Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML02141033414 May 2002Proposed Technical Specification Change Containment Spray and Recirculation Spray Nozzles Surveillance FrequencyMissed surveillance
Foreign Material Exclusion
ML0226004995 September 2002Proposed Technical Specification Change, Provisions for Buried Fuel Oil Storage Tank Inspection Related RepairTornado Missile
Large early release frequency
Maintenance Rule Program
ML0231802405 November 2002Proposed Technical Specification Change Deletion of Fifteen Minute Degassed Beta & Gamma Activity Test & Semiannual Dose Equivalent I-131 AnalysisBoric Acid
Anticipated operational occurrence
Power change
ML0231802425 November 2002Proposed Technical Specification Change, Deletion of Monthly Analog Rod Position TestShutdown Margin
ML03058042414 February 2003Proposed TS Change Deletion of Monthly Analog Rod Position Test Request for Additional Information
ML04146017813 May 2004Virginia Electric and Power Company, Surry Power Station Units 1 and 2, Proposed Technical Specification Change Auxiliary Feedwater Required Action Statement RevisionsPower change
ML04244016930 August 2004Proposed Technical Changes to Extend Inspection Interval for Reactor Coolant Pump Flywheels Using Consolidated Line Item Improvement ProcessIncorporated by reference
ML04260029015 September 2004Proposed Technical Specifications Change Administrative Controls Changes
ML0426503638 September 2004Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Post Accident Monitoring
Incorporated by reference
ML04295014020 October 2004Proposed Emergency Technical Specification Change One Time Extension of the Completion Time for the Low Head Safety Injection (Lhsi) Train BHigh winds
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
Fuel cladding
Scaffolding
ML04296034722 October 2004Withdrawal of Proposed Emergency Technical Specification Change for One Time Extension of Completion for Time Low Head Safety Injection (Lhsi) Train B
ML0430905764 November 2004Transmittal of Surry Power Station Units 1 and 2 Proposed Technical Specifications Change Request Relocation of Inservice Inspection and Testing RequirementsNondestructive Examination
VT-2
Missed surveillance
Process Control Program
Liquid penetrant
ML04336034230 November 2004Proposed Emergency Technical Specification Change One Time Extension of the Allowed Outage Time for Two Inoperable Auxiliary Feed Water Pumps on the Opposite UnitHigh winds
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Reserve Station Service Transformer
Large early release frequency
Maintenance Rule Program
Fuel cladding
ML04356049821 December 2004Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupation Radiation Exposure ReportsShutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Incorporated by reference
Annual Radiological Environmental Operating Report
ML04356049921 December 2004Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupation Radiation Exposure ReportsShutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML05081009917 March 2005License Amendment Request Proposed Increase in the Lead Rod Average Burnup LimitShutdown Margin
Fuel cladding
ML05207033021 July 2005Proposed Technical Specification Change Revision of Accident Monitoring Instrumentation Listing, Allowed Outage Times, Requirements, and SurveillancesPost Accident Monitoring
ML05256054913 September 2005Proposed Technical Specifications Change Redefinition of Exclusion Area Boundary
ML05257012513 September 2005Proposed Technical Specifications Change Re Redefinition of Exclusion Area Boundary
ML06004027223 August 1999Technical Specifications Basis Change - Delete Tables for Reactor Vessel Toughness Data
ML06037009831 January 2006Proposed Technical Specification Change and Supporting Safety Analyses Revisions to Address Generic Safety Issue 191Time Critical Operator Action
ML06111005620 April 2006Proposed Technical Specifications Change Request for Reinstatement of Previous Reactor Coolant System Pressure/ Temperature Limits, Ltops Setpoint, and Ltops Enable Temperature BasisHydrostatic
Exemption Request
ML06130010025 April 2006Application for Reissuance of Vpdes Permit No, VA0004049Grab sample
ML06150004431 May 2006Issuance of License Amendments 247 and 246 on Revision of Accident Monitoring Instrumentation Listing, Allowed Outage Times, Requirements, and SurveillancesProbabilistic Risk Assessment
ML06151009626 May 2006Proposed License Amendment Request, Consolidated Line Item Improvement Process Technical Specification Improvement Regarding Steam Generator Tube IntegrityNon-Destructive Examination
Offsite Dose Calculation Manual
Nondestructive Examination
Incorporated by reference
Process Control Program
Earthquake
Pressure Boundary Leakage
ML0618607305 July 2006Proposed Technical Specifications Change Revision of Main Control Room and Emergency Switchgear Room Air Conditioning System RequirementsSafe Shutdown
ML0627702083 October 2006Proposed License Amendment Request Containment Sump Inspection Surveillance
ML07032017831 January 2007Proposed Technical Specifications Change Missed Surveillance RequirementsTime of Discovery
Incorporated by reference
Missed surveillance
ML07065052426 February 2007Proposed Technical Specifications Change Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water PipingSafe Shutdown
Mission time
Internal Flooding
Probabilistic Risk Assessment
Reserve Station Service Transformer
Significance Determination Process
Large early release frequency
Maintenance Rule Program
ML0707206206 March 2007License Amendment Request Re Proposed Increase in the Lead Rod Average Burnup LimitShutdown Margin
Fuel cladding
ML0709600375 April 2007Proposed Technical Specifications Change Re Temporary 45-Day and 14-Day Allowed Outage Times to Replace Main Control Room and Emergency Switchgear Room Air Conditioning System Chilled Water PipingSafe Shutdown
High winds
Design basis earthquake
ML07184016925 June 2007Proposed Licence Amendment Request; Increased Maximum Service Water Temperature LimitSafe Shutdown
Ultimate heat sink
Anticipated operational occurrence
ML07197030113 July 2007Proposed License Amendment Request Consolidated Line Item Improvement Process Technical Specification Improvement Control Room HabitabilitySafe Shutdown
Shutdown Margin
Offsite Dose Calculation Manual
Incorporated by reference
Process Control Program
Recently irradiated fuel
ML07219048231 July 2007Proposed Technical Specifications Change Addition of Astrum Methodology to Core Operating Limits Report References and Revised Large Break LOCA Analysis Supplemental Information
ML07268109619 September 2007Proposed Technical Specifications Change Revised Setting Limits and Overtemperature T/Overpower at T Time Constants.Hydrostatic
GOTHIC
ML07268117125 September 2007Proposed Technical Specifications Change Supplement Re Operable Definition Modification for Air Handling Units While in Temporary 45-Day Allowed Outage TimesProbabilistic Risk Assessment
ML07297060524 October 2007Exigent License Amendment Request Re Alternative Containment Analysis Methodology Supporting Information - Gothic Model Input Files
ML07348028723 January 2008Issuance of Amendments 258 and 257 Regarding Replacement of Main Control Room and Emergency Switchgear Room Air-Conditioning System Chilled Water PipingSafe Shutdown
High winds
Probabilistic Risk Assessment
Job Performance Measure
Large early release frequency
Earthquake
ML07351168217 December 2007Proposed License Amendment Request, One-Time Five-Year Extension to Type a Test IntervalHydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
Tornado Generated Missile
Design basis earthquake
Large early release frequency
Maintenance Rule Program
ML0809402872 April 2008Proposed License Amendment Request Revision of Technical Specifications Design FeaturesSafe Shutdown
High Radiation Area
Offsite Dose Calculation Manual
Design basis earthquake
Process Control Program
Earthquake
ML08108004414 April 2008Proposed License Amendment Request, Interim Alternate Repair Criteria (Iarc) for Steam Generator (SG) Tube RepairSafe Shutdown Earthquake
ML08225001317 September 2008Units, 1 and 2, Issuance of Amendments 261 and 261 Regarding the Revision to Various Setting Limits and the Overtemperature T/Overpower T Time Constants Tac Nos. MD6812 and MD6813)
ML08232119818 August 2008Application to Use Weighting Factors for External ExposureDeep Dose Equivalent
ML0828905299 October 2008Proposed License Amendment Request, Removal of Main Control Room Bottled Air System RequirementsSafe Shutdown
Shutdown Margin
Fire Barrier
Probabilistic Risk Assessment
Earthquake
Fire Protection Program
ML09104014713 April 2009Proposed License Amendment Request Correction to Technical Specification Table 3.7-1 Operator Action 3.b
ML0912704445 May 2009Proposed Emergency License Amendment Request, Modified Interim Alternate Repair Criteria for Unit 1 B Steam Generator Tube RepairSafe Shutdown Earthquake
Finite Element Analysis
Pressure Boundary Leakage
ML09215046428 July 2009Proposed License Amendment Request Permanent Alternate Repair Criteria for Steam Generator Tube RepairNondestructive Examination
Pressure Boundary Leakage
Unidentified leakage
Affidavit
ML09280035830 September 2009Proposed License Amendment Request One-time Alternate Repair Criteria for Steam Generator Tube Inspection/Repair for Units 1 & 2Pressure Boundary Leakage
ML09296061616 October 2009Proposed License Amendment Request Relocation of Core Operating Limits to the Core Operating Limits Report (COLR) and Addition of COLR ReferencesShutdown Margin
Anticipated operational occurrence
Fuel cladding
ML09336024720 November 2009Request for Approval of Cyber Security PlanSafe Shutdown
Cyber Security
Incorporated by reference
Fire Protection Program