Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000266/20090021 May 2009IR 05000266-09-002, 05000301-09-002, on 01/01/2009-03/31/2009, Point Beach Nuclear Plant, Units 1 & 2; Equipment Alignment and Maintenance EffectivenessBoric Acid
High winds
High Radiation Area
Ultimate heat sink
Mission time
Tornado Missile
Hydrostatic
Past operability
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Tornado-Generated Missile
Significance Determination Process
Tornado Missile Protection
Large early release frequency
Operability Determination
Fire Protection Program
Power change
Flow Induced Vibration
IR 05000266/20090068 May 2009IR 05000266-09-006; 05000301-09-006; NextEra Energy Point Beach, LLC; on 03/09/2009 - 03/27/2009; Point Beach Nuclear Power Plant, Unit 1 and Unit 2; Biennial Baseline Problem Identification and Resolution InspectionCondition Adverse to Quality
Significance Determination Process
Operability Determination
Power Uprate
IR 05000266/20090088 April 2009IR 05000266-09-008 (Drs), 05000301-09-008 (DRS) on 11/25/08 - 03/09/09 (In-Office Review) for Point Beach, Units 1 and 2Significance Determination Process
License Renewal
IR 05000266/200900924 June 2009EA-09-012, Point Beach Nuclear Generating Plant, Units 1 and 2, NRC Inspection Report Nos. 05000266-09-009(DRS), 05000301-09-009(DRS)
IR 05000266/200930121 June 2009Er 05000266/2009301(DRS); 05000301/2009301(DRS); on 05/11/09 - 05/26/09; NextEra Energy, LLC; Point Beach Nuclear Plant, Units 1 and 2; Initial License Examination ReportJob Performance Measure
L-2009-072, Duane Arnold Energy Center & Point Beach, Units 1 & 2 - Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits28 April 2009Duane Arnold Energy Center & Point Beach, Units 1 & 2 - Request for Use of Delta Protection Mururoa V4F1 R Supplied Air SuitsMururoa
L-2009-098, Units 1 and 2 - Official Service List Change1 May 2009Units 1 and 2 - Official Service List Change
L-2009-115, Response to Apparent Violations Inspection Report7 May 2009Response to Apparent Violations Inspection Report
L-2009-122, Duane Arnold, and Point Beach, Units 1 and 2, Official Service List Change14 May 2009Duane Arnold, and Point Beach, Units 1 and 2, Official Service List Change
L-2009-131, Units 1 and 2 - Official Service List Change28 May 2009Units 1 and 2 - Official Service List Change
L-2009-134, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 429 June 2009Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Fire Barrier
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Process Control Program
Safeguards Contingency Plan
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
ML09097022520 April 2009Review of the 2008 (U2R29) Steam Generator Tube Inspection Report
ML0909703316 April 2009Meeting Letter to Licensee for Mtg on 4/29/09
ML0909703346 April 2009Notice of Meeting with FPL Energy Point Beach, LLC Regarding the Progress of the Licensee'S Action in Response to Point Beach Nuclear Plant, Units 1 and 2, 2008 Nuclear Safety Culture Survey
ML0909705836 April 2009Notice of Meeting with FPL Energy Point Beach to Discuss the Nrc'S End-of-Cycle Assessment of Point Beach Performance for 2008
ML0909801336 April 2009Notice of Meeting with FPL Energy Point Beach, LLC to Discuss the Nrc'S End-of-Cycle Assessment of Point Beach'S Performance for 2008
ML0910006478 April 2009Transmittal of Background Information to Support License Amendment Request 261 Interconnection System Impact Study
ML09120070429 April 2009Presentation at 2008 End-of-Cycle Public Meeting
ML09120072129 April 2009NRC Presentation Handouts for Point Beach 2008 End-of-Cycle Public Meeting
ML09120073429 April 2009NRC Slides for Point Beach 2008 End-of-Cycle Public Meeting
ML0912505667 April 2009Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Introduction Through Chapter 2, Section 2.5.7
ML0912505697 April 2009Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Chapter 2, Section 2.5.8 Through Appendices
ML0912605775 May 2009Ltr. 05/05/09 Point Beach Re Operator Licensing Examination Approval
ML09134028914 May 2009Summary of Meeting Between NRC Region III Management and NextEra Energy Point Beach LLC Representatives to Discuss the Nrc'S Assessment
ML09140019320 May 2009Summary of Public Meeting to Discuss the Progress on Actions Taken in Response to a Nuclear Safety Culture Survey in 2008 - Point Beach Nuclear Plant
ML09149048828 May 2009Notification of Potential Part 21 Report Re Air Circuit Breaker Deficiency
ML0916007299 June 2009Acceptance Review for Mururoa V4F1 Supplied Air SuitsMururoa
ML09169056710 May 20092009 Point Beach Nuclear Plant Initial License Examination Administered RO and SRO Initial Examinations and Answer KeysSafe Shutdown
Boric Acid
Shutdown Margin
Time to boil
Fuel cladding
Downpower
ML09174067021 June 2009Er 05000266-09-301 (Drs); 05000301-09-301 (DRS) on 05/11/09 - 05/26/09 for Point Beach, Units 1 and 2Job Performance Measure
ML09181069125 June 2009Transmittal of Replacement Figure 7.6-3 on Page 7.6-23 of 25 for FSAR Manual No. 80
ML09259018411 May 20092009 Point Beach Nuclear Plant Initial Examination Administrative Files
ML10092027111 May 20092009 Point Beach Initial License Examination Proposed Administrative JPMsBoric Acid
Grab sample
Nuclear Accident Reporting System
Job Performance Measure
Pressure Boundary Leakage
ML10092027211 May 20092009 Point Beach Initial License Examination Proposed Control Room JPMsJob Performance Measure
ML10092027511 May 20092009 Point Beach Initial License Examination Proposed In-Plant JPMsSafe Shutdown
Job Performance Measure
ML10092027811 May 20092009 Point Beach Initial License Examination Proposed Dynamic Simulator ScenariosPower change
Downpower
ML10092029411 May 20092009 Point Beach Initial License Examination ES-301-6 Forms
ML10092029611 May 20092009 Point Beach Initial License Examination Proposed Written ExaminationSafe Shutdown
Boric Acid
Shutdown Margin
Time to boil
Fuel cladding
NRC 2008-0063, Technical Requirements Manual Change Summary25 June 2009Technical Requirements Manual Change SummaryBoric Acid
NRC 2009-0019, 2009 Point Beach Nuclear Plant Initial Examination Outline Submittal11 May 20092009 Point Beach Nuclear Plant Initial Examination Outline Submittal
NRC 2009-0022, 2009 Point Beach Initial License Examination ES-301-6 Forms11 May 20092009 Point Beach Initial License Examination ES-301-6 Forms
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Administrative JPMs11 May 20092009 Point Beach Initial License Examination Proposed Administrative JPMsBoric Acid
Grab sample
Nuclear Accident Reporting System
Job Performance Measure
Pressure Boundary Leakage
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Control Room JPMs11 May 20092009 Point Beach Initial License Examination Proposed Control Room JPMsJob Performance Measure
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Dynamic Simulator Scenarios11 May 20092009 Point Beach Initial License Examination Proposed Dynamic Simulator ScenariosDownpower
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed In-Plant JPMs11 May 20092009 Point Beach Initial License Examination Proposed In-Plant JPMsSafe Shutdown
Job Performance Measure
NRC 2009-0022, 2009 Point Beach Initial License Examination Proposed Written Examination11 May 20092009 Point Beach Initial License Examination Proposed Written ExaminationSafe Shutdown
Boric Acid
Shutdown Margin
Time to boil
Fuel cladding
NRC 2009-0026, Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance Matrix8 May 2009Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance MatrixLarge early release frequency
Deep Dose Equivalent
Backfit
NRC 2009-0030, License Amendment Request 261, Extended Power Uprate7 April 2009License Amendment Request 261, Extended Power UprateSafe Shutdown
Unanalyzed Condition
Boric Acid
Anticipated operational occurrence
Hydrostatic
Design basis earthquake
Power-Operated Valves
Power Operated Valves
Fuel cladding
Power change
Flow Induced Vibration
GOTHIC
Power Uprate
Affidavit
NRC 2009-0032, License Amendment Request 250, Corporation Name Change17 April 2009License Amendment Request 250, Corporation Name ChangeSafe Shutdown
Unanalyzed Condition
Fuel cladding
Fire Protection Program
NRC 2009-0033, Response to Request for Additional Information GSI-191/GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors7 April 2009Response to Request for Additional Information GSI-191/GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water ReactorsMission time
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Earthquake
NRC 2009-0037, Response to Request for Additional Information License Amendment Request 247 Spent Fuel Pool Storage Criticality Control14 April 2009Response to Request for Additional Information License Amendment Request 247 Spent Fuel Pool Storage Criticality Control