ML033460176
| ML033460176 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/16/2003 |
| From: | Gordon Peterson Duke Energy Corp |
| To: | NRC/RGN-II |
| References | |
| 50-413/03-301, 50-414/03-301 50-413/03-301, 50-414/03-301 | |
| Download: ML033460176 (3) | |
Text
Post-exam in a tion Comments March 31 - April 4 &
1.
Licensee Submitted PBt-examnation-C
e c
GARY R. PETERSON tl u
Vice President Catawba Nuclear Station Duke Power CNOl VP I 4800 Concord Rd.
York, SC 29745 803831 4251 803 831 3221 fax grpeters@duke-energy. corn A Duke Energy Company April 16,2003 U.S. Nuclear Regulatory Commission, Region I1 Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, GA 30303-893 1
Subject:
Duke Energy Corporation Catawba Nuclear Station, Unit 1 and 2 Docket No.: 50-413 and 50-414 Post Reactor and Senior Reactor Operator Written Examination Comments Catawba Nuclear Station has reviewed the results of the written reactor operator and senior reactor operator initial license examination administered as approved by the Nuclear Regulatory Commission at Catawba Nuclear Station on April 10, 2003 and has no post examination comments.
G. R. Peterson
/ken www. duke-energy.com
' t' U.S. Nuclear RegulPL-ry Commission Page 2 1,. Y.
April 16,2003 i*/
xc:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-001 Edwin Lea, Lead Examiner U. S. Nuclear Regulatory Commission, Region I1 Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, GA 30303-893 1 T. R. Quay, Chief Equipment and Human Performance Branch Division of Inspection Program Management U. S. Nuclear Regulatory Commission, NRR Mail Stop 0-6F2 Washington, D. C. 20555-0001 M. E. Ernstes, Chief Operating Licensing and Human Performance Branch U. S. Nuclear Regulatory Commission, Region I1 Sam Nunn Atlanta Federal Center 61 Forsythe Street, S.W., Suite 23T85 Atlanta, GA 30303-893 1 E. F. Guthrie, Senior Resident Catawba - CNO 1NC