Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
LR-N07-0023, Response to RAIs on LCR S06-07 Refueling Operations - Decay Time8 March 2007Response to RAIs on LCR S06-07 Refueling Operations - Decay TimeUltimate heat sink
LR-N07-0032, Response to RAIs on LCR S06-06 Request for Change to Technical Specifications Containment Ventilation System Containment Isolation Valves20 February 2007Response to RAIs on LCR S06-06 Request for Change to Technical Specifications Containment Ventilation System Containment Isolation Valves
LR-N10-0227, Response to Request for Additional Information - License Amendment Request: One-Time On-Line Safety-Related Battery Replacement25 June 2010Response to Request for Additional Information - License Amendment Request: One-Time On-Line Safety-Related Battery ReplacementSafe Shutdown
Power change
ML02134010020 May 2002RAI, Relief Requests S1-RR-B01 and S1-RR-C01
ML0218905679 July 2002Request for Additional Information Request for Change to Technical Specification 3.6.2.3 Containment Cooling System
ML0223101556 September 2002Request for Additional Information Request for Change to Technical Specifications - Refuel Operations - Fuel Decay Time Prior to Commencing Core Alterations or Movement of Irradiated Fuel
ML02326033622 November 2002RAI, Bulliten 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day ResponseBoric Acid
VT-2
Pressure Boundary Leakage
ML03052003320 February 2003Request for Additional Information (Rai), Request for Change to Technical Specifications on Steam Generator Low-Low Trip Setpoint
ML03077004418 March 2003Request for Additional Information (Rai), Request for Change to Technical Specifications Relating to Containment Closure and Fuel Handling Area Ventilation RequirementsLarge early release frequency
ML03176001730 June 2003Request for Additional Information (RAI) Proposed Alternative to Adopt a Risk-informed Inservice Inspection Program
ML03205000324 July 2003Facsimile Transmission, Issues to Be Discussed in an Upcoming Conference Call
ML0321700315 August 2003RAI, Changes to Technical Specifications for Pressure Sensor Response Time Testing
ML03220013119 August 2003RAI, Request for Change to Technical Specifications on Fuel Storage Pool Boron Concentration, Refueling Pool Boron Concentration and Fuel Assembly Storage (TAC MB634 and MB6346)
ML0330802834 November 2003Request for Additional Information Request for Changes to License Condition 2.C.10Safe Shutdown
ML03316008212 November 2003Request for Additional Information, Steam Generator Tube Inspections Annual ReportCondition Adverse to Quality
ML04022081122 January 2004Request for Additional Information Order EA-03-009, Reactor Pressure Vessel Inspections
ML04170041524 June 2004Facsimile Transmission, Draft Request for Additional Information (RAI) to Be Discussed in an Upcoming Conference Call
ML04175046821 June 2004RAI, Security Plan Sections 10-19
ML04189016816 July 2004RAI, Request for Change to Technical Specifications - Relaxation of Requirements Applicable During Movement of Irradiated Fuel
ML04210017623 July 2004RAI, Safeguards Contingency Plan and Section 9.4.1 of Physical Security Plan
ML04222005023 July 2004RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan
ML04237010624 August 2004Request for Additional Information Implementation of Alternate Source Term
ML04254017110 September 2004RAI, NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized- Water Reactors.
ML0428005546 October 2004Request for Additional Information Relief Requests S1-RR-04-V01 and V02Stroke time
ML0430802643 November 2004Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call
ML04308027610 November 2004RAI, Amendment to Reflect Addition of the Chilled Water System to Provide Cooling to the Containment Fan Cooling UnitsOperator Manual Action
ML0431002635 November 2004Receipt of Draft ResponsesOffsite Circuit
ML04313036116 November 2004Request for Additional Information Amendment to Implement Alternative Source Term
ML04327012214 December 2004RAI, Approval to Extend Risk-Informed Inservice Inspection Program
ML04327014224 November 2004RAI, Amendment Request to Modify TS Definition of Operable (Tac MC3857 and MC3858)
ML05019017821 March 2005Request for Additional Information Regarding Steam Generator Tube Inspection Conducted During 2003 Refueling Outage
ML05040041214 February 2005RAI, Amendment to Reflect Addition of the Chilled Water System to Provide Cooling to the Containment Fan Cooling Units
ML05040064228 February 2005RAI, Request for Approval of Final Safety Analysis Report Change Regarding the Carbon Dioxide Suppression SystemSafe Shutdown
Fire Barrier
ML0510803415 May 2005RAI, Amendment to Implement Alternative Source Term
ML05118040510 May 2005RAI, License Transfer Application
ML05132013223 May 2005Request for Additional Information Response to Generic Letter 2004-01
ML05133027721 June 2005RAI, Amendment Request to Revise Technical Specification: Emergency Core Cooling Systems Tavg<350 Degrees (TAC Nos. MC5909 and MC5910)
ML0603801019 February 2006Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water ReactorsMission time
Coatings
Foreign Material Exclusion
Scaffolding
ML06334027326 December 2006Relief Request to Synchronize Inservice Inspection Intervals
ML06334028420 December 2006RAI Inservice Inspection Program Relief RequestDissimilar Metal Weld
ML06345019220 December 2006Request for Additional Information Amendment Request to Implement TSTF-449Pressure Boundary Leakage
ML0701001488 January 2007Draft RAI
ML07032026131 January 2007Draft Request for Additional Information
ML0703301055 February 2007Request for Additional Information, Amendment Request Refueling Operations - Decay Time, Salem Nuclear Generating Station, Unit Nos. 1 & 2
ML0703301782 February 2007Draft Request for Additional Information
ML0703305655 February 2007Request for Additional Information, Amendment Request Steam Generator Tube Integrity, Salem Nuclear Generating Station. Unit No. 2
ML07047008312 February 2007Draft Request for Additional Information (TAC Nos. MD3171 and MD3172)
ML07086019129 March 2007Request for Additional Information, Amendment Request Topical Report References in Technical Specification for Core Operating Limits Report, Salem Nuclear Generating Station, Unit Nos. 1 and 2, (TAC Nos. MD3171 & MD3172)
ML07170076010 July 2007Request for Additional Information Regarding Steam Generator Tube Inspections Conducted During 2006 Refueling Outage, Salem Nuclear Generating Station, Unit No. 2 TAC MD4807)
ML0718604753 July 2007Draft Request for Additional Information