uly 29, 2002

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT 1 NRC INSPECTION REPORT 50-440/02-04(DRS)

Dear Mr. Kanda:

On June 27, 2002, the NRC completed an inspection at your Perry Nuclear Power Plant, Unit 1.

The enclosed report documents the inspection findings, which were discussed on June 27, 2002, with you and members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Specifically, this inspection focused on the design and performance capability of the emergency service water and the emergency closed cooling water systems to ensure the systems were capable of performing their required safety-related functions.

Based on the results of this inspection, the inspectors identified an issue of very low safety significance (Green) that was determined to involve a violation of NRC requirements. However, because of its very low safety significance and because it was entered into your corrective action program, the NRC is treating the issue as a Non-Cited Violation in accordance with Section VI.A.1 of the NRC s Enforcement Policy. If you deny this Non-Cited Violation, you should provide a response with a basis for your denial, within 30 days of the date of this inspection report, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Perry Nuclear Power Plant. In accordance with 10 CFR Part 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Mechanical Engineering Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 Enclosure: Inspection Report 50-440/02-04(DRS)

cc w/encl: B. Saunders, President - FENOC K. Ostrowski, Director, Nuclear Maintenance Department G. Dunn, Manager, Regulatory Affairs B. Coad, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, General Manager, Nuclear Power Plant Department Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health