Letter Sequence Request |
---|
|
|
MONTHYEARML0709300842007-03-29029 March 2007 Proposed Technical Specification Change Addition of Astrum Methodology to Core Operating Limits Report References and Revised Large Break LOCA Analysis Request for Additional Information Project stage: Request ML0721904822007-07-31031 July 2007 Proposed Technical Specifications Change Addition of Astrum Methodology to Core Operating Limits Report References and Revised Large Break LOCA Analysis Supplemental Information Project stage: Request ML0724906142007-09-0606 September 2007 Technical Specifications, Issuance of Amendments Regarding Use of Westinghouse Best-Estimate Large Break Loss-of-Coolant (TAC Nos. MD3609 & MD3610) Project stage: Approval ML0714300742007-09-0606 September 2007 License Amendment, Issuance of Amendments Regarding Use of Westinghouse Best-Estimate Large Break Loss-of-Coolant (TAC Nos. MD3609 & MD3610) Project stage: Approval 2007-07-31
[Table View] |
Similar Documents at Surry |
---|
Category:Fuel Cycle Reload Report
MONTHYEARML23102A1552023-04-11011 April 2023 Core Operating Limits Report, 2 Cycle 32 Pattern Hoo, Revision 0 ML22306A2112022-11-0101 November 2022 Core Operating Limits Report, Surry 1 Cycle 32 Pattern Sjk Revision 0 ML22306A2192022-11-0101 November 2022 Core Operating Limits Report - Surry 2 Cycle 31 Pattern Msk Revision 2 ML22179A2782022-06-27027 June 2022 Core Operating Limits Report, Cycle 31 Pattern Msk Revision 1 ML21307A4282021-11-0303 November 2021 Core Operating Limits Report Cycle 31 Pattern Msk Revision 0 ML21144A0832021-05-18018 May 2021 Core Operating Report Surry 2 Cycle 30 Operating Pattern Syk Revision 1 ML21140A3922021-05-18018 May 2021 Core Operating Limits Report - Surry 1 Cycle 31 Pattern Rna Revision 0 ML20140A1612020-05-12012 May 2020 Core Operating Limits Report: Surry 2 Cycle 30, Pattern Syk, Revision 0 ML19317D4602019-11-0707 November 2019 Core Operating Limits Report; Surry 1 Cycle 30 Pattern Apo Revision 0 ML18302A1222018-10-22022 October 2018 Core Operation Limits Report, Surry 2 Cycle 29 Pattern Sup, Revision 0 ML18128A1952018-05-0101 May 2018 Core Operating Limits Report Cycle 29 Pattern Zeu, Revision 0 ML17163A1772017-06-0606 June 2017 Core Operating Limits Report, Cycle 28 Pattern PRI, Revision 0 ML16312A0632016-11-0202 November 2016 Core Operating Limits Report for Cycle 28 Pattern APT, Revision 0 ML16112A2512016-03-0707 March 2016 Re Cycle 27 Startup Physics Tests Report ML16042A4032016-02-0404 February 2016 Core Operating Limits Report, Cycle 27 Pattern Hgg, Revision 2 ML15345A2422015-12-0808 December 2015 Virginia Electric and Power Company (Dominion) Surry Power Station Unit 2 Core Operating Limits Report Surry 2 Cycle 27 Pattern Hgg Revision 1 ML14119A1862014-04-23023 April 2014 Core Operating Limits Report Cycle 26 Pattern Eba Revision 0 ML13308B9062013-10-28028 October 2013 Core Operating Limits Report, Surry 1 Cycle 26 Pattern Apx Revision 0 ML12312A0652012-10-30030 October 2012 Submittal of Core Operating Limits Report (Colr), Cycle 25 Pattern Who, Revision 0 ML12143A1412012-05-16016 May 2012 Core Operating Limits Report Surry 1 Cycle 25 Pattern Gnu Revision 0 ML1123605152011-08-24024 August 2011 Core Operating Limits Report, Cycle 24 Pattern Owl Revision 1 ML1123605802011-08-24024 August 2011 Cycle 24 Pattern Upg Revision 1 ML1110404212011-04-14014 April 2011 Cycle 24 Core Operating Limits Report, Revision 0 ML11306A0242011-02-14014 February 2011 Cycle 24 Startup Physics Tests Report ML1035501802010-12-20020 December 2010 Cycle 23 Core Operating Limits Report, Revision 2 ML1031905152010-11-12012 November 2010 Cycle 24 Core Operating Limits Report, Revision 0 ML0931700222009-11-12012 November 2009 Cycle 23 Core Operating Limits Report Revision 0 ML0924005442009-08-27027 August 2009 Cycle 22 Core Operating Limits Report, Revision 2 ML0924004262009-08-27027 August 2009 Surrey, Unit 1 - Cycle 23 Core Operating Limits Report, Revision 1 ML0916603562009-06-15015 June 2009 Cycle 22 Core Operating Limits Report, Revision 1 ML0911306312009-04-23023 April 2009 Cycle 23 Core Operating Limits Report ML0810802542008-04-17017 April 2008 Cycle 22 Core Operating Limits Report ML0734005282007-12-0505 December 2007 Cycle 21 Core Operating Limits Report ML0734103472007-12-0505 December 2007 Cycle 22 Core Operating Limits Reports ML0721904822007-07-31031 July 2007 Proposed Technical Specifications Change Addition of Astrum Methodology to Core Operating Limits Report References and Revised Large Break LOCA Analysis Supplemental Information ML0632101302006-11-16016 November 2006 Cycle 21 Core Operating Limits Report ML0613504262006-05-15015 May 2006 Virginia Electric and Power Company Surry Power Station Unit 1 Revision to Cycle 21 Core Operating Limits Report ML0611802292006-04-28028 April 2006 Cycle 21 Core Operating Limits Report ML0515902922005-05-31031 May 2005 Cycle 20 Core Operating Limits Report ML0434402752004-12-0909 December 2004 Transmittal of Cycle 20 Core Operating Limits Report ML0333003342003-11-17017 November 2003 Cycle 19 Core Operating Limits Report, Revision 0 ML0330104502003-10-20020 October 2003 Cycle 19, Revision 1 to Core Operating Limits Report ML0316009722003-05-21021 May 2003 Cycle 19 Core Operating Limits Report 2023-04-11
[Table view] Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23061A0122023-05-0909 May 2023 Issuance of Amendment Nos. 312 and 312, Regarding Technical Specifications Task Force (TSTF) Traveler 547, Revision 1 ML23082A1362023-03-23023 March 2023 License Amendment Request NRC Approval of Methodology Change and Reclassification of the Turbine Building as a Tornado Resistant Structure Response to Request for Additional Information ML22339A1372022-12-0101 December 2022 License Amendment Request for NRC Approval of Methodology Change and Reclassification of the Turbine Building as a Tornado Resistant Structure Supplemental Information ML22322A1822022-11-18018 November 2022 Proposed Emergency Plan Revision - Relocation of the Technical Support Center ML22312A5502022-11-0707 November 2022 Proposed License Amendment Request to Revise Emergency Plan Staff Augmentation Times ML22227A1772022-08-15015 August 2022 License Amendment Request - Proposed Technical Specifications Change for New Fuel and Spent Fuel Storage Areas ML22171A0132022-06-20020 June 2022 Units, Units 1 and 2 - Proposed License Amendment Request Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML22172A1342022-06-20020 June 2022 License Amendment Request 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater (AFW) Cross-Connect Capability ML22146A0272022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant. ML22131A3102022-05-11011 May 2022 Proposed License Amendment Request Addition of Alternate Control Rod Position Monitoring Requirements ML22131A3512022-05-11011 May 2022 License Amendment Request for Application of Risk-Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML22104A1252022-04-14014 April 2022 License Amendment Request for NRC Approval of Methodology Change and Reclassification of the Turbine Building as a Tornado Resistant Structure ML21334A1692021-11-29029 November 2021 Proposed License Amendment Request Removal of Refueling Water Chemical Additional Tank and Replacement of Containment Buffer Supplemental Information ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML20338A5422020-12-0303 December 2020 Proposed License Amendment Request, Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis ML20296A6232020-10-22022 October 2020 Request for NRC Approval to Apply Leak-Before-Break Methodology to Reactor Coolant System Branch Piping ML20274A3292020-09-30030 September 2020 Proposed License Amendment Request: Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A, Revision 1 ML20105A2232020-04-14014 April 2020 Proposed License Amendment Request: One-Time Deferral of Surry Unit 2 Steam Generator B Inspection ML19343A0192019-12-0606 December 2019 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML19309D1992019-10-30030 October 2019 Proposed License Amendment Request: Temporary, One Time 14-Day Allowed Outage Time for Replacement of Reserve Station Service Transformer C 5KV Cables to Transfer Bus F ML19309D1962019-10-30030 October 2019 Proposed License Amendment Request Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident (LBLOCA) ML19042A1372019-01-29029 January 2019 Submittal of Supplement to Subsequent License Renewal Operating Licenses Application for Sufficiency Review Change Notice 1 ML18304A3302018-10-25025 October 2018 Proposed License Amendment Request TSTF-490 & Update of Alternative Source Term Analyses Response to Request for Additional Information & Revised Proposed Technical Specifications ML18025B4852018-01-16016 January 2018 Isfsis, Surry, Units 1 and 2, and ISFSIs - Submittal of Proposed Consolidated Emergency Operations Facility ML18025B4882018-01-16016 January 2018 Attachments 1 to 4: Proposed Consolidated Emergency Operations Facility ML18025B4912018-01-16016 January 2018 Attachments 5 and 6: North Anna - Proposed Changed to Emergency Plan Pages and Marked-Up SPS Emergency Plan Page Changes ML18025B4932018-01-16016 January 2018 Attachments 7 & 8: Surry - Proposed Changed SPS Emergency Plan Pages and Offsite Response Agency Letters of Concurrence ML17317A4642017-11-0707 November 2017 Proposed License Amendment Request, Temporary, One Time 21-Day Allowed Outage Time for Replacement of Reserve Station Service Transformer C and Associated Cabling ML17150A3022017-05-23023 May 2017 Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01 ML17026A1742017-01-20020 January 2017 Surrey Power Station, Units 1 and 2 - Proposed License Amendment Request for Revision to Technical Specifications Residual Heat Removal Requirements and Component Cooling System Requirements & Addition of Surveillance Requirement ML16146A5402016-05-18018 May 2016 Proposed License Amendment Request Extension of TS 3.14 Service Water Flow Path Allowed Outage Times and Deletion of Expired Temporary Service Water Jumper Requirements ML14160A6072014-06-0303 June 2014 Proposed License Amendment Request Clarification of Reactor Coolant System Heatup and Cooldown Limitations Technical Specifications ML14112A0732014-04-11011 April 2014 Proposed License Amendment Request Relocation of Augmented Inspection Requirements from TS 4.2 and TS 4.15 to Technical Requirements Manual ML14079A0832014-03-13013 March 2014 Proposed License Amendment Request Regarding Relocation of Snubber Surveillance Requirements from Technical Specification 4.17 to Snubber Program - Correction ML13231A1702013-09-23023 September 2013 Issuance of Amendments Regarding Use of a Temporary Jumper for Providing Service Water ML13248A1072013-09-0303 September 2013 Proposed License Amendment Request Regarding Temporary Service Water Jumper to the Component Cooling Heat Exchangers Correction of Identified Discrepancy ML13232A0422013-08-12012 August 2013 Proposed License Amendment Request Permanent Fifteen-Year Type a Test Interval ML13179A0142013-06-26026 June 2013 Proposed License Amendment Request Addition of an Analytical Methodology to Core Operating Limits Reports and an Increase to Minimum Temperature for Criticality ML13179A0152013-05-31031 May 2013 Units I and 2, Qualification of the ABB-NV and Wlop CHF Correlations in the Dominion VIPRE-D Computer Code ML13137A3132013-05-13013 May 2013 Proposed License Amendment Request Regarding Relocation of Snubber Surveillance Requirements from Technical Specification 4.17 to Snubber Program ML12283A0692012-09-27027 September 2012 ISFSIs and Surry, Units 1 and 2 and ISFSIs Proposed Emergency Action Level Revisions ML12279A2822012-09-26026 September 2012 Proposed License Amendment Request Regarding Temporary Service Water Jumper to the Component Cooling Heat Exchangers ML12222A3402012-07-31031 July 2012 Proposed Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process ML11171A5522011-06-0707 June 2011 Vpdes Permit No. VA0004049 Application for Permit Reissuance ML1035502062010-12-16016 December 2010 Proposed Technical Specification Change Temporary Alternate Repair Criteria for Steam Generator Tube Repair for Unit 2 ML1013106042010-05-0606 May 2010 License Amendment Request Revised Cumulative Core Burnup Applicability Limit for Heatup and Cooldown Curves, Low Temperature Overpressure Protection System Setpoint, and Ltops Enable Temperature ML1009003912010-03-30030 March 2010 Proposed License Amendment Request Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirement to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) 2023-08-10
[Table view] |
Text
I1 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 July 31, 2007 10 CFR 50.90 U.S. Nuclear Regulatory Commission Serial No. 06-936B Attention: Document Control Desk NLOS/GDM RO Washington, D.C. 20555 Docket Nos. 50-280/281 License Nos. DPR-32/37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGE ADDITION OF ASTRUM METHODOLOGY TO CORE OPERATING LIMITS REPORT REFERENCES AND REVISED LARGE BREAK LOCA ANALYSIS SUPPLEMENTAL INFORMATION In a letter dated November 16, 2006 (Serial No.06-936), Virginia Electric and Power Company (Dominion) requested amendments in the form of changes to the Technical Specifications (TS) to Facility Operating License Numbers DPR-32 and DPR-37 for Surry Power Station Units 1 and 2, respectively. The proposed change would add a reference in Technical Specification 6.2.C, "Core Operating Limits Report (COLR)," to permit the use of the Westinghouse Best-Estimate Large Break Loss of Coolant Accident (BE-LBLOCA) analysis methodology using the Automated Statistical Treatment of Uncertainty Method (ASTRUM) for the analysis of LBLOCA. Dominion provided additional information in support of the license amendment request in a letter dated March 29, 2007 (Serial No. 06-936A).
On May 23, 2007, Dominion was informed by Westinghouse that the BE-LBLOCA analysis discussed in the license amendment request contained a computer code error associated with the determination of the limiting peak clad temperature (PCT). Although the error does not affect the conclusions of the analysis, we informed the NRC of this code error during a conference call on May 24, 2007. Dominion's plans to address the error were discussed with the NRC during subsequent conference calls, and it was agreed that Dominion would provide supplemental information that: 1) summarizes the code error issue and its effects on the key results of the BE-LBLOCA analysis, 2) describes the interim re-analysis effort that has been performed to address the error, and 3) details the additional analysis that would be performed to further substantiate acceptable PCT results for Surry Power Station Units 1 and 2. This information is provided in the attachment and the commitment described in this letter. The additional information provided herein does not affect the significant hazards consideration determination or environmental assessment that was previously provided in support of the proposed license amendment request.
In the discussions with the NRC regarding this error, it was concluded that the interim re-analysis effort would need to be supplemented by additional analysis to fully account for effects of the error on detailed results inherent in the ASTRUM BE-LBLOCA calculation.
On this basis, Dominion commits to perform a full BE-LBLOCA reanalysis for Surry Power
Serial No. 06-936B Docket Nos. 50-280/281 Page 2 of 3 Station Units 1 and 2 and to submit the reanalysis results to the NRC by December 31, 2008.
Finally, as discussed in Dominion's initial submittal dated November 16, 2006, previously approved Surry TS Amendments 250/249 revise the method for starting the inside and outside recirculation spray (RS) pumps as part of the resolution to GSI-1 91, Assessment of Debris Accumulation on PWR Sump Performance. This change was implemented for Surry Unit 2 during the fall 2006 refueling outage and will be implemented for Surry Unit 1 during the fall 2007 refueling outage. The supporting analyses for the implementation of the Westinghouse BE-LBLOCA analysis methodology using ASTRUM credits these changes to the Engineered Safety Features setpoints. Thus, coordinated implementation of the BE-LBLOCA analysis with the GSI-1 91 pump start change is planned prior to power operation during startup from the Surry Unit 1 fall 2007 refueling outage. To support this planned implementation, approval of this TS change and the interim Surry BE-LBLOCA analysis is requested by September 28, 2007.
If you have any questions or require additional information, please contact Mr. Gary D. Miller at (804) 273-2771.
Very truly yours, Gerald T. Bischof Vice President - Nuclear Engineering
Attachment:
- Supplemental Information, Surry BE-LBLOCA ASTRUM Analysis Commitment made in this letter:
- Dominion commits to perform a full BE-LBLOCA reanalysis for Surry Power Station Units 1 and 2 and to submit the reanalysis results to the NRC by December 31, 2008.
COMMONWEALTH OF VIRGINIA
)
COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Gerald T. Bischof, who is Vice President - Nuclear Engineering, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me the 3,15-r day of m/t, 2007.
V U My Commission Expires: /1)'14Lo;. a 06 N Public MMOARE 6. U*NNU Notary Pubf iOc o MY COMMkaOW Exprm, Aug 31. 2WOO l i . !
-- Ii
Serial No. 06-936B Docket Nos. 50-280/281 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23 T85 Atlanta, Georgia 30303 Mr. E. Riggs NRC Senior Resident Inspector Surry Power Station State Health Commissioner Virginia Department of Health James Madison Building - 7th floor, Room 730 109 Governor Street Richmond, Virginia 23219 Mr. S. P. Lingam NRC Project Manager - Surry U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9A Rockville, Maryland 20852 Mr. R. A. Jervey NRC Project Manager - North Anna U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9A Rockville, Maryland 20852
Serial No. 06-936B Docket Nos. 50-280/281 ATTACHMENT SUPPLEMENTAL INFORMATION SURRY BE-LBLOCA ASTRUM ANALYSIS Virginia Electric and Power Company (Dominion)
Surry Power Station Units 1 and 2
Serial No. 06-936B Docket Nos. 50-280/281 Attachment SUPPLEMENTAL INFORMATION ASTRUM BE-LBLOCA ANALYSIS SURRY POWER STATION UNITS 1 AND 2 BACKGROUND The Large Break Loss of Coolant Accident (LBLOCA) was analyzed for Surry Units 1 and 2 using the Westinghouse ASTRUM methodology (Reference 1). The resulting Peak Cladding Temperature (PCT), Local Maximum Oxidation (LMO), and Core-wide Oxidation (CWO) values from this analysis were 2,044°F, 5.3%, and 0.32%,
respectively. A License Amendment Request for Operating License Numbers DPR-32 (Surry Unit 1) and DPR-37 (Surry Unit 2) was submitted to the United States Nuclear Regulatory Commission requesting approval to apply the Westinghouse ASTRUM methodology to Surry Units 1 and 2 (Reference 2) based on these analysis results.
After completion of the Surry Units 1 and 2 ASTRUM analysis, Westinghouse discovered an error in the HOTSPOT code. In the axial node where burst is predicted to occur, a fuel relocation model is used to account for the likelihood that additional fuel pellet fragments may settle into the burst region. It was discovered that the effect of fuel relocation on local linear heat rate was being calculated, but then cancelled out later in the calculation. The impact of the fuel relocation error correction on the Surry Units 1 and 2 ASTRUM analysis has been assessed and is described herein.
The minimum containment pressure transient used in the original Surry ASTRUM submittal (Figure 18 in Reference 2) was a conservative estimate, intended to bound GSI-191 modifications at both units. Final containment design inputs were provided after the ASTRUM analysis completion, which included revised sump screen wall data, a delay in containment spray actuation, and an increase in the minimum initial containment pressure. These changes improve the containment pressure response for the LBLOCA accident, and have been assessed to partially offset the impact of correcting the HOTSPOT fuel relocation error.
The evaluation of the HOTSPOT fuel relocation error and revised containment pressure transient are described in the following section.
SUPPLEMENTAL ASSESSMENTS The impact of the HOTSPOT fuel relocation error was assessed for the Surry Units 1 and 2 ASTRUM analysis through the re-analysis of all the burst cases with a corrected code version. The two most limiting cases (Runs 097 and 100) resulted in a PCT greater than the original ASTRUM analysis value. These cases were then re-analyzed using the revised containment pressure transient reflecting the changes described in the Background Section. The resulting PCT and LMO after the assessments are 2,095°F and 10.8%, respectively.
Page 1 of 2
Serial No. 06-936B Docket Nos. 50-280/281 Attachment The HOTSPOT fuel relocation error had a negligible impact on the core-wide oxidation, since this error only impacts local behavior at the hot rod burst elevation. While the improved containment pressure response would tend to benefit the core-wide oxidation calculation, this benefit was not quantified. As such, the 0.32% core-wide oxidation reported in the original submittal (Reference 2) remains conservative with respect to these supplemental assessments.
For the BELOCA ASTRUM analysis, limiting calculated transient oxidation is obtained for fresh fuel (first cycle of irradiation). The maximum expected total of the normal operation (pre-transient) and LOCA transient oxidation, for any time in life, was considered for Surry Units 1 and 2. The pre-transient oxidation tends to increase from a minimum value at beginning-of-life to a maximum value at end-of-life, while the transient oxidation tends to decrease with increasing fuel burnup. The sum of the pre-transient and transient oxidation was confirmed to remain below 17% for all times in life. This confirmation credited a modest reduction in achievable rod power and maximum steady-state-depletion (baseload) FQ for fuel beyond the first cycle of irradiation. These reductions will be implemented as design limits in the core reload design process, and confirmed for each reload on a pin-wise basis.
CONCLUSIONS The results of the supplemental assessments for Surry Units 1 and 2 are a PCT of 2,095°F, LMO of 10.8%, and CWO of 0.32%. These results confirm that Surry Units 1 and 2 maintain compliance with the 10 CFR 50.46 acceptance criteria of PCT < 2,200 0 F, LMO < 17%, and CWO < 1%.
REFERENCES
- 1. WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005.
- 2. Dominion letter No.06-936, "Virginia Electric and Power Company, Surry Power Station Units 1 and 2, Proposed Technical Specifications Change, Addition of ASTRUM Methodology to Core Operating Limits Report References and Revised Large Break LOCA Analysis," November 16, 2006.
Page 2 of 2