Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000041/200930121 December 2009Operator Licensing Written Examination Approval 05000413-09-301 and 050041-09-301
IR 05000413/20004149 May 2014Catawba - Operator Licensing Written Examination Approval 05000413, 05000414/2014301
IR 05000413/200330115 May 2003April 2003 Exam 50-413/2003-301 & 50-414/2003-301 Administrative Documents
IR 05000413/20043013 December 2004NRC Examination Report 05000413-04-301 and 05000414-04-301Job Performance Measure
IR 05000413/200530226 April 2005Reactor Operator Initial Retake Examination - Catawba Nuclear Station 05000413/2005302 and 05000414/2005302
IR 05000413/200600929 June 2006IR 05000413-06-009, and IR 05000414-06-009, on 05/23/2006 - 05/31/2006, Duke Energy Corporation, NRC Augmented Inspection Team (AIT) ReportOperability Assessment
IR 05000413/200930125 January 2010Er 05000413/2009301, 05000414/2009301; December 7 -14, 2009 & December 22, 2009; Catawba Nuclear Station; Operator License ExaminationsOperability Determination
IR 05000413/201630113 July 2016NRC Operator License Examination Report 05000413/2016301 and 05000414/2016301, May 16 19, 2016 and May 26, 2016Job Performance Measure
IR 05000413/201730115 August 2017NRC Operator License Examination Report 05000413/2017301 and 05000414/2017301Stroke time
Anticipated operational occurrence
Job Performance Measure
Surveillance Frequency Control Program
Operational leakage
IR 05000413/20193013 September 2019Operator Licensing Written Examination Approval 05000413/2019301 and 05000414/2019301
IR 05000413/202330117 February 2023Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301
IR 05000414/200430113 October 2004October 2004 Exam 50-413 & 50-414/2004-301 Draft Outlines & JPMs
ML0234004685 December 2002Reactor & Senior Reactor Operator Initial Examinations, Catawba Nuclear Station - 50-413/2003-301& 50-414/2003-301 on March 31 & April 14, 2003
ML0234505594 December 2002February 5, 2003 Generic Fundamentals Examination Section, Administration of Written Operator Licensing ExamGeneric Fundamentals Examination
ML03031008330 January 2003Reactor and Senior Reactor Operator Initial Examinations Catawba Nuclear Station - 50-413/03-301 and 50-414/03-301
ML03125063715 May 2003March/April 50-413/2003-301 Exam-Final SRO Written ExamBoric Acid
Temporary Modification
Downpower
ML03125064115 May 2003March/April 50-4132003-301 Exam-Final RO Written ExamSafe Shutdown
Shutdown Margin
Grab sample
Downpower
Overspeed trip
Loss of condenser vacuum
ML03272061122 September 2003Exam Process
ML03272062124 September 2003Examiner - Vendor Matrix with Phone Number
ML0328013086 October 2003NRC Region II Initial Examination Workshop Summary
ML03346017616 April 2003April 2003 Exam 50-413/2003-301 & 50-414/2003-301 Post-Exam Comments
ML03346018915 May 2003April 2003 Exam 50-413/2003-301 & 50-414/2003-301 Final SRO Written with ChangesBoric Acid
Temporary Modification
ML03346026915 May 2003April 2003 Exam 50-413/2003 & 50-414/2003-301 Final RO Written with ChangesShutdown Margin
Grab sample
Downpower
Overspeed trip
Loss of condenser vacuum
ML03346031415 May 2003March/April 2003 Exam 50-413/2003-301 Final Simulator Scenarios
ML03349030815 May 2003April 2003 Exam 50-413/2003-301 & 50-414/2003-301 Final JPMs (1st Half)Shutdown Margin
Grab sample
Fire impairment
Temporary Modification
Job Performance Measure
Earthquake
Pressure Boundary Leakage
Unidentified leakage
Operational leakage
ML03349031215 May 2003April 2003 Exam 50-413/2003-301 & 50-414/2003-301 Final JPMs (2nd Half)Boric Acid
Shutdown Margin
Fire impairment
Emergency Lighting
Job Performance Measure
Unidentified leakage
ML03351056215 May 2003April 2003 Exam 50-413/2003-301 & 50-414/2003-301 Final Outlines
ML03351056715 May 2003April 2003 Exam 50-413/2003-301 & 50-414/2003-301 Draft Simulator ScenariosBoric Acid
Shutdown Margin
Post Accident Monitoring
Power change
Downpower
Overspeed trip
Operational leakage
Loss of condenser vacuum
ML03351057415 May 2003April 2003 Exam 50-413/2003-301 & 50-414/2003-301 Draft Combined Written Exam (Part 1 of 3)Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
High Radiation Area
Slow transfer
Probabilistic Risk Assessment
Fire impairment
Temporary Modification
Deep Dose Equivalent
Continuous fire watch
Fire Protection Program
Fire Watch
Grace period
Overspeed trip
Operational leakage
Loss of condenser vacuum
ML03351057815 May 2003April 2003 Exam 50-413/2003-301 & 50-414/2003-301 Draft Combined Written Exam (Part 2 of 3)Safe Shutdown
Unanalyzed Condition
Loop seal
Ultimate heat sink
Grab sample
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Fire Protection Program
Grace period
Stolen
Downpower
Fatality
Overspeed trip
ML03351058215 May 2003April 2003 Exam 50-413/2003-301 & 50-414/2003-301 Draft Combined Written Exam (Part 3 of 3)Boric Acid
Shutdown Margin
Loop seal
Grab sample
Stroke time
Temporary Modification
Time Critical Operator Action
Power Operated Valves
Pressure Boundary Leakage
Power change
Unidentified leakage
Siren
Manual Operator Action
Operational leakage
ML03351062815 May 2003April 2003 Exam 50-413/2003-301 & 50-414/2003-301 Draft Outlines
ML04020067415 May 2003April 2003-301 Exam Draft JPMsBoric Acid
Shutdown Margin
Grab sample
Emergency Lighting
Job Performance Measure
Overspeed trip
ML0416000857 June 2004Reactor and Senior Reactor Operator Initial Examinations Catawba Nuclear Station - 05000413/2004-301 and 05000414/2004-301
ML04328055413 October 2004October 2004 Exam 50-413&50-414/2004-301 Post Exam Comments
ML04328057513 October 2004October 2004 Exam 50-413 & 50-414/2004-301 Final SRO Written Exam
ML04328058313 October 2004October 2004 Exam 50-413 & 50-414/2004-301 Final RO Written Exam
ML0434101183 December 2004NRC Examination Report 05000413-04-301 and 05000414-04-301Job Performance Measure
ML05024027424 January 2005Reactor and Senior Reactor Operator Initial Retake Examinations - Catawba Nuclear Station 05000413/2005-301 and 05000414/2005-301
ML05075045713 October 2004Oct. 2004-301 Exam 50-413 & 50-414/2004-301 Final Revision 1 RO Written Exam
ML05075046313 October 2004Oct. 2004-301 Exam 50-413 & 50-414/2004-301 Final Revision 1 SRO Written Exam
ML05075046813 October 2004October 2004 Exam 50-413 & 50-414/2004-301 Administrative Documents
ML05075047513 October 2004October 2004 Exam 50-413 & 50-414/2004-301 Final Outlines
ML05075048113 October 2004October 2004 Exam 50-413 & 50-414/2004-301 Final Ro/Sro Written Exam References
ML05075048713 October 2004October 2004 Exam 50-413 & 50-414/2004-301 Final Combined Ro/Sro Written Exam with Kas, Answers, References, & Analysis
ML05075049213 October 2004October 2004 Exam 50-413 & 50-414/2004-301 Final Simulator Scenarios
ML05075049713 October 2004October 2004 Exam 50-413 & 50-414/2004-301 Final JPMs
ML05075050213 October 2004October 2004 Exam 50-413 & 50-414/2004-301 Draft Written Outline & Checklist
ML05075052113 October 2004October 2004 Exam 50-413 & 50-414/2004-301 Draft Written RO Exam
ML05075053013 October 2004October 2004 Exam 50-413 & 50-414/2004-301 Draft Written SRO Exam