Request Permission for Resuming Operation of Geological Survey Triga Mark I Reactor.Reassembly Progressing Well & Initial Startup Operation Expected on 881107
ML20206E770
Person / Time
Site: U.S. Geological Survey
Issue date: 10/25/1988
From: Millard H
INTERIOR, DEPT. OF, GEOLOGICAL SURVEY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20206E768 List:
References
NUDOCS 8811180189
Download: ML20206E770 (1)


Text

'

o

['

United States Department of thflggggggy GEOL (XilCAL SURVEY

=

j

, ji i

aOx 23 Gin us 424 OCT 2 81988 DENVER FEDERAL CENTER j

DENVER, COLORADO 80225 0G16 i

n sini meien ni October 25. 1988 Docket No. 50-274 License No. R-113 Robert D. Martin Regional Adrainistrator U.S. Nuclear Regulatory Conunission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Dear Sir

Subject:

Restart of the Geological Survey TRIGA Mark I reactor (GSTR).

Reassembly of the GSTR is progressing well and we exilct to be ready for the initial startup operation on November 7, 1988.

This letter is to formally request permission for resuming operation of the GSTR.

If yoit desire to inspect the facility, we ask that you be prepared to do so by November 7.

This would result in minimal delay in our operations.

It also seems likely at this time that the installation of the cew control console will be d/ layed beyond November, 1988.

Sincerely,

.f1k%l

/*

YifPilIINCd'/

Hugh T. Millard, Jr.

Reactor Administrator copy to:

Mr. Blaine Murray, Region IV, U.S.H.R.C.

Mr. Russell Wise, Regior IV, U.S.N.R.C.

Mr. Alexander Adams, NRR, U.S.H.R.C.

33111801G9 881110 PDR ADOCK O'50002?4 p

PDL.

h

-m n