Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IA-46-485, Advises That Changes in Rev 23 to Radiological Emergency Plan for St Lucie,Consistent W/Provisions of 10CFR50.54(q), 10CFR50.47(b),10CFR50 & App E to 10CFR50 | 2 August 1993 | Advises That Changes in Rev 23 to Radiological Emergency Plan for St Lucie,Consistent W/Provisions of 10CFR50.54(q), 10CFR50.47(b),10CFR50 & App E to 10CFR50 | Internal Flooding |
IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission | 18 April 1997 | Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission | Safe Shutdown Fitness for Duty Packing leak High Radiation Area Ultimate heat sink Fire Barrier Contraband Emergency Lighting Battery sizing Deep Dose Equivalent Fire Protection Program Fire Watch Scaffolding |
IA-97-461, Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted | 25 November 1997 | Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted | Boric Acid Fitness for Duty Foreign Material Exclusion Fire Watch Scaffolding Stolen Backfit |
IA-99-106, Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump | 15 August 1997 | Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump | |
IR 05000335/1994009 | 19 March 1994 | Discusses Two Unresolved Items Pending TSs Interpretations Re Insp Repts 50-335/94-09 & 50-389/94-09 | |
IR 05000335/1995014 | 7 July 1995 | Informs That Insp Repts 50-335/95-14 & 50-389/95-14 Have Been Issued to Prevatte for Insp Scheduled to End 950805 | |
IR 05000335/1995015 | 28 October 1996 | Forwards Draft Insp Repts 50-335/95-15 & 50-389/95-15 on 960907-1012 | Grab sample Operability Assessment |
IR 05000335/1996011 | 14 September 1996 | Forwards Allegation Evaluation Rept RII-96-A-0129,which Summarized Findings of Review & Independent Insp Re Maint Manager Unprofessionalism & Violation of Freeze Seal Procedure.W/O Insp Repts 50-335/96-11 & 50-389/96-11 | Power Uprate |
IR 05000335/1997005 | 17 July 1997 | Forwards Allegation Evaluation Rept & NRC Insp Repts 50-335/97-05 & 50-389/97-05 Re RII-97-A-0116 | Foreign Material Exclusion |
IR 05000454/1983038 | 27 January 1984 | Identifies Addl Insp Repts 50-454/83-38 & 50-455/83-28 Re Reinsp Program,Per 840120 Memo | |
IR 05000455/1985027 | 10 June 1986 | Reviews Const Appraisal Team Insp 50-455/85-27.Analyses of Violations & Corrective Actions Encl.Regional Based Insps to Resolve Issues Should Be Scheduled | |
ML20054H139 | 17 June 1982 | Releases Public Version of Generating Stations Emergency Plan Telephone Directory | |
ML20054H412 | 18 June 1982 | Releases Public Version of Generating Stations Emergency Plan Telephone Directory | |
ML20054J815 | 11 June 1982 | Releases Public Version of Revised Facility Annex to Generating Station Emergency Plan | |
ML20054M330 | 6 July 1982 | Releases Public Version of Revised Emergency Plan Implementing Procedure | |
ML20055C051 | 9 August 1982 | Forwards B Von Zellen .Nrc Already Replied | Overexposure Affidavit |
ML20057C980 | 27 September 1993 | Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months | |
ML20058J165 | 6 August 1982 | Informs That Time for Commission to Review ALAB-678 Expired. Commission Declined Review.Decision Became Final Agency Action on 820805 | |
ML20059A465 | 20 October 1993 | Notification of Significant Licensee Meeting W/Util in Glen Ellyn,Il on 931104 to Review Status of Util Initiatives on QA & Corporate Engineering Support | |
ML20062B441 | 22 July 1982 | Notification of 820727 Meeting W/Westinghouse in Bethesda, MD to Discuss Krsko Water Hammer Event of Jul 1981 & Applicability to Domestic Westinghouse Type D Steam Generators | |
ML20062C146 | 20 October 1978 | Notification of 781026 Meeting W/Util in Bethesda,Md Re Program for Chemically Cleaning Secondary Side of Steam Generators | |
ML20062E834 | 6 December 1978 | Notice of 781213 Meeting to Discuss Staff Policies on Review of Pending OL Appls & Criteria for Establishing Priorities for Review | |
ML20062J450 | 27 October 1993 | Requests Addl Info Re Proposed EAL Changes in Util Generating Station Emergency Plan Annexes.Proposed EALs Reviewed Against Guidance in NUMARC/NESP-007,rev 2, Methodology for Development of Eals | |
ML20125B935 | 12 December 1979 | Recommends Notifying Aslab of Westinghouse Turbine Disk Cracking,Based on Info in 791105 Anonymous ltr,791120 Telcon W/Westinghouse & PNO-III-79-43 Re Low Pressure Disk Cracks at Zion Unit 1 | Turbine Missile |
ML20125C647 | 26 June 1979 | Provides Info Re Task A-44.Only Industry Study Available Re Station Blackout Is util-authored.NRC Reactor Safety Study Methodology Applications Program Is Related to Task.No Consultants Have Been Used on Task | |
ML20125D050 | 5 December 1992 | Informs That Licensee Response to GL 90-06, Resolution of Generic Issue 70, 'Power-Operated Relief Valve & Block Valve Reliability' & GI 94, 'Addl Low-Temp Overpressure Protection for Lwrs,' Per 10CFR50.54(F), Acceptable | Backfit |
ML20126L227 | 1 May 1981 | Forwards Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Vessels | |
ML20127A368 | 18 August 1982 | Forwards List of Plants for Which Leak Test Repts Were Selected for Review by Ornl.Leak Testing Criteria Will Be Prepared from Review.W/O Encl | |
ML20127B236 | 16 February 1984 | Responds to 830315 Memo Requesting NRC Position on Capacity of Container Required by Section III.0 of App R to Hold Entire Lube Sys Inventory.One or More Tanks Necessary to Collect Total Lube Oil Inventory from Pumps | Earthquake |
ML20127B890 | 31 January 1972 | Submits Status & Impending Action on Application Requiring Show Cause Action | |
ML20127F306 | 18 June 1985 | Forwards Tabular Summary of Key Results from Regional Survey of plant-specific Info Re Potential for Uncontrolled Radiation Exposures in PWR Cavities,Per Jg Partlow 850315 Request.No Further Generic Action Needed | High Radiation Area |
ML20128G575 | 3 October 1996 | Forwards Ltr to Be Sent to Licensees of Six Pressurized Water Reactor Plants That Have Used Fuel Mfg by Siemens Power Corp Since 1986.Licensees Requested to Verify Compliance of 10CFR50.46 W/Regulations | Backfit |
ML20129F299 | 11 July 1985 | Advises That Operating Reactors Identified on Attached List Need TAC Numbers for Multi-Plant Action F-68, Meteorological Data Upgrade. Encl TAC Sheet,W/Tac Numbers for Plants,Requested by 850730 | |
ML20132C068 | 1 May 1981 | Forwards Project Manager Inputs Required for SALP for Listed Plants.W/O Encl | |
ML20133C657 | 30 July 1985 | Provides Results of Initial Review of Survey of Licensee Responses to Steam Binding in Auxiliary Feedwater Sys.Issue Addressed in IE Info Notices & INPO Significant Event Repts & Significant Operating Experience Repts | |
ML20133F892 | 2 October 1985 | Notification of 851011 Meeting W/Exxon Nuclear Co,Inc in Bethesda,Md to Discuss Recent Exxon Activities Toward Resolving Safety Analysis Issues | |
ML20133G613 | 6 August 1985 | Notification of 850815 Meeting W/Bnl,Westinghouse & Util in Bethesda,Md to Review Limiting Conditions for Operations Relaxation Program | |
ML20133J482 | 15 January 1997 | Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule | |
ML20133J581 | 15 January 1997 | Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 | |
ML20134B253 | 11 February 1993 | Responds to 930113 Request for Exceptions to N+1 Policy for Listed Plants.Approved Exceptions W/Stated Conditions Effective for Period of 2 Yrs | |
ML20134B469 | 1 November 1993 | Forwards SALP Input for Plant,Per J Norris | |
ML20134B506 | 13 April 1994 | Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted | |
ML20134B509 | 8 June 1994 | Informs That During Week of 940214,review Conducted of Admin of Operator Licensing Program Adherence Per NUREG-1021, Operator Licensing Examiner Stds & That,Overall,Program Being Conducted in Accordance W/Examiner Stds | License Renewal |
ML20134B520 | 27 September 1994 | Expresses Appreciation for Forwarding Elrod 940831 Memo Re Shift Scheduling Practice at Plant | |
ML20134B566 | 6 April 1995 | Responds to 950201 Memo Re Request for Exemptions to N+1 Policy | |
ML20134B792 | 24 June 1996 | Discusses Results of Audit Review of Changes to Siemens Large Break ECCS Evaluation Model | |
ML20134B796 | 12 July 1996 | Refers to Memo Re Request in Returning Resident Inspector Staffing at St Lucie to N+1.Exemption to N+1 Staffing Approved in 951002 Memo | |
ML20134C218 | 12 October 1994 | Summarizes 941011 Meeting W/Util to Discuss Items of Mutual Interest Re Operations at Util Nuclear Stations for Plants | |
ML20134C761 | 1 October 1996 | Forwards Recently Completed Interim Staff Guidance on Use of PRA in 10CFR50.59 Process | Probabilistic Risk Assessment |
ML20134E919 | 29 October 1996 | Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps |