November 4, 2003 Mr. Roy A. Anderson President & Chief Nuclear Officer PSEG Nuclear, LLC - X04 Post Office Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNIT NO. 2, REQUEST FOR ADDITIONAL INFORMATION (RAI) RE: REQUEST FOR CHANGES TO LICENSE CONDITION 2.C.10 (TAC NO. MB9896)
Dear Mr. Anderson:
By letters dated June 16 and July 1, 2003, PSEG Nuclear, LLC (PSEG) submitted a request for changes to the Salem Nuclear Generating Station (Salem), Unit No. 2, Technical Specifications.
The proposed changes would amend Salem, Unit No. 2, License Condition 2.C.10, to document changes to the Salem Post-Fire Safe Shutdown strategy for Fire Areas 2-FA-AB-64B, 2-FA-AB-84C, and 2-FA-AB-84B.
The U.S. Nuclear Regulatory Commission staff is reviewing your request, and has determined that additional information is necessary in order to complete its evaluation. We discussed the enclosed RAI, via telephone, with your staff on October 29, 2003. During this call, PSEG agreed to respond to the enclosed RAI within 30 days from the date of this letter. If circumstances result in the need to revise the target date, please contact me at (301) 415-1324.
Sincerely,
/RA/
Robert J. Fretz, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-311
Enclosure:
As stated cc w/encl: See next page
November 4, 2003 Mr. Roy A. Anderson President & Chief Nuclear Officer PSEG Nuclear, LLC - X04 Post Office Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNIT NO. 2, REQUEST FOR ADDITIONAL INFORMATION (RAI) RE: REQUEST FOR CHANGES TO LICENSE CONDITION 2.C.10 (TAC NO. MB9896)
Dear Mr. Anderson:
By letters dated June 16 and July 1, 2003, PSEG Nuclear, LLC (PSEG) submitted a request for changes to the Salem Nuclear Generating Station (Salem), Unit No. 2, Technical Specifications.
The proposed changes would amend Salem, Unit No. 2, License Condition 2.C.10, to document changes to the Salem Post-Fire Safe Shutdown strategy for Fire Areas 2-FA-AB-64B, 2-FA-AB-84C, and 2-FA-AB-84B.
The U.S. Nuclear Regulatory Commission staff is reviewing your request, and has determined that additional information is necessary in order to complete its evaluation. We discussed the enclosed RAI, via telephone, with your staff on October 29, 2003. During this call, PSEG agreed to respond to the enclosed RAI within 30 days from the date of this letter. If circumstances result in the need to revise the target date, please contact me at (301) 415-1324.
Sincerely,
/RA/
Robert J. Fretz, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-311
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION PUBLIC JClifford DTrimble GMeyer, RGN-I ACRS RFretz JBongarra CRaynor OGC PDI-2 Reading PQualls ADAMS Accession Number: ML033080283 OFFICE PDI-2/PM PDI-2/LA IROB/SC PDI-2/SC NAME RFretz CRaynor DTrimble JBoska for JClifford DATE 11/3/03 11/3/03 11/3/03 11/4/03 OFFICIAL RECORD COPY
Salem Nuclear Generating Station, Unit Nos. 1 and 2 cc:
Mr. A. Christopher Bakken, III Senior Vice President - Site Operations PSEG Nuclear - X15 P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. John T. Carlin Vice President - Nuclear Assessments PSEG Nuclear - N10 P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David F. Garchow Vice President - Eng/Tech Support PSEG Nuclear - N28 P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. Gabor Salamon Manager - Licensing PSEG Nuclear - N21 P.O. Box 236 Hancocks Bridge, NJ 08038 Jeffrie J. Keenan, Esquire PSEG Nuclear - N21 P.O. Box 236 Hancocks Bridge, NJ 08038 Ms. R. A. Kankus Joint Owner Affairs PECO Energy Company Nuclear Group Headquarters KSA1-E 200 Exelon Way Kennett Square, PA 19348 Lower Alloways Creek Township c/o Mary O. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs NJ Department of Environmental Protection and Energy CN 415 Trenton, NJ 08625-0415 Brian Beam Board of Public Utilities 2 Gateway Center, Tenth Floor Newark, NJ 07102 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Salem Nuclear Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ 08038
Enclosure REQUEST FOR ADDITIONAL INFORMATION RE: REQUEST FOR CHANGES TO LICENSE CONDITION 2.C.10 SALEM NUCLEAR GENERATING STATION, UNIT NO. 2 By letters dated June 16 and July 1, 2003, PSEG Nuclear, LLC (PSEG) submitted a request for changes to the Salem Nuclear Generating Station (Salem), Unit No. 2, Technical Specifications (TSs). The proposed changes would amend Salem, Unit No. 2, License Condition 2.C.10, to document changes to the Salem Post-Fire Safe Shutdown strategy for Fire Areas 2-FA-AB-64B, 2-FA-AB-84C, and 2-FA-AB-84B.
In Attachment 3 to its June 16, 2003, letter, PSEG credits numerous manual actions that are grouped by fire area. Additional information relating to manual actions is also provided in to the June 16, 2003, submittal. The U.S. Nuclear Regulatory Commission staff has determined that additional information is necessary in order to complete its evaluation.
- 1.
In its June 16, 2003, letter, PSEG stated that [m]anual actions relied upon to achieve hot standby and cold shutdown are limited and are practical, reasonable and achievable under the expected environmental conditions. Please describe how PSEG determined that the credited manual actions are practical, reasonable and achievable, and whether or not these actions were verified in the field. Also, briefly describe what environmental conditions were considered in your evaluations.
2.
In Attachment 8 to the June 16, 2003, letter, PSEG provided estimated times for specific operator actions. What does the estimated time column represent? That is, do the estimated time values provided in Attachment 8 indicate the time an operator takes to complete the action, or the time available to take the action? Also, how were these estimates determined?
3.
For those actions taken outside the control room (e.g., in the auxiliary building, switchgear room, etc.), do the time estimates given in Attachment 8 include travel time for the operator to access the specific location (i.e., does the 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> estimated to trip the turbine-driven auxiliary feedwater pump (2MS52) include the time it takes to dispatch the operator to the specified location, plus the time to access the pump control and actually trip the pump)?
4.
In Attachment 8, are the available personnel a part of the minimum shift staff, or are they in addition to the minimum shift staff? Will the required number of personnel identified in the specific scenarios always be available to perform the required manual actions?
5.
What are the consequences, if any, of an operator failing to take the manual actions that are being credited in the analyses for the three fire protection areas (e.g., if the operator fails to de-energize 21 and 22 charging pumps for the reactor coolant system inventory control in the 2FA-AB-84B sequence)? Also, what defense-in-depth measures are available to prevent adverse consequences to the plant or the public?