Request for Additional Information (Rai), Request for Change to Technical Specifications on Steam Generator Low-Low Trip Setpoint
ML030520033
Person / Time
Site: Salem  PSEG icon.png
Issue date: 02/20/2003
From: Robert Fretz
NRC/NRR/DLPM/LPD1
To: Keiser H
Public Service Enterprise Group
Fretz, R, NRR/DLPM, 415-1324
References
TAC MB6489, TAC MB6490
Download: ML030520033 (4)


Text

February 20, 2003 Mr. Harold W. Keiser Chief Nuclear Officer & President PSEG Nuclear LLC - X04 Post Office Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION (RAI) RE: REQUEST FOR CHANGE TO TECHNICAL SPECIFICATIONS ON STEAM GENERATOR LOW-LOW TRIP SETPOINT (TAC NOS. MB6489 AND MB6490)

Dear Mr. Keiser:

By letter dated September 26, 2002, PSEG Nuclear LLC submitted a request for a revision to Technical Specification (TS) Table 2.2-1, Reactor Trip System Instrumentation Trip Setpoints, and Table 3.3-4, Engineered Safety Feature Actuation System Instrumentation Trip Setpoints, for the Steam Generator Low-Low Level Trip setpoint and allowable values at the Salem Nuclear Generating Station, Unit Nos. 1 and 2.

The U.S. Nuclear Regulatory Commission staff is reviewing your request and has determined that additional information is necessary in order to complete its evaluation. We discussed the enclosed RAI with your staff during a telephone call on January 27, 2003. During the call, you agreed to respond to the enclosed RAI within 30 days from the date of this letter. If circumstances result in the need to revise the target date, please contact me at (301) 415-1324.

Sincerely,

/RA/

Robert J. Fretz, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311

Enclosure:

RAI cc w/encl: See next page

ML030520033 OFFICE PDI-2/PM PDI-2/LA PDI-2/SC NAME RFretz CRaynor JClifford DATE 02/04/03 2/11/03 2/13/03 REQUEST FOR ADDITIONAL INFORMATION REQUEST FOR CHANGE TO TECHNICAL SPECIFICATION TABLE 2.2-1, REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS, AND TABLE 3.3-4, ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS, FOR THE STEAM GENERATOR LOW-LOW LEVEL TRIP SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 By letter dated September 26, 2002, PSEG Nuclear LLC submitted a request for a revision to Technical Specification (TS) Table 2.2-1, Reactor Trip System Instrumentation Trip Setpoints, and Table 3.3-4, Engineered Safety Feature Actuation System Instrumentation Trip Setpoints, for the Steam Generator Low-Low Level Trip setpoint and allowable values at the Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem). The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing your request and has determined that additional information is necessary in order to complete its evaluation.

Question:

Section 4 of Attachment 1 to the September 26, 2002, letter states that the total calculated channel uncertainties for the low-low level channel are +12.233% and 10.339% for Salem Unit Nos. 1 and 2, respectively.

Describe the setpoint methodology, the calculations for the proposed setpoint, and allowable value for the low-low steam generator trip function. If the setpoint methodology is different from the existing methodology, the NRC will review it. The setpoint calculation for each unit should include the uncertainty values and the bases for all measurement instrument components, rack calibration accuracy, and the bias (pressure drop and equivalent % of narrow range span) assigned to account for the effect of the mid-deck plate pressure differential induced by the primary separator downcomer steam flow.

Enclosure

PSEG Nuclear LLC Salem Nuclear Generating Station, Unit Nos. 1 and 2 cc:

Mr. David F. Garchow Brian Beam Vice President - Operations Board of Public Utilities PSEG Nuclear - X04 2 Gateway Center, Tenth Floor P.O. Box 236 Newark, NJ 07102 Hancocks Bridge, NJ 08038 Regional Administrator, Region I Mr. John T. Carlin U.S. Nuclear Regulatory Commission Vice President - Nuclear Reliability and 475 Allendale Road Technical Support King of Prussia, PA 19406 PSEG Nuclear - N10 P.O. Box 236 Senior Resident Inspector Hancocks Bridge, NJ 08038 Salem Nuclear Generating Station U.S. Nuclear Regulatory Commission Mr. Gabor Salamon Drawer 0509 Manager - Nuclear Safety and Licensing Hancocks Bridge, NJ 08038 PSEG Nuclear - N21 P.O. Box 236 Hancocks Bridge, NJ 08038 Jeffrie J. Keenan, Esquire PSEG Nuclear - N21 P.O. Box 236 Hancocks Bridge, NJ 08038 Ms. R. A. Kankus Joint Owner Affairs PECO Energy Company Nuclear Group Headquarters KSA1-E 200 Exelon Way Kennett Square, PA 19348 Lower Alloways Creek Township c/o Mary O. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs NJ Department of Environmental Protection and Energy CN 415 Trenton, NJ 08625-0415