Gfes Ltr Re October 2003 Results IR 05000440/20033012003-02-28028 February 2003 Er 05000440-03-301(DRS), on January 27 - February 6, 20033, Firstenergy Nuclear Operating Company, Perry Nuclear Power Plant. Initial License Examination Report 2003-02-28
[Table view] |
Text
ary 28, 2003
SUBJECT:
PERRY NUCLEAR POWER PLANT NRC INITIAL LICENSE EXAMINATION REPORT 50-440/03-301(DRS)
Dear Mr. Kanda:
On February 7, 2003, NRC examiners completed initial operator licensing examinations at your Perry Nuclear Power Station. The enclosed report presents the results of the examination.
The NRC examiners administered an initial license examination operating test during the weeks of January 27 and February 3, 2003. A written examination was administered by Perry Station training personnel on February 6, 2003. Five Reactor Operator (RO) and seven Senior Reactor Operator (SRO) applicants were administered license examinations. The results of the examinations were finalized on February 25, 2003. Twelve applicants passed all sections of their respective examinations and were issued applicable operator licenses.
In accordance with 10 CFR Part 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this examination.
Sincerely,
/RA/
Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-440 License Nos. NPF-58
Enclosures:
1. Operator Licensing Examination Report 50-440/03-301(DRS)
2. Simulation Facility Report 3. Written Examinations (RO & SRO)
REGION III==
Docket No. 50-440 License Nos. NPF-58 Report No: 50-440/03-301(DRS)
Licensee: FirstEnergy Nuclear Operating Company (FENOC)
Facility: Perry Nuclear Power Plant, Unit 1 Location: P.O. Box 97 A200 Perry, OH 44081 Dates: January 27, 2003 through February 6, 2003 Examiners: M. Bielby, Chief Examiner C. Phillips, Examiner B. Palagi, Examiner Approved by: Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety
SUMMARY OF FINDINGS ER 05000440-03-301(DRS), on 01/27-02/06/03, FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant. Initial License Examination Report.
The announced operator licensing initial examination was conducted by regional NRC examiners in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 8, Supplement 1, Addendum 1.
Examination Summary:
- Twelve applicants passed all sections of their respective examinations and were issued applicable operator licenses. (Section 4OA5.1).
REPORT DETAILS 4. OTHER ACTIVITIES (OA)
4OA5 Other
.1 Initial Licensing Examinations a. Examination Scope The NRC examiners conducted an announced operator licensing initial examination during the weeks of January 27 and February 3, 2003. The facility's training staff used the guidance established in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 8, Supplement 1, Addendum 1, to prepare the examination outline and to develop the written examination and operating test. The NRC examiners administered the operating test during the weeks of January 27 and February 3, 2003 and the written examination on February 6, 2003. Five Reactor Operator and seven Senior Reactor Operator applicants were examined.
b. Findings Written Examination The licensee developed the written examination. During their initial review, the examiners determined that the examination, as submitted by the licensee, was within the range of acceptability expected for a proposed examination. During examination validation the week of January 6, 2003, examination changes agreed upon between the NRC and the licensee were incorporated according to the guidance contained in NUREG-1021. The licensee had no post examination comments on the written examination.
Operating Test The NRC examiners determined that the operating test, as originally submitted by the
licensee, was within the range of acceptability expected for a proposed examination.
Examination changes, agreed upon between the NRC and the licensee, were made during the validation week in accordance with NUREG-1021 guidance.
Examination Results Five Reactor Operator applicants and seven Senior Reactor Operator applicants were administered written examinations and operating tests for initial operator licensing.
Twelve applicants passed all sections of their respective examinations and were issued applicable operator licenses.
.2 Examination Security a. Scope The examiners reviewed and observed the licensees implementation of examination security requirements during the examination preparation and administration.
b. Findings No Findings.
4OA6 Meeting(s)
Exit Meeting The chief examiner presented the examination teams preliminary observations and findings on February 7, 2003, to M and members of the Operations and Training Department staff. The licensee acknowledged the observations and findings presented. No proprietary information was identified during the examination or the exit meeting.
KEY POINTS OF CONTACT Licensee W. Kanda, Vice President-Nuclear T. Rausch, General Manager, Nuclear Power Plant Department D. Bowen, Licensing R. Collings, Training Manager R. Gemberling, Licensed Operator Requalification Training Lead V. Higaki, Manager, Regulatory Affairs R. Kearny, Operations Manager NRC R. Powell, Senior Resident Inspector J. Ellegood, Resident Inspector
LIST OF ACRONYMS USED ADAMS Agency-Wide Document Access and Management System DRS Division of Reactor Safety NRC Nuclear Regulatory Commission PARS Publicly Available Records RO Reactor Operator SRO Senior Reactor Operator
Enclosure 2 SIMULATION FACILITY REPORT Facility Licensee: Perry Nuclear Power Plant Facility Docket No.: 50-440 Operating Tests Administered: January 27 - February 5, 2003 The following documents observations made by the NRC examination team during the initial operator license examination. These observations do not constitute audit or inspection findings and are not, without further verification and review, indicative of non-compliance with 10 CFR 55.45(b). These observations do not affect NRC certification or approval of the simulation facility other than to provide information which may be used in future evaluations. No licensee action is required in response to these observations.
During the conduct of the simulator portion of the operating tests, the following items were observed:
ITEM DESCRIPTION 1. Observed approximately 10 psi difference between the CRD drive pressure analog meter C11-R602 and the computer indication (ICS point). Simulator Work Request (SWR) 03-0006 generated.
2. Observed erratic digital output indication on one APRM/IRM recorder on the P680 reactor operator console. SWR 03-0007 generated.
Enclosure 3 WRITTEN EXAMINATIONS (RO/SRO)
RO/SRO Examination ADAMS Accession # ML030580531 6