Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000266/2009002 | 1 May 2009 | IR 05000266-09-002, 05000301-09-002, on 01/01/2009-03/31/2009, Point Beach Nuclear Plant, Units 1 & 2; Equipment Alignment and Maintenance Effectiveness | Boric Acid High winds High Radiation Area Ultimate heat sink Mission time Tornado Missile Hydrostatic Past operability Temporary Modification Functionality Assessment Condition Adverse to Quality Tornado-Generated Missile Significance Determination Process Tornado Missile Protection Large early release frequency Operability Determination Fire Protection Program Power change Flow Induced Vibration |
IR 05000266/2009006 | 8 May 2009 | IR 05000266-09-006; 05000301-09-006; NextEra Energy Point Beach, LLC; on 03/09/2009 - 03/27/2009; Point Beach Nuclear Power Plant, Unit 1 and Unit 2; Biennial Baseline Problem Identification and Resolution Inspection | Condition Adverse to Quality Significance Determination Process Operability Determination Power Uprate |
IR 05000266/2009008 | 8 April 2009 | IR 05000266-09-008 (Drs), 05000301-09-008 (DRS) on 11/25/08 - 03/09/09 (In-Office Review) for Point Beach, Units 1 and 2 | Significance Determination Process License Renewal |
IR 05000266/2009009 | 24 June 2009 | EA-09-012, Point Beach Nuclear Generating Plant, Units 1 and 2, NRC Inspection Report Nos. 05000266-09-009(DRS), 05000301-09-009(DRS) | |
IR 05000266/2009301 | 21 June 2009 | Er 05000266/2009301(DRS); 05000301/2009301(DRS); on 05/11/09 - 05/26/09; NextEra Energy, LLC; Point Beach Nuclear Plant, Units 1 and 2; Initial License Examination Report | Job Performance Measure |
L-2009-072, Duane Arnold Energy Center & Point Beach, Units 1 & 2 - Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits | 28 April 2009 | Duane Arnold Energy Center & Point Beach, Units 1 & 2 - Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits | Mururoa |
L-2009-098, Units 1 and 2 - Official Service List Change | 1 May 2009 | Units 1 and 2 - Official Service List Change | |
L-2009-115, Response to Apparent Violations Inspection Report | 7 May 2009 | Response to Apparent Violations Inspection Report | |
L-2009-122, Duane Arnold, and Point Beach, Units 1 and 2, Official Service List Change | 14 May 2009 | Duane Arnold, and Point Beach, Units 1 and 2, Official Service List Change | |
L-2009-131, Units 1 and 2 - Official Service List Change | 28 May 2009 | Units 1 and 2 - Official Service List Change | |
L-2009-134, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4 | 29 June 2009 | Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4 | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Fire Barrier Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Process Control Program Safeguards Contingency Plan Maintenance Rule Program Fire Protection Program Grace period Power Uprate |
ML090970225 | 20 April 2009 | Review of the 2008 (U2R29) Steam Generator Tube Inspection Report | |
ML090970331 | 6 April 2009 | Meeting Letter to Licensee for Mtg on 4/29/09 | |
ML090970334 | 6 April 2009 | Notice of Meeting with FPL Energy Point Beach, LLC Regarding the Progress of the Licensee'S Action in Response to Point Beach Nuclear Plant, Units 1 and 2, 2008 Nuclear Safety Culture Survey | |
ML090970583 | 6 April 2009 | Notice of Meeting with FPL Energy Point Beach to Discuss the Nrc'S End-of-Cycle Assessment of Point Beach Performance for 2008 | |
ML090980133 | 6 April 2009 | Notice of Meeting with FPL Energy Point Beach, LLC to Discuss the Nrc'S End-of-Cycle Assessment of Point Beach'S Performance for 2008 | |
ML091000647 | 8 April 2009 | Transmittal of Background Information to Support License Amendment Request 261 Interconnection System Impact Study | |
ML091200704 | 29 April 2009 | Presentation at 2008 End-of-Cycle Public Meeting | |
ML091200721 | 29 April 2009 | NRC Presentation Handouts for Point Beach 2008 End-of-Cycle Public Meeting | |
ML091200734 | 29 April 2009 | NRC Slides for Point Beach 2008 End-of-Cycle Public Meeting | |
ML091250566 | 7 April 2009 | Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Introduction Through Chapter 2, Section 2.5.7 | |
ML091250569 | 7 April 2009 | Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Chapter 2, Section 2.5.8 Through Appendices | |
ML091260577 | 5 May 2009 | Ltr. 05/05/09 Point Beach Re Operator Licensing Examination Approval | |
ML091340289 | 14 May 2009 | Summary of Meeting Between NRC Region III Management and NextEra Energy Point Beach LLC Representatives to Discuss the Nrc'S Assessment | |
ML091400193 | 20 May 2009 | Summary of Public Meeting to Discuss the Progress on Actions Taken in Response to a Nuclear Safety Culture Survey in 2008 - Point Beach Nuclear Plant | |
ML091490488 | 28 May 2009 | Notification of Potential Part 21 Report Re Air Circuit Breaker Deficiency | |
ML091600729 | 9 June 2009 | Acceptance Review for Mururoa V4F1 Supplied Air Suits | Mururoa |
ML091690567 | 10 May 2009 | 2009 Point Beach Nuclear Plant Initial License Examination Administered RO and SRO Initial Examinations and Answer Keys | Safe Shutdown Boric Acid Shutdown Margin Time to boil Fuel cladding Downpower |
ML091740670 | 21 June 2009 | Er 05000266-09-301 (Drs); 05000301-09-301 (DRS) on 05/11/09 - 05/26/09 for Point Beach, Units 1 and 2 | Job Performance Measure |
ML091810691 | 25 June 2009 | Transmittal of Replacement Figure 7.6-3 on Page 7.6-23 of 25 for FSAR Manual No. 80 | |
ML092590184 | 11 May 2009 | 2009 Point Beach Nuclear Plant Initial Examination Administrative Files | |
ML100920271 | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Administrative JPMs | Boric Acid Grab sample Nuclear Accident Reporting System Job Performance Measure Pressure Boundary Leakage |
ML100920272 | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Control Room JPMs | Job Performance Measure |
ML100920275 | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed In-Plant JPMs | Safe Shutdown Job Performance Measure |
ML100920278 | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Dynamic Simulator Scenarios | Power change Downpower |
ML100920294 | 11 May 2009 | 2009 Point Beach Initial License Examination ES-301-6 Forms | |
ML100920296 | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Written Examination | Safe Shutdown Boric Acid Shutdown Margin Time to boil Fuel cladding |
NRC 2008-0063, Technical Requirements Manual Change Summary | 25 June 2009 | Technical Requirements Manual Change Summary | Boric Acid |
NRC 2009-0019, 2009 Point Beach Nuclear Plant Initial Examination Outline Submittal | 11 May 2009 | 2009 Point Beach Nuclear Plant Initial Examination Outline Submittal | |
NRC 2009-0022, 2009 Point Beach Initial License Examination ES-301-6 Forms | 11 May 2009 | 2009 Point Beach Initial License Examination ES-301-6 Forms | |
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Administrative JPMs | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Administrative JPMs | Boric Acid Grab sample Nuclear Accident Reporting System Job Performance Measure Pressure Boundary Leakage |
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Control Room JPMs | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Control Room JPMs | Job Performance Measure |
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Dynamic Simulator Scenarios | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Dynamic Simulator Scenarios | Downpower |
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed In-Plant JPMs | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed In-Plant JPMs | Safe Shutdown Job Performance Measure |
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Written Examination | 11 May 2009 | 2009 Point Beach Initial License Examination Proposed Written Examination | Safe Shutdown Boric Acid Shutdown Margin Time to boil Fuel cladding |
NRC 2009-0026, Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance Matrix | 8 May 2009 | Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance Matrix | Large early release frequency Deep Dose Equivalent Backfit |
NRC 2009-0030, License Amendment Request 261, Extended Power Uprate | 7 April 2009 | License Amendment Request 261, Extended Power Uprate | Safe Shutdown Unanalyzed Condition Boric Acid Anticipated operational occurrence Hydrostatic Design basis earthquake Power-Operated Valves Power Operated Valves Fuel cladding Power change Flow Induced Vibration GOTHIC Power Uprate Affidavit |
NRC 2009-0032, License Amendment Request 250, Corporation Name Change | 17 April 2009 | License Amendment Request 250, Corporation Name Change | Safe Shutdown Unanalyzed Condition Fuel cladding Fire Protection Program |
NRC 2009-0033, Response to Request for Additional Information GSI-191/GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors | 7 April 2009 | Response to Request for Additional Information GSI-191/GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors | Mission time Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Earthquake |
NRC 2009-0037, Response to Request for Additional Information License Amendment Request 247 Spent Fuel Pool Storage Criticality Control | 14 April 2009 | Response to Request for Additional Information License Amendment Request 247 Spent Fuel Pool Storage Criticality Control |