ML20062D931

From kanterella
Jump to navigation Jump to search
Forwards Sargent & Lundy Rept Project 6101-32, in Response to 790807 Request for Addl Info Re SEP Topic III-7.B, Design Criteria,Load Combination & Reactor Cavity Design Criteria
ML20062D931
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 07/20/1982
From: Linder F
DAIRYLAND POWER COOPERATIVE
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML20062D936 List:
References
TASK-03-07.B, TASK-3-7.B, TASK-RR LAC-8410, NUDOCS 8208060269
Download: ML20062D931 (1)


Text

D DA/RYLAND

[k COOPERAT/VE

  • P.O BOX 817
  • 2615 EAST AV SOUTH LA CROSSE. WISCONSIN 54601 (608) 788 4 000 July 20, 1982 In reply, please refer to LAC-8410 DOCKET NO. 50-409 Director of Nuclear Reactor Regulation ATTN:

Mr. Dennis M.

Crutchfield, Chief Operating Reactors Branch #5 Division of Operating Reactors U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555

SUBJECT:

DAIRYLAND POWER COOPERI ?IVE LA CROSSE BOILING WATER REACTOR (LACBWR)

PROVISIONAL OPERATING LICENSE NO. DPR-45 SEP TOPIC III-7.B - DESIGN CRITERIA, LOAD COMBINATION, AND REACTOR CAVITY DESIGN CRITERIA

Reference:

(1)

NRC Letter, Zieman to Linder, dated August 9, 1979.

Gentlemen:

Reference (1) requested LACBWR to provide additional information desired for your evaluation of the above SEP topic.

Enclosed is a copy of_Sargent and Lundy Report, Project No. 6101-32, which is our response to subject request.

This report also contains information on other LACBWR structural topics, also addressed in Reference 1.

The report is enclosed in its entirety for reasons of clarity.

Very truly yours, DAIRYLAND POWER COOPERATIVE

/2/Z4L Frank Linder, General Manager FL: HAT:af Enclosure cc:

J.

G. Keppler, Reg. Adm., NRC-Reg. III j

NRC Resident Inspector g y 1

DR ADO K O 00 PDR P

.~.

-.