Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
05000409/LER-1979-019, Forwards LER 79-019/01T-0 | 26 December 1979 | Forwards LER 79-019/01T-0 | |
05000409/LER-1982-007, Forwards LER 82-007/03L-0.Detailed Event Analysis Submitted | 14 June 1982 | Forwards LER 82-007/03L-0.Detailed Event Analysis Submitted | |
05000409/LER-1982-008, Forwards LER 82-008/03L-0.Detailed Event Analysis Submitted | 16 June 1982 | Forwards LER 82-008/03L-0.Detailed Event Analysis Submitted | |
05000409/LER-1982-012, Forwards LER 82-012/03L-0.Detailed Event Analysis Submitted | 18 June 1982 | Forwards LER 82-012/03L-0.Detailed Event Analysis Submitted | |
05000409/LER-1982-013, Forwards LER 82-013/03L-0.Detailed Event Analysis Submitted | 1 July 1982 | Forwards LER 82-013/03L-0.Detailed Event Analysis Submitted | |
05000409/LER-1982-014, Forwards LER 82-014/01T-0.Detailed Event Analysis Submitted | 9 June 1982 | Forwards LER 82-014/01T-0.Detailed Event Analysis Submitted | |
05000409/LER-1982-015, Forwards LER 82-015/01T-0.Detailed Event Analysis Submitted | 17 June 1982 | Forwards LER 82-015/01T-0.Detailed Event Analysis Submitted | |
05000409/LER-1982-016, Forwards LER 82-016/03L-0.Detailed Event Analysis Encl | 29 July 1982 | Forwards LER 82-016/03L-0.Detailed Event Analysis Encl | |
05000409/LER-1983-001, Forwards LER 83-001/03L-0 & Updated LER 82-020/03X-1. Detailed Event Analysis Encl | 21 April 1983 | Forwards LER 83-001/03L-0 & Updated LER 82-020/03X-1. Detailed Event Analysis Encl | |
ML17194A949 | 25 February 1981 | Forwards LER 81-001/02L-0 | |
ML18023A047 | 13 August 1985 | Notifies That State of Mn & Local Emergency Plans Adequate. FEMA Verification of Public Alerting & Notification Sys Conditional on FEMA Verification of Sys Per NUREG-0654/ FEMA-REP-1,Rev 1,App 3 & FEMA-43 | |
ML18041A082 | 11 June 1980 | Forwards Endorsement 35 to ANI Policy NF-217 Per Agreement B-62 | |
ML18041A116 | 13 April 1984 | Requests Signed Ack Forms for Encl Transmittal Ltrs Re Emergency Planning & Safeguards Info to Assist in Maintaining Accurate & Consistent Document Control Program | |
ML18041A211 | 16 November 1989 | Responds to Generic Ltr 89-19 Re Request for Action Re Resolution of USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants. Actions or Recommendations in Generic Ltr Will Not Be Performed | |
ML20054F096 | 10 June 1982 | Requests Permission to Increase Primary Sys Temp Above 212 F,Predicated by 820605 Shutdown Due to Primary Coolant Alpha Activity in Excess of Tech Spec Limits | |
ML20054F140 | 7 June 1982 | Forwards Table, Emergency Response Capabilities During Operational Conditions 1-3, as Alternative to Table B-1 of NUREG-0654.Exemptions from Min Staffing Requirements Requested | |
ML20054F176 | 9 June 1982 | Forwards Monthly Operating Rept for May 1982 | |
ML20054F181 | 9 June 1982 | Forwards Response to Generic Ltr 82-10 Re NUREG-0737,Items I.A.1.3.1,I.A.1.3.2,I.C.1,I.D.1,I.D.2,II.B.1,II.B.2.3, II.D.1.2,II.D.1.3,II.F.2,II.K.3.18,II.K.3.30,II.K.3.31, III.A.1.2 & III.D.3.4 | |
ML20054F965 | 26 May 1982 | Forwards Small Scale Exercise, 811021,final Rept Evaluation.Deficiencies Noted in Exercise.Time Schedule of Corrections Should Be Available by End of May 1982 for Both State of Mn & Wi | |
ML20054G113 | 15 June 1982 | Requests Exemption from NUREG-0654,Revision 1 Table B-1 Shift Augmentation Requirement.Exemption Justified by Small Size & Simplified Design of Plant.Tables Depicting Proposed Emergency Response Capabilities Encl | |
ML20054H166 | 14 June 1982 | Forwards Addl Info Re RCPB Leakage Detector,Per 820317 Request & LACBWR Primary Piping & Reactor Vessel Leak Detection Sys Performance | |
ML20054H445 | 4 June 1982 | Forwards Public Version of Issue 1 to Emergency Plan Implementing Procedure EPP-21, Prompt Public Notification Sys | |
ML20054H675 | 14 June 1982 | Forwards Check in Response to Order Imposing Civil Monetary Penalty | |
ML20054J297 | 14 June 1982 | Forwards Util Review of NRC Re SEP Topic VI-10.A Concerning Testing of Reactor Trip Sys & Esfs,Including Time Response Testing.Licensee Testing Program Meets Intent of Current Licensing Criteria | |
ML20054K858 | 29 June 1982 | Forwards Potential Accident Consequence Assessment Atmospheric Dispersion Model Calculations, in Support of SEP Topic II.2.C Re Atmospheric Transport & Diffusion Characteristic for Accident Analysis | |
ML20054L511 | 29 June 1982 | Requests Exemption from Requirement in 10CFR50.54(w) Re Onsite Property Damage Insurance for Facility.Existing Insurance Adequate to Fully Decontaminate & Clean Up Plant in Event of Major Accident | |
ML20054M678 | 2 July 1982 | Forwards Evaluation of SEP Topic III-1, Classification of Structures,Sys & Components, Per NRC 820607 Request.Errors Noted in Evaluation Listed | |
ML20055B662 | 16 July 1982 | Notifies That Proposed Dates for Implementation of Increased Min Shift Staffing at Facility Postponed to 830101 & 840101, Per Secy 82-111.Existing Tech Specs Will Be Utilized in Interim | |
ML20055H637 | 25 July 1990 | Forwards Decommissioning Fund Rept for Plant | |
ML20056E260 | 12 August 1993 | Forwards Nonproprietary & Proprietary Version of Analysis of Potential Blast Effects on LACBWR Reactor Bldg Due to 16 Inch Natural Gas Pipeline Failure,Suppl Analysis for Fast Closing Valve. Proprietary Version Withheld | |
ML20056E268 | 11 May 1993 | Requests That Proprietary Analysis of Potential Blast Effects on LACBWR Reactor Bldg Due to 16 Inch Natural Gas Pipeline Failure,Suppl Analysis for Fast Closing Valve Be Withheld,Per 10CFR2.790(b)(4) | |
ML20058P128 | 9 December 1993 | Forwards Changes to Physical Security Plan,Contingency Plan & Guard Force Training & Qualification Plan.Encls Withheld (Ref 10CFR2.790(d)) | |
ML20059G613 | 1 November 1993 | Responds to Re Violations Noted in Insp Rept 50-409/93-01 on 930903 & 22 & 24.Corrective Actions: Reassigned Mechanics & Instrument Technician to LACBWR Staff | |
ML20062A024 | 26 September 1978 | Forwards Copies of 5 Repts on Seismic & Stress Analysis of Facil Piping Sys IAW 780808 Agreement W/Nrc to Furnish Addl Info for Conversion of Provisional Oper Lic DPR-45 to a Full Term Oper Lic | |
ML20062A293 | 5 October 1978 | Forwards Monthly Oper Rept for Sept,1978 | |
ML20062A591 | 4 October 1978 | Forwards Structural Analysis Rept for BWR Spent Fuel Pool Structure & Thermal-Hydraulic Design Analysis Rept for BWR Hydraulic Design Analysis for BWR High Density Fuel Storage Racks | |
ML20062A684 | 26 September 1978 | Forwards Special Rept 78-02 on Results of Sampling & Analysis W/Addl Operating Info for Five Occasions When Reactor Thermal Power Changed More than 15% of Rated Thermal Power within 1 H While in Operating Conditions 1 or 2 | |
ML20062B529 | 26 October 1978 | Forwards Info Requested in Re SEP Topic III-12 on Environ Qualification of safety-related Equipment | |
ML20062B534 | 26 October 1978 | Forwards Addl Info Requested in NRC Re Review of Environ Impact Evaluation of Spent Fuel Pool Rack Mod, Submitted in Util .Response to Question 9 Being Prepared | |
ML20062D070 | 9 November 1978 | Forwards LER 78-011/01T-0 | |
ML20062D579 | 30 October 1978 | RO 78-11 on 781029 Re Abnormal Degradation Discovered in Primary Reactor Containment During Periodic Type a Surveillance Leakage Rate Testing.Repairs Will Be Made Following Depressurization of Primary Reactor Containment | |
ML20062D601 | 20 November 1978 | Forwards Response to Question 9 Contained in 780928 NRC Ltr Re Spent Fuel Pool Mod.Impact of Pool Mod on Pool Leakage Is Acceptable.No Increase in Leak Rate Is Anticipated for 4-5 Years | |
ML20062D931 | 20 July 1982 | Forwards Sargent & Lundy Rept Project 6101-32, in Response to 790807 Request for Addl Info Re SEP Topic III-7.B, Design Criteria,Load Combination & Reactor Cavity Design Criteria | |
ML20062E028 | 22 July 1982 | Forwards Public Version of Issue 5 to Radiological Emergency Response Plan Implementing Procedure EPP-2, Organization & Operations During Emergencies | |
ML20062E103 | 27 November 1978 | Forwards LER 78-012/01T-0 |