ML033250556
| ML033250556 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood |
| Issue date: | 11/19/2003 |
| From: | NRC/NRR/DLPM |
| To: | |
| Shared Package | |
| ML033290044 | List: |
| References | |
| TAC MB6569, TAC MB6570, TAC MB6571, TAC MB6572 | |
| Download: ML033250556 (2) | |
Text
Inverters-Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Inverters-Operating LCO 3.8.7 APPLICABILITY:
Four instrument bus inverters shall be OPERABLE.
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One instrument bus A.1
NOTE---------
inverter inoperable.
Enter applicable Conditions and Required Actions of LCO 3.8.9, "Distribution Systems-Operating" with any instrument bus de-energized.
Restore inverter to 7 days OPERABLE status.
B. Required Action and B.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
AND B.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I
BYRON -
UNITS I & 2 3.8.7 - 1 Amendment 135
Inverters-Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Inverters-Operating LCO 3.8.7 APPLICABILITY:
Four instrument bus inverters shall be OPERABLE.
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One instrument bus A.1
NOTE---------
inverter inoperable.
Enter applicable Conditions and Required Actions of LCO 3.8.9, "Distribution Systems-Operating" with any instrument bus de-energized.
Restore inverter to 7 days OPERABLE status.
B. Required Action and B.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
AND B.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I
BRAIDWOOD -
UNITS 1 & 2 3.8.7 - I Amendment 129