Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
BYRON 2003-0093, Issuance of Core Operating Limits Report for Byron Unit One Cycle 137 October 2003Issuance of Core Operating Limits Report for Byron Unit One Cycle 13Shutdown Margin
BYRON 2003-0094, September 2003 Monthly Operating Report for Byron Station, Units 1 and 215 October 2003September 2003 Monthly Operating Report for Byron Station, Units 1 and 2Offsite Dose Calculation Manual
BYRON 2003-0110, October 2003 Monthly Operating Report for Byron Station, Units 1 and 214 November 2003October 2003 Monthly Operating Report for Byron Station, Units 1 and 2Offsite Dose Calculation Manual
BYRON 2003-0114, Sixty-Day Response to NRC Bulleting 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity.12 December 2003Sixty-Day Response to NRC Bulleting 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity.Boric Acid
VT-2
Through-Wall Leak
BYRON 2003-0115, Sixty-Day Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.12 December 2003Sixty-Day Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.Boric Acid
VT-2
BYRON 2003-0116, November 2003 Monthly Operating Report for Byron Station Units 1 and 215 December 2003November 2003 Monthly Operating Report for Byron Station Units 1 and 2Offsite Dose Calculation Manual
IR 05000454/200300630 October 2003IR 05000454-03-006, IR 05000455-03-006; on 07/01/2003-09/30/2003; Byron Station; Units 1 & 2; Maintenance Effectiveness, Access Control to Radiologically Significant AreasBoric Acid
High Radiation Area
Fire Barrier
Stroke time
Internal Flooding
Hydrostatic
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Operability Determination
Substantial potential for an overexposure
Power change
Overexposure
IR 05000454/200300830 October 2003IR 05000454-03-008, on 10/01/03 - 10/03/03, Byron Station, Unit 1; Special Inspection for Fuel Movement IncidentCondition Adverse to Quality
Significance Determination Process
Fuel cladding
IR 05000454/200301029 December 2003IR 05000454-03-010(DRS); 05000455-03-010(DRS); 12/01/03 - 12/05/03; Byron Station; Units 1 and 2; Emergency Preparedness Specialist Report
ML0328202472 October 2003Request for a License Amendment to Revise Psv Lift Settings - Byron/Braidwood Units 1 and 2
ML0328205067 October 2003Questions Regarding SX AOT Extension RequestProbabilistic Risk Assessment
Large early release frequency
ML03283009430 October 2003Request for Additional Information Regarding a One Time Extension of the Essential Service Water Completion time....MB9547, MB9548, MB9545, and MB9546Probabilistic Risk Assessment
Large early release frequency
ML03283045519 November 2003Units 1 and 2, Package, Re Completion Time from 24 Hours to 7 Days for One Inoperable Instrument Bus InverterSafe Shutdown
High winds
Probabilistic Risk Assessment
Large early release frequency
Earthquake
ML0328804573 October 2003Notification of Pending Changes to the Emergency Response Data System
ML03289057830 October 2003Revision to Safety Evaluation Supporting License Amendments Approving an Increase in Reactor Power
ML03293010020 October 2003Re Public Meeting to Discuss Operation Above the Licensed Thermal Power Limits at the Byron StationPower change
ML03295064623 October 2003La Salle, Units 1 & 2, Limerick, Units 1 & 2, Oyster Creek, Peach Bottom, Units 2 & 3, Quad Cities, Units 1 & 2, Three Mile Island - Reply to Response to OrderFitness for Duty
ML03297010219 November 2003Orders Modifying Licenses for Revised Design Basis Threat and for Training and Physical Fitness Enhancements Applicable to Security Force Personnel
ML0331102246 November 2003GFES-NO Ltr Re October 2003 ResultsGeneric Fundamentals Examination
ML03316052021 November 2003Notice of Meeting with Exelon Generation Company, LLC Re Licensing Activities
ML0331804369 November 2003G20030685/LTR-03-0729 - Bob Meyer Ltr. Fatigue Rule - 16 Hour WordingFatigue Rule
ML03323022512 November 2003Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application.Anticipated operational occurrence
Probabilistic Risk Assessment
Fuel cladding
Coast down
ML03323027718 November 2003Letter to Licensees Confirming Public Meeting on Byron Station Dtd 12/02/03
ML03323028018 November 2003Notice of Licensee Meeting with Exelon Generation Co., LLC Re Licensee Decision-Making Process
ML03324016418 November 2003Response to Request for Additional Information - WCAP-15872-NP, Rev. 0 Use of Alternate Decay Heat Removal in Mode 6 Refueling.Ultimate heat sink
ML03325055619 November 2003Units 1 and 2, Technical Specifications, Re Completion Time from 24 Hours to 7 Days for One Inoperable Instrument Bus Inverter
ML03330021120 November 2003FOIA/PA-2003-0444 - Resp 1 - Final
ML0333502693 December 2003G20030688, G20030689, G20030691 - 12/18/03, Visit by Mr. John Skolds, Chief Nuclear Officer for Exelon Nuclear and Mr. Jeffrey A. Benjamin, Vice President, Licensing and Regulatory Affairs; Nrc'S Oversight & Assess Chart
ML0333606882 December 2003Response to Order for Compensatory Measures Related to Access Authorization
ML03339014031 October 2003OI-3-2001-044, Byron, Release of OI Synopsis
ML03342015112 December 2003Bryon, Unit 1, Evaluation of Steam Generator Inservice Inspection Summary Report, TAC No. MC0962
ML0334212895 December 2003Westinghouse - NSAL 03-12 - 12/05/03 Crossflow Ultrasonic Measurement System
ML0334403489 December 2003Meeting Handout to Discuss Licensing Issues and Upcoming Licensing Activities with the Exelon Fleet of Nuclear PlantsSurveillance Frequency Control Program
ML03352056018 December 2003Re Information Request for an NRC Biennial Permanent Modifications and 10 CFR 50.59 Baseline InspectionCommercial Grade Dedication
ML0335603029 December 2003Exelon/Amergen 180-Day Response to NRC Generic Letter 2003-01, Control Room Habitability.Safe Shutdown
Reactor Vessel Water Level
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Design basis earthquake
Fire Protection Program
Power Uprate
ML04009013317 December 2003GFE Registration Letter 12/17/04 Re March 2004 Examination (Multiple Addressees)Generic Fundamentals Examination
ML04013081510 December 2003Initial RO Examination 12/2003Safe Shutdown
Loop seal
Power change
ML04013081610 December 2003Initial SRO Examination 12/2003Safe Shutdown
Shutdown Margin
Loop seal
Power change
ML0401405511 December 2003Initial Submittal of Administrative Jpms for Byron Initial Examination - Dec 2003Shutdown Margin
Nuclear Accident Reporting System
Job Performance Measure
ML0401407231 December 2003Initial Submittal of Walkthrough Jpms for Byron Initial Examination - Dec 2003Job Performance Measure
ML0401407461 December 2003Initial Submittal of the Scenarios for Byron Initial Examination - Dec 2003Boric Acid
Post Accident Monitoring
Power change
ML0401407521 December 2003Initial Submittal of Written Exam for Byron Initial Examination - Dec 2003Safe Shutdown
Shutdown Margin
Loop seal
Deep Dose Equivalent
Power change
ML0401407781 December 2003Final As-Administered Administrative Jpms for Byron Initial Examination - Dec 2003Shutdown Margin
Nuclear Accident Reporting System
Job Performance Measure
ML0401407861 December 2003Final As-Administered Walkthrough Jpms for Byron Initial Examination - Dec 2003Job Performance Measure
ML0401407871 December 2003Final as Administered Scenarios for Byron Initial Examination - Dec 2003Boric Acid
Post Accident Monitoring
Power change
ML0402800151 December 2003Various Checklist for Byron Initial Examination - December 2003
ML0402800181 December 2003Miscellaneous Correspondence for Byron Initial Examination - December 2003Job Performance Measure
Generic Fundamentals Examination
ML0402800201 December 2003Examination Outline Submittal for Byron Initial Examination - December 2003Shutdown Margin
Job Performance Measure
ML0402800211 December 2003Documents Related to Initial Exam Submittal and NRC Comments on Operating Test and ES-401-9 for NRC Comments on Written Exam for Byron Initial Examination - December 2003Power change
ML07268017823 October 2003E-mail from G. Cwalina, NRR to J. Calvo, NRR and T. Quay, NRR on Letter with Questions to Westinghouse Concerning Challenges to the Crossflow Instrument Design