Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML19256A84112 January 1979Forwards 1978 Annual Rept by Geological Survey for Triga Reactor
ML19282B51520 February 1979in Response to 790209 Request,Provides Addl Info Re Amounts, Types & Enrichment of SNM
ML19320C3528 July 1980Forwards Emergency Plan
ML19325D93917 October 1989Advises That Fuel from Berkeley Facility Never Received Due to Political Disposition,Per Rev to License.Smaller Amount of Fuel Received from Michigan State Facility.Nrc Will Be Informed of Progress of Fuel Plans
ML19331D10213 August 1980Forwards Physical Security Plan,Revision 2.Plan Withheld (Ref 10CFR2.790)
ML19351D4158 September 1980Responds to NRC 800902 Ltr Re Violations Noted in IE Insp Rept 50-274/80-02.Corrective Actions:Two Separate Radiation Readings Will Be Made by Two Different People on Each Waste Container to Be Shipped
ML20006D78425 January 1990Advises That L Filipek Will Replace Author as Reactor Administrator on 900201
ML20049J7292 March 1982Forwards Revision 3 of Physical Security Plan.Revision Withheld (Ref 10CFR2.790)
ML20052B50126 April 1982Informs That Author Is Retiring from Govt Svc.Ht Millard Has Been Selected as New Reactor Administrator
ML20055E2433 July 1990Informs of Resignation from Position,Effective 900707. DB Smith Will Assume Duties Until Permanent Successor Announced
ML20059M51325 September 1990Advises That DB Smith Is Permanent Administrator of Triga Facility,Effective Immediately
ML20066D77219 October 1982Forwards Public Version of Emergency Plan
ML20094Q2358 August 1984Advises of Implementation of Emergency Plan
ML20147D95014 December 1978Effective 790101,Administrator of the Geological Survey Triga Reactor Will Be AP Marranzino
ML20148F52911 October 1978Requests Change to Paragraph 2.B of Lic to Read to Receive Possess & Use Up to 5 Kg U-235 for Use in Connection W/Oper of Reactor
ML20149E73616 December 1987Revised Response to NRC 871203 Telcon Re Violation Noted in Insp Rept 50-274/87-01.Corrective Actions:Procecdures for Handling Low Level Radwaste Revised & Received Preliminary Approval & Training in DOT & NRC Regulations Provided
ML20151E74131 March 1988Informs That Alarms on Area Monitors Not Verified Weekly During Periods Reactor Not in Operations.Agrees to Take Steps to Assure That Alarms Will Be Verified in Future,Per 880331 Telcon
ML20195C38817 October 1988Discusses Progress on Renovation of Gs Triga Mark I Reactor
ML20206E77025 October 1988Request Permission for Resuming Operation of Geological Survey Triga Mark I Reactor.Reassembly Progressing Well & Initial Startup Operation Expected on 881107
ML20210T54922 September 1986Notifies That Responsibility for Operation of Nuclear Reactor Transferred to Geochemistry Branch on 861001,per R Hamilton Decision.Change Will Be Reported in 1986 Annual Rept
ML20212P00322 August 1986Forwards Rev to Section 4.4.1 of Emergency Plan,Reflecting Upgrade of Denver Federal Ctr Fire Alarm Sys
ML20213D4624 November 1986Advises That Changes to Emergency Plan for USGS Triga Reactor,Submitted on 860822,have Been Fully Implemented
ML20214W58822 September 1986Notification of Transfer of Operation of Nuclear Reactor to Geochemistry Branch,Effective on 861001.Reactor Operations Committee Members Can Review Modified Facility Organizational Chart at Feb 1987 Meeting
ML20235A48616 September 1987Withdraws 870507 Application for Temporary Amend to License R-113
ML20235H45225 September 1987Advises That Facility Will Cease Routine Operation on 871002.Operation Will Be Limited to Comply W/License Conditions Until Reactor Can Be Defueled.Reactor Will Remain Shut Down Until New Tank Liner Can Be Installed
ML20236G16621 July 1987Submits Info on Doe/Nrc Forms 741 & 742 in Reply to .Info Submitted Not in Confidence & Presumed Available to Public as Info Not Customarily Treated as Confidential. Info Interpreted as Unclassified Per 10CFR73.21
ML20236G69531 July 1987Submits Info Re Application for Temporary Amend to License R-113 & Repairs to Tank Liner.Aluminum Tank Liner Will Be Installed Inside Existing Tank.Contract Awarded for Engineering Design of New Tank Liner Per 10CFR50.59
ML20237L70421 August 1987Informs of Insp of Reactor Tank on 870812.Leaks Detected from Two Existing Patches.Patches Replaced.Two Penetrations Discovered on West Wall of Tank on 870707.Penetrations Patched.New Tank Liner Installation Proceeding on Schedule
ML20246C95727 April 1989Forwards Rev 2 to Emergency Plan for Us Geological Survey Triga Reactor Facility
ML20246F56627 April 1989Forwards Proposed Rev to Reactor Operator Requalification Program for Triga Reactor Facility.Changes Consist of Addition of Annual Operating Exams,To Permit Pulse or Square Wave Operations
ML20246F57610 July 1989Forwards Proposed Rev V to Security Plan for Triga Reactor Facility.Rev Withheld
ML20246G88327 April 1989Forwards Rev 4 to Security Plan.Rev Withheld.Changes Discussed,Including Ref to Specific Bldgs on Denver Federal Ctr
ML20247L47614 September 1989Forwards Proposed Reactor Operator Requalification Program. Changes Address NRC 890905 Request for Addl Info Re Preparation & Grading of Annual Written ExamPower change
ML20247Q53322 May 1989Forwards Response to Violations Noted in Insp 50-274/89-01 on 890403-05.Response Withheld (Ref 10CFR2.790(d))