MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30
[Table view] Category:License-Operator Examination Report (Non-Power Reactors Only)
MONTHYEARML0331101972003-11-0606 November 2003 Gfes Ltr Re October 2003 Results IR 05000440/20033012003-02-28028 February 2003 Er 05000440-03-301(DRS), on January 27 - February 6, 20033, Firstenergy Nuclear Operating Company, Perry Nuclear Power Plant. Initial License Examination Report 2003-02-28
[Table view] |
Text
ary 28, 2003
SUBJECT:
PERRY NUCLEAR POWER PLANT NRC INITIAL LICENSE EXAMINATION REPORT 50-440/03-301(DRS)
Dear Mr. Kanda:
On February 7, 2003, NRC examiners completed initial operator licensing examinations at your Perry Nuclear Power Station. The enclosed report presents the results of the examination.
The NRC examiners administered an initial license examination operating test during the weeks of January 27 and February 3, 2003. A written examination was administered by Perry Station training personnel on February 6, 2003. Five Reactor Operator (RO) and seven Senior Reactor Operator (SRO) applicants were administered license examinations. The results of the examinations were finalized on February 25, 2003. Twelve applicants passed all sections of their respective examinations and were issued applicable operator licenses.
In accordance with 10 CFR Part 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this examination.
Sincerely,
/RA/
Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-440 License Nos. NPF-58
Enclosures:
1. Operator Licensing Examination Report 50-440/03-301(DRS)
2. Simulation Facility Report 3. Written Examinations (RO & SRO)
REGION III==
Docket No. 50-440 License Nos. NPF-58 Report No: 50-440/03-301(DRS)
Licensee: FirstEnergy Nuclear Operating Company (FENOC)
Facility: Perry Nuclear Power Plant, Unit 1 Location: P.O. Box 97 A200 Perry, OH 44081 Dates: January 27, 2003 through February 6, 2003 Examiners: M. Bielby, Chief Examiner C. Phillips, Examiner B. Palagi, Examiner Approved by: Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety
SUMMARY OF FINDINGS ER 05000440-03-301(DRS), on 01/27-02/06/03, FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant. Initial License Examination Report.
The announced operator licensing initial examination was conducted by regional NRC examiners in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 8, Supplement 1, Addendum 1.
Examination Summary:
- Twelve applicants passed all sections of their respective examinations and were issued applicable operator licenses. (Section 4OA5.1).
REPORT DETAILS 4. OTHER ACTIVITIES (OA)
4OA5 Other
.1 Initial Licensing Examinations a. Examination Scope The NRC examiners conducted an announced operator licensing initial examination during the weeks of January 27 and February 3, 2003. The facility's training staff used the guidance established in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 8, Supplement 1, Addendum 1, to prepare the examination outline and to develop the written examination and operating test. The NRC examiners administered the operating test during the weeks of January 27 and February 3, 2003 and the written examination on February 6, 2003. Five Reactor Operator and seven Senior Reactor Operator applicants were examined.
b. Findings Written Examination The licensee developed the written examination. During their initial review, the examiners determined that the examination, as submitted by the licensee, was within the range of acceptability expected for a proposed examination. During examination validation the week of January 6, 2003, examination changes agreed upon between the NRC and the licensee were incorporated according to the guidance contained in NUREG-1021. The licensee had no post examination comments on the written examination.
Operating Test The NRC examiners determined that the operating test, as originally submitted by the
licensee, was within the range of acceptability expected for a proposed examination.
Examination changes, agreed upon between the NRC and the licensee, were made during the validation week in accordance with NUREG-1021 guidance.
Examination Results Five Reactor Operator applicants and seven Senior Reactor Operator applicants were administered written examinations and operating tests for initial operator licensing.
Twelve applicants passed all sections of their respective examinations and were issued applicable operator licenses.
.2 Examination Security a. Scope The examiners reviewed and observed the licensees implementation of examination security requirements during the examination preparation and administration.
b. Findings No Findings.
4OA6 Meeting(s)
Exit Meeting The chief examiner presented the examination teams preliminary observations and findings on February 7, 2003, to M and members of the Operations and Training Department staff. The licensee acknowledged the observations and findings presented. No proprietary information was identified during the examination or the exit meeting.
KEY POINTS OF CONTACT Licensee W. Kanda, Vice President-Nuclear T. Rausch, General Manager, Nuclear Power Plant Department D. Bowen, Licensing R. Collings, Training Manager R. Gemberling, Licensed Operator Requalification Training Lead V. Higaki, Manager, Regulatory Affairs R. Kearny, Operations Manager NRC R. Powell, Senior Resident Inspector J. Ellegood, Resident Inspector
LIST OF ACRONYMS USED ADAMS Agency-Wide Document Access and Management System DRS Division of Reactor Safety NRC Nuclear Regulatory Commission PARS Publicly Available Records RO Reactor Operator SRO Senior Reactor Operator
Enclosure 2 SIMULATION FACILITY REPORT Facility Licensee: Perry Nuclear Power Plant Facility Docket No.: 50-440 Operating Tests Administered: January 27 - February 5, 2003 The following documents observations made by the NRC examination team during the initial operator license examination. These observations do not constitute audit or inspection findings and are not, without further verification and review, indicative of non-compliance with 10 CFR 55.45(b). These observations do not affect NRC certification or approval of the simulation facility other than to provide information which may be used in future evaluations. No licensee action is required in response to these observations.
During the conduct of the simulator portion of the operating tests, the following items were observed:
ITEM DESCRIPTION 1. Observed approximately 10 psi difference between the CRD drive pressure analog meter C11-R602 and the computer indication (ICS point). Simulator Work Request (SWR) 03-0006 generated.
2. Observed erratic digital output indication on one APRM/IRM recorder on the P680 reactor operator console. SWR 03-0007 generated.
Enclosure 3 WRITTEN EXAMINATIONS (RO/SRO)
RO/SRO Examination ADAMS Accession # ML030580531 6