Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission18 April 1997Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & CommissionSafe Shutdown
Fitness for Duty
Packing leak
High Radiation Area
Ultimate heat sink
Fire Barrier
Contraband
Emergency Lighting
Battery sizing
Deep Dose Equivalent
Fire Protection Program
Fire Watch
Scaffolding
IA-99-134, Submits Addendum to SE for Proposed Merger of Calenergy, Midamerican & Indirect Transfer of Licenses for Plant Units 1 & 2.SE & Indirect Transfer of Licenses Should Be Approved25 November 1998Submits Addendum to SE for Proposed Merger of Calenergy, Midamerican & Indirect Transfer of Licenses for Plant Units 1 & 2.SE & Indirect Transfer of Licenses Should Be Approved
IR 05000254/198502025 October 1985Forwards Insp Repts 50-254/85-20 & 50-265/85-22 on 850610-14.Potential Enforcement Finding Re Inadequate 10CFR21 Review & One Open Item Noted.Notification Requested If Notice of Violation Not Issued within 1 Month.W/O Encl
IR 05000254/198701126 June 1987Forwards Rn Moist Findings & Comments from Equipment Qualification Insp Repts 50-254/87-11 & 50-265/87-11 on 870608-12.All Items Examined During Plant Walkdown Appeared to Be Generally Well Maintained & in Good Condition
ML20054H13917 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054H41218 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054H48218 June 1982Releases Public Version of Revised Emergency Plan Implementing Procedures
ML20054J85623 June 1982Releases Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures
ML20054M3306 July 1982Releases Public Version of Revised Emergency Plan Implementing Procedure
ML20055B20813 July 1982Releases Public Version of Revised Emergency Plan Implementing Procedures
ML20056A3781 August 1990Forwards Util 900604 & 0711 Ltrs Ref to in Proposed Settlement Agreement Forwarded to Board on 900730 Re Proceeding.W/O Encls
ML20056E4575 August 1993Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant
ML20057C98027 September 1993Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months
ML20058N48115 December 1993Informs of Decision to Expand Senior Mgt Oversight of Selected Plants,Per Recent Meeting W/J Martin & H Miller. Lists Assignment of Managers,Effective Immediately
ML20059A46520 October 1993Notification of Significant Licensee Meeting W/Util in Glen Ellyn,Il on 931104 to Review Status of Util Initiatives on QA & Corporate Engineering Support
ML20059A93413 August 1990Forwards Settlement Agreement Approved by Board in 900801 Memorandum & Order (Approving Settlement Agreement & Terminating Proceedings).Certificate of Svc Encl
ML20062B39523 July 1982Releases Public Version of Revised Emergency Plan Implementing Procedures
ML20062B82028 July 1982Advises That ESF Reset Controls Comply W/Nrc Criteria,Subj to IE Confirmation
ML20062F0625 August 1982Releases Public Version of Revision to Emergency Plan Implementing Procedure
ML20062J45027 October 1993Requests Addl Info Re Proposed EAL Changes in Util Generating Station Emergency Plan Annexes.Proposed EALs Reviewed Against Guidance in NUMARC/NESP-007,rev 2, Methodology for Development of Eals
ML20125A5152 September 1975Requests Assistance in Review of Licensees Submittals on Pressure Suppression Containment Concept & Provide Written Evaluation of Adequacy of Justification for Continued Operation of Plants W/Mark I Containments
ML20125A53026 September 1975Discusses Review of GE Technical Justification of Hydrodynamic Loads for Mark I Containments.No Sufficient Info to Indicate That Functional Operability of Piping Required for Emergency Core Cooling Will Not Be Impaired
ML20125B91424 August 1973Forwards Orders & Notices of Availability W/O TS Changes Re Fuel Densification for Listed Plants.W/O Encls
ML20125C5212 March 1978Notification of 790309 Meeting W/Mark I Owners Group in Bethesda,Md to Discuss Changes in Mark I Long Term Plan as Reflected in Rev 3 to Mark I Owners Group Program Action Plan
ML20127E7808 May 1985Notification of 850510 Meeting W/Util in Bethesda,Md to Discuss Pipe Crack Insp & Repair at Facility
ML20127H2591 July 1975Discusses Implementation of BWR Torus Temp TS Changes Re Listed Plants
ML20128D7679 August 1974Discusses Requirements for Rod Drop Accident in Operating Plants,In Response to 740611 Memo.Recommends That Rod Sequence Control Sys Be Installed in Listed Plants
ML20128D86522 October 1975Requests Assistance in Reviewing Mark I Short Term Program Final Rept & Provide Written Evaluation of Adequacy of Justification for Continued Operation of Plants W/Mark I Containments.(Technical Assistance Request ORB-3-105)
ML20128E03819 December 1975Discusses Review of Question Round One -Mark I Short Term Program Final Rept & Proposed Long Term Program (TAR-1989/ ORB-3-105 Rev One) & Requests Addl Info Be Provided.List of Addl Info EnclEarthquake
ML20128H25821 May 1985Responds to 830422 Request for Clarification Re Inservice Insp & Testing Program to Be Followed by Licensee.Licensee Proposed Program Should Be Followed Subj to Conditions Until Review Complete & Final Approval Given
ML20128L16115 July 1985Notification of 850723 Meeting W/Util in Bethesda,Md to Discuss Pipe Replacement Program
ML20129K4507 November 1996Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Loop seal
High Radiation Area
Half scram
Hydrostatic
Temporary Modification
Squib
Scram Discharge Volume
Fuel cladding
Pressure Boundary Leakage
Minimum staff
Offsite Circuit
Power change
Unidentified leakage
Siren
ML20137G59113 March 1997Forwards Safety Evaluation Re Proposed TS Changes to Reflect Transition of Fuel Supplier from GE to Siemens Power Corp at Plants Unit 1 & 2
ML20138J7675 February 1997Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register PersonnelGeneric Fundamentals Examination
ML20140G54920 July 1977Advises That More Frequent Testing of BWR Relief & safety- Relief Valves Warranted Due to Continuing Failures. Description of long-range Program,Including Sample Ltr W/Tech Specs,ProvidedFuel cladding
ML20141F48319 May 1997Notifies of 970522 Meeting W/Util in Rockville,Md to Discuss NRC Recommendations Re Action Which Should Be Considered by Commonwealth Edison for Plant,Units 1 & 2
ML20141L85926 June 1972Forwards s to Utils Requesting Info on Experience W/Rod Worth Minimizers
ML20141N30123 June 1972Forwards Util 720607 Rept Re Hanger Failures on Torus Suction Header.Ro Bulletin 72-4 Sent to Operating Bwrs.Addl Info Will Be Forwarded When AvailableLiquid penetrant
ML20147J2399 April 1997Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations
ML20148D47428 May 1997Notification of Meeting W/Ce on 970602 in Rockville,Md to Discuss Concerns Addressed in Re Actions That Should Be Considered by CE for Plant,Units 1 & 2,in Response to IPEEE Fire Analysis Results
ML20151L7804 August 1997Notification of 970820 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Comed Response for Quad Cities IPEEE Conceptual Engineering Designs for long-term Resolution for Safe Shutdown EnhancementsSafe Shutdown
ML20153F10625 April 1988Notification of 880510 Counterpart Meeting W/Comm Ed in Rockville,Md to Discuss Status of BWR Licensing Issues
ML20154A28313 December 1986Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985Liquid penetrant
ML20155F19410 April 1986Summarizes Operating Reactor Events Meeting 86-11 on 860407 Re Events Since 860331.List of Attendees,Discussion of Events,Status of Assignments & Assigned Completion Dates for Items Encl.Response Requested for Incomplete Assignments
ML20155H5305 November 1998Notification of 981119 Meeting with Ceco in Rockville,Md to Discuss Progress & Actions Util Taking to Resolve Fire Protection (App R) Issues Since Last Public Meeting on 980910
ML20196H84928 June 1999Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999
ML20196J8624 December 1998Discusses Three Plants,Evaluated for Consideration as Abnormal Occurrences & Other Event of Interest.Oconee & Quad Cities Plants Are Being Considered as AOs & Big Rock Point Being Considered as Other Event InterestSafe Shutdown
ML20196K55410 June 1999Forwards Request for Addl Info Re 10CFR50.46(A) Annual Rept. Note to File for TACs MA5336 & MA5337 Supercedes & Closes TACs MA1597,MA1598 & MA4426
ML20197B91423 July 1997Forwards Safety Evaluation Re Concrete Expansion Anchor Safety Factors for High Energy Line Break Restraints,In Response to Region III 960920 Request