Proposed Technical Specifications Change Re Redefinition of Exclusion Area Boundary
ML052570125
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/13/2005
From: Hartz L
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
05-601
Download: ML052570125 (40)


Text

VIRGINIA ELECTRIC AND POWER COMPANY

RICHMOND, VIRGINIA 23261 September 13, 2005 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 1 OCFR50.92 Serial No.05-601 NL&OS/GDM RO Docket Nos. 50-280 License Nos. DPR-32 50-281 DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGE REDEFINITION OF EXCLUSION AREA BOUNDARY Pursuant to 10 CFR 50.90, Virginia Electric and Power Company (Dominion) requests an amendment to Facility Operating License Numbers DPR-32 and DPR-37 in the form of changes to the Technical Specifications (TS) for Surry Power Station Units 1 and 2, respectively. The proposed change redefines the exclusion area boundary (EAB) as the site boundary in Technical Specification 5.1 Site.

The redefined EAB will significantly reduce the design basis accident Atmospheric Dispersion Factor (WQ),

which will consequently reduce the calculated EAB dose consequences for Updated Safety Analysis Report Chapter 14 accidents in future reanalyses. A discussion of the proposed TS change is provided in Attachment 1. The marked-up and proposed TS pages are provided in Attachments 2 and 3, respectively.

We have evaluated the proposed TS change and have determined that it does not involve a significant hazards consideration as defined in 10 CFR 50.92. The basis for our determination is provided in Attachment 1. We have also determined that operation with the proposed change will not result in any significant increase in the amount of effluents that may be released offsite and no significant increase in individual or cumulative occupational radiation exposure. Therefore] the proposed amendment is eligible for categorical exclusion as set forth in 10 CFR 51.22(~)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment is needed in connection with the approval of the proposed change.

The proposed change has been reviewed and approved by the Station Nuclear Safety and Operating Committee] as well as the Management Safety Review Committee.

Approval of the proposed change is requested by July 31, 2006, with a 30-day implementation period following issuance of the TS amendments.

Serial No.05-601 Docket Nos. 50-280,281 Page 2 of 3 If you have any questions or require additional information regarding this TS change request, please contact Mr. Gary Miller at (804) 273-2771.

Very truly yours, L. N. Hartz Vice President - Nuclear Engineering Attachments:

1. Discussion of Change
2. Marked-up Technical Specifications Pages
3. Proposed Technical Specifications Pages Commitments made in this letter: None

Serial No.05-601 Docket Nos. 50-280,281 Page 3 of 3 cc:

U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. N. P. Garrett NRC Senior Resident Inspector Surry Power Station Co m mi ssi o n e r Bureau of Radiological Health 1500 East Main Street Suite 240 Richmond, VA 23218 Mr. S. R. Monarque NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11 555 Rockville Pike Mail Stop 8-HI 2 Rockville, MD 20852 Mr. R. E. Martin NRC Lead Project Manager - North Anna and Surry U. S. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Mail Stop 8-G9A Rockville, MD 20852

Serial No.05-601 Docket Nos. 50-280, 281 ATTACHMENT 1 Discussion of Change Virginia Electric and Power Company (Dominion)

Surry Power Station Units 1 and 2

DISCUSSION OF CHANGE Introduction Pursuant to 1 OCFR50.90, Virginia Electric and Power Company (Dominion) requests a change to the Technical Specifications for Surry Power Station Units 1 and 2. The proposed change redefines the exclusion area boundary (EAB) as the site boundary in Technical Specification 5.1, Site. This redefined EAB will significantly reduce the design basis accident Atmospheric Dispersion Factor (WQ). Reducing the WQ will, in turn, reduce the calculated EAB dose consequences for the UFSAR Chapter 14 accidents in future reanalyses.

The proposed change has been reviewed with respect to 10CFR50.92, and it has been determined that no significant hazards consideration exists. In addition, it has been determined that the change qualifies for categorical exclusion from an environmental assessment as set forth in 1 OCFR51.22(~)(9); therefore, no environmental impact statement or environmental assessment is needed in connection with the approval of the proposed change. This proposed change to Technical Specification 5.1 has no adverse safety impact and will result in an increase in margin to the dose consequence limits for future accident reanalyses.

Backaround Information/Licensina Basis Dominion described the restricted area and the EAB in Preliminary Safety Analysis Report Amendment 22 of the Surry license application (Reference 1). The restricted area was described as the area enclosed by the site boundary. Dominion owns and controls access to the restricted area, exposure of individuals in this area is within the limits established in 10CFR20, and the boundary is clearly posted and monitored to ensure that unauthorized personnel will not transgress the boundary. In Figure S2.1-1 of Reference 1, the property line defines the restricted area thus establishing the site boundary as being equivalent to the property line. Reference 1 also describes the EAB as bounded by a 1650 ft. radius circle centered at the reactor containment building No. 1. This reference also states that this circle size was determined by the shortest distance to the site boundary and is sufficient, in conjunction with the plant design, to ensure that the dose limitations of 10CFR100 are met. This EAB definition was also used in the original Surry Technical Specifications dated March 17, 1972.

Currently, UFSAR Section 2.1.2.1 and Technical Specification 5.1 indicate that the minimum distance from a reactor centerline to the site EAB, as defined in IOCFR100, is 1650 ft. The UFSAR indicates that this distance is based on the distance from the Unit 1 containment centerline to the site boundary to the north, which is sufficient, in conjunction with the plant design, to ensure that the dose limitations of 1 OCFR50.67 are met.

Page 1 of 32

Based on the Technical Specification 5.1 minimum distance to the EAB, 1650 ft. was the distance used to calculate the Atmospheric Dispersion Factor (WQ) of 4.61 E-03 sec/m3 that was used in evaluating dose consequences at the EAB in the Surry Alternative Source Term (AST) license amendment request (References 2 - 9).

This X/Q was based on the Regulatory Guide 1.145 methodology using the PAVAN code with meteorological data from 1994 - 1998. Use of the 4.61 E-03 sec/m3 EAB WQ resulted in a LOCA EAB dose consequence of 24.01 Rem total effective dose equivalent (TEDE) versus a limit of 25 Rem TEDE and a Fuel Handling Accident (FHA)

EAB dose consequence of 6.27 Rem TEDE versus a limit of 6.3 Rem TEDE.

Reference 10 documents NRC approval of the Surry AST design basis, including the EAB WQ.

Redefinition of the EAB as the Site Boundary 10CFR100 includes no requirement for the EAB to be a circle, but does require the licensee to have authority to determine all activities including exclusion or removal of personnel and property from the area. Surry Power Station controls access to all areas within the site boundary.

Distances from the various release points on the site to the site boundary in the sixteen wind sectors that are used in the PAVAN calculation of WQ values vary considerably.

In general, a shorter distance between the source release point and the receptor results in a higher WQ.

For future dose analyses that may be accommodated under 10CFR50.59, it is proposed that the source-to-receptor distances in Table 1 be used to define the EAB by wind sector, which will result in the lower EAB WQ values listed in Table 2. The distance values in Table 1 are the minimum distances from the potential source release points for the LOCA and FHA to the site boundary in each wind sector.

Figure 1 is the site map that was used to determine the minimum distances from the potential source release points to the closest point on the site boundary within each wind sector. Figure 1 also shows the wind sector definition lines that were used to determine the sector dependent distances to the site boundary from the centerline of the Unit 1 Containment. Similarly, the wind sector definition lines were centered over the approximate location of each of the remaining source points in Table 1 in order to determine the minimum sector dependent distances to the site boundary from each source point.

Page 2 of 32

Table 1 : Surry EAB Source to Receptor Distance* Table with Sectors Defined with Respect to Each Source Location These distances are approximations, based on a computer-aided design (CAD) drawing. The distance of 1623 ft used in the N and NNE sectors is bounding and represents a best approximation for the defined minimum distance in Technical Specification 5.1 of 1650 ft.

These new EAB distances from Table 1 were used to modify the PAVAN input decks submitted for the AST amendment in Reference 6. Table 2 contains the results of PAVAN runs completed using the 5 sets of source-to-receptor distances from Table 1 and joint frequency distribution (JFD) tables based on meteorological data from 1994-1998. Tables 3 and 4 contain the JFDs and PAVAN input decks, respectively, that were used in the calculation of new WQ values for the EAB. The JFDs in Table 3 are identical to the JFDs for the 1994 - 1998 meteorological data previously submitted for the AST amendment (Attachment 2 to Reference 6). The PAVAN input decks in Table 4 have been revised from those used with the AST amendment to reflect the distances of Table 1. Table 5 contains the PAVAN output that results from the execution of the Table 4 input.

Page 3 of 32

Based on Regulatory Guide 1.145, the WQ value used in an accident analysis should be the limiting 0.5% sector-dependent WQ or the 5% overall site WQ values, whichever is higher.

The PAVAN results in Table 2 are the limiting 0-2 hour 0.5%

sector-dependent X/Q values, which were higher than the 5% overall site WQ. The worst-case 0-2 hour WQ (1.79E-03) at the redefined EAB occurred in the north direction as a result of release from the Unit 1 Containment.

Downwind Receptor Direction/Sector Source Location Unit 1 Containment EAB N1348.75-11.25 Downwind 0-2 hr Distance (m) (sec/m3) 495 1.79E-03 lunit 2 Containment I EAB I N/348.75-11.25 I 515 I 1.67E-031 EAB EAB West Auxiliary Building Louvers East Auxiliary Building Louvers (Ventilation Vent No. 2 I EAB I N/348.75-11.25 I 517 I 1.66E-031 N/348.75-11.25 523 1.63E-03 N/348.75-11.25 530 1.59E-03 Not shown in Tables 1 and 2 are source locations and WQ values for the steam generator power operated relief valves (PORVs) and safety valves. These source release locations would be used for the Steam Generator Tube Rupture, Main Steam Line Break, and Locked Rotor Accident. As discussed above, the limiting EAB WQ value among the 5 sources analyzed is the maximum 0.5% sector-dependent WQ in the north direction from the Unit 1 containment. The occurrence of the maximum 0.5%

sector-dependent WQ value in the north direction is primarily due to the relatively short source-to-receptor distance.

Figure 2 is a simplified site plan that was originally included in Reference 8, which was updated to include the steam generator PORVs and safety valves. As shown on Figure 2, the steam generator PORVs and safety valves are located against the southern side of the Unit 1 and Unit 2 containments. Based on inspection of the site geometry shown in Figures 1 and 2 and the results of Table 5 (PAVAN output), atmospheric dispersion from the PORVs and safety valves to the site boundary would be bounded by the Unit 1 Containment source location. Hence, the value 1.79E-03 sec/m3 would be appropriate to use as an EAB WQ for all accidents that have source locations that are bounded by the dispersion from the Unit 1 Containment.

It is intended that the highest valued 0-2 hour WQ in Table 2 (1.79E-03 sec/m3) will be used in future EAB dose assessments as an approved change to an element of a methodology.

Prior NRC review and approval of this change in the EAB X/Q is required, in accordance with 10CFR50.59, because the new value will result in a Page 4 of 32

significant increase in margin to the 10CFR50.67 offsite dose limit by changing an element of the methodology. The dose consequence accident analyses were not submitted with this change because the EAB results listed in the UFSAR are conservative with respect to consequences that would be calculated using this new EAB WQ.

Description of Proposed TS Chanqe Details of the specific revisions are provided in the following paragraphs.

The last two sentences of Technical Specification 5.1 currently state:

The minimum distance from a reactor centerline to the site exclusion boundary as defined in 10CFRl00 is 1,650 ft. This is the distance for Unit 1, which is controlling.

A map of the site is shown in TS Figure 5.1 - 1.

The last two sentences of Technical Specification 5.1 are revised as follows:

The site exclusion area boundary is defined by the site boundary line shown on the site map in TS Figure 5.1-1. The minimum distance from a reactor centerline to the site exclusion area boundary as defined in 10CFR100 is 1,650 ft.

This is the distance for Unit 1, which is controlling.

No Siqnificant Hazards Consideration The proposed change redefines the exclusion area boundary (EAB) as the site boundary. This redefined EAB will significantly reduce the design basis accident (DBA)

Atmospheric Dispersion Factor (WQ). Reducing the X/Q will, in turn, reduce the calculated EAB dose consequences for the UFSAR Chapter 14 accidents in future reanalyses. The proposed change does not involve a significant hazards consideration because operation of Surry Units 1 and 2 in accordance with this change would not:

1. Involve a significant increase in the probability or consequences of an accident previously evaluated.

The proposed redefinition of the EAB will significantly reduce the design basis accident WQ, which will result in an increase in margin to the dose consequence limits for future accident analyses. The dose consequence accident analyses were not reanalyzed with this change because the EAB results currently documented in the UFSAR are conservative with respect to consequences that would be calculated using this redefined EAB. The EAB redefinition is not an initiator of any accident previously evaluated and has no impact on radiation levels, airborne activity, DBA source terms, or releases. Therefore, the proposed change does not involve a Page 5 of 32

2.
3.

significant increase in either the probability or consequences of an accident previously evaluated.

Create the possibilitv of a new or different kind of accident from anv accident previously identified.

The proposed change involves no physical changes to the plant, nor is there any impact on the design or operation of the plant. There is also no impact on any equipment relied upon to mitigate an accident. Therefore, the proposed change does not introduce any new failures that could create the possibility of a new or different kind of accident from any accident previously identified.

Involve a siqnificant reduction in a marqin of safetv.

The proposed change does not alter the condition or performance of equipment or systems used in accident mitigation or assumed in any accident analysis. The EAB redefinition has no impact on radiation levels, airborne activity, DBA source terms, or releases. Therefore, this proposed change does not involve a significant reduction in the margin of safety.

However, the proposed redefinition of the EAB will significantly reduce the design basis accident WQ, which will result in an increase in margin to the dose consequence limits for future accident analyses.

Environmental Assessment This amendment request meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(~)(9) as follows:

(i)

The amendment involves no significant hazards consideration.

As described above, the proposed change to Technical Specification 5.1 to redefine the EAB does not involve a significant hazards consideration.

There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite.

(ii)

The proposed redefinition of the EAB does not involve the installation of any new equipment or the modification of any equipment that may affect the types or amounts of effluents that may be released offsite. Therefore, there is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite.

(iii)

There is no significant increase in individual or cumulative occupational radiation exposure.

The proposed redefinition of the EAB does not involve plant physical changes that affect radiation exposure. Radiation levels, airborne activity, design basis accident Page 6 of 32

sources terms, and releases are not impacted by the proposed change. Therefore, there is no significant increase in individual or cumulative occupational radiation exposure.

Based on the above assessment, Dominion concludes that the proposed change meets the criteria specified in 10 CFR 51.22 for a categorical exclusion from the requirements of 10 CFR 51.22 relative to requiring a specific environmental assessment or impact statement by the Commission.

Changing the EAB boundary so that it is equivalent to the site boundary will not impact radiation levels, airborne activity, DBA source terms, or releases. The effectiveness of the Emergency Plan is not affected by changing the EAB definition from 1650 ft to being equivalent to the site boundary. 10CFR100 requires that the licensee have authority to determine all activities including exclusion or removal of personnel and property from the area and limit dose to members of the public. The redefined EAB meets these regulatory requirements.

Additionally, by redefining the EAB as the site boundary, the proposed changes to Technical Specification 5.1 would allow for a significant reduction of the EAB WQ.

Reducing the EAB WQ will, in turn, reduce the calculated EAB dose consequences for Chapter 14 accidents in future reanalyses.

This proposed change to Technical Specification 5.1 has no adverse safety impact and will result in an increase in margin to the dose consequence limits for future accident reanalyses.

Page 7 of 32

References

1. Letter Amending the Surry License Application, Preliminary Safety Analysis Report -

Amendment No. 22, May 28, 1971.

2. Letter Serial Number 00-123, Virginia Electric and Power Company Surry Power Station Units 1 and 2, Proposed Technical Specifications and Bases Change -

Alternate Source Term Implementation, April 11, 2000.

3. Letter Serial Number 00-123A, Virginia Electric and Power Company Surry Power Station Units 1 and 2, Request for Additional Information: Alternate Source Term -

Proposed Technical Specification Change, August 28, 2000.

4. Letter Serial Number 00-123B, Virginia Electric and Power Company Surry Power Station Units 1 and 2, Request for Additional Information: Alternate Source Term -

Proposed Technical Specification Change, November 20, 2000.

5. Letter Serial Number 01-037, Virginia Electric and Power Company Surry Power Station Units 1 and 2, Request for Additional Information: Alternate Source Term -

Proposed Technical Specification Change, April 11, 2001.

6. Letter Serial Number 01-037A, Virginia Electric and Power Company Surry Power Station Units 1 and 2, Response to Request for Additional information: Alternate Source Term - Proposed Technical Specification Change, July 31, 2001.
7. Letter Serial Number 01 -037BVirginia Electric and Power Company Surry Power Station Units 1 and 2, Response to Request for Additional Information: Alternate Source Term - Proposed Technical Specification Change, November 19, 2001.
8. Letter Serial Number 01-037C, Virginia Electric and Power Company Surry Power Station Units 1 and 2, Response to Request for Additional Information: Alternate Source Term - Proposed Technical Specification Change, December 20, 2001.
9. Letter Serial Number 01-037D, Virginia Electric and Power Company Surry Power Station Units 1 and 2, Technical Specification Basis Change - Alternate Source Term Implementation, February 8, 2002.

10.Letter Serial Number 02-170, Surry Units 1 and 2 - Issuance of Amendments Re: Alternative Source Term (TAC NOS. MA8649 and MA8650), March 8, 2002.

Page 3 of 32

Service Building

-1 Turbine Building Control Room D1+

Source s 1 s 2 s3 s4 v 2 P1 P2 D2 R6 R7 r

1 Legend Receptor L1 through L6 R2 through R5 R6, R7 Unit 1 Containment D1, D2 Rollup Doors 1 and 2 Unit 2 Containment Auxiliary Building West Louver R1 Control Room Normal Intake Auxiliary Building East Louver Ventilation Vent No. 2 Unit 1 Steam Generator PORVs and Safeties Unit 2 Steam Generator PORVs and Safeties Turbine Building Fresh A r Louvers 1 through 6 Control Room Emergency Intakes Turbine Building Fresh Air Intakes Page 10 of 32

Table 3: Joint Frequency Distribution Tables for 1994-1 998 Meteorological Data with Standard M/S Bins 1

1994-98 SURRY MET DATA 10:38 WEDNESDAY, FEBRUARY 28, 2001

L STABILITY CLASS A TABLE OF WINSPEED BY SECTOR WINSPEED SECTOR TABLE OF WINSPEED BY SECTOR WINSPEED SECTOR TOTAL 1

3 15 328 1400 3335 2046 130 3

7261 TOTAL 1

3 15 328 1400 3335 2046 130 3

7261 Page 11 of 32

1 Table 3: Joint Frequency Distribution Tables for 1994-1998 Meteorological Data, Continued 1994-98 SURRY MET DATA 10:38 WEDNESDAY, FEBRUARY 28, 2001

2 STABILITY CLASS B TABLE OF WINSPEED BY SECTOR WINS PEED SECTOR TABLE OF WINSPEED BY SECTOR WINSPEED SECTOR TOTAL 3

16 187 367 565 328 26 3

1495 TOTAL 3

16 187 367 565 328 26 3

1495 Page 12 of 32

1 Table 3: Joint Frequency Distribution Tables for 1994-1998 Meteorological Data, Continued 1994-98 SURRY MET DATA 10:38 WEDNESDAY, FEBRUARY 28, 2001 3

STABILITY CLASS C TABLE OF WINSPEED BY SECTOR WINSPEED SECTOR TABLE OF WINSPEED BY SECTOR WINS PEED SECTOR TOTAL 8

49 252 385 583 374 36 1

1688 TOTAL 8

49 252 385 583 374 36 1

1688 Page 13 of 32

1 Table 3: Joint Frequency Distribution Tables for 1994-1998 Meteorological Data, Continued 1994-98 SURRY MET DATA 10:38 WEDNESDAY, FEBRUARY 28. 2001 4

STABILITY CLASS D TABLE OF WINSPEED BY SECTOR TABLE OF WINSPEED BY SECTOR WINSPEED SECTOR TOTAL 61 143 500 1477 1860 3489 2458 239 10 10237 TOTAL 61 143 500 1477 1860 3489 2458 239 10 10237 Page 14 of 32

1 1

Table 3: Joint Frequency Distribution Tables for 1994-1998 Meteorological Data, Continued 1994-98 SURRY MET DATA 10:38 WEDNESDAY, FEBRUARY 28, 2001 5

STABILITY CLASS E TABLE OF WINSPEED BY SECTOR WINSPEED SECTOR 1994-98 SURRY MET DATA STABILITY CLASS E TABLE OF WINSPEED BY SECTOR WINSPEED SECTOR TOTAL 315 465 1260 2823 2843 3686 1311 88 11 3

12805 10:38 WEDNESDAY, FEBRUARY 28, 2001 6

TOTAL 315 465 1260 2823 2843 3686 1311 88 11 3

12805 Page 15 of 32

1 Table 3: Joint Frequency Distribution Tables for 1994-1998 Meteorological Data, Continued 1994-98 SURRY MET DATA 10:38 WEDNESDAY, FEBRUARY 28, 2001 7

STABILITY CLASS F TABLE OF WINSPEED BY SECTOR WINSPEED SECTOR TABLE OF WINSPEED BY SECTOR WINSPEED SECTOR TOTAL 671 661 1089 1069 401 123 5

4019 TOTAL 671 661 1089 1069 401 123 5

4019 Page 16 of 32

1 Table 3: Joint Frequency Distribution Tables for 1994-1998 Meteorological Data, Continued 1994-98 SURRY MET DATA 10:38 WEDNESDAY, FEBRUARY 28, 2001 8

STABILITY CLASS G TABLE OF WINSPEED BY SECTOR WINSPEED SECTOR TABLE OF WINSPEED BY SECTOR WINSPEED SECTOR TOTAL 3215 907 753 349 34 3

5261 TOTAL 3215 907 753 349 34 3

5261 Page 17 of 32

Table 4: PAVAN input files Unit 1 Containment Release:

0100 00001 Surry (new EAB) 1994-98 JFD Ground-Level Release Onsite Unit 1 Reactor Release 960. 35.5 10. 9.6 9.6 m 9.6 m - 44.9 m 10 0

0 0

0 0

0 0

0 0

0 0

0 1

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

1 1

0 0

1 0

0 0

0 0

1 3

0 1

2 1

3 1

1 0

0 0

2 0

0 9

7 8

18 23 34 50 26 23 17 7

13 32 39 18 4

41 42 65 95 163 186 158 35 35 49 38 43 135 174 95 46 131 173 170 197 352 379 159 32 41 128 260 157 229 407 371 149 64 89 58 95 319 10 3

0 6

69 370 156 98 208 300 201 0

0 3

2 24 0

0 0

1 1

20 8

6 1

49 15 0

0 0

0 0

0 0

0 0

0 0

0 0

0 2

1 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 1

0 0

0 0

1 1

0 0

0 0

0 0

0 0

0 0

0 0

1 2

3 6

0 2

0 1

0 0

1 0

0 7

8 10 6

19 22 22 10 5

9 9

7 16 21 6

10 13 21 19 20 48 47 19 7

8 20 11 18 34 34 29 19 35 35 44 51 86 42 9

2 9

19 70 32 26 28 37 40 13

'10 11 12 53 4

0 3

2 17 62 45 14 9

31 42 0

0 0

0 1

0 0

0 0

0 4

3 2

0 13 3

0 0

0 0

2 0

0 0

0 0

0 0

0 0

1 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 1

0 0

0 0

0 0

2 1

0 1

1 1

1 0

3 1

1 1

2 4

5 6

3 0

3 4

8 5

1 2

15 6

14 19 19 28 25 13 5

9 11 17 19 15 17 20 29 33 29 27 45 39 19 7

6 14 17 11 23 38 28 20 57 32 40 57 83 3 6 9

4 5

21 61 43 29 26 45 35 20 15 23 13 62 0

0 2

5 13 62 43 16 12 36 52 0

0 0

1 6

0 0

0 0

0 2

8 3

1 8

7 0

0 0

0 1.

o 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 6

4 3

2 2

5 8

4 4

5 1

3 4

3 4

3 3

6 7

6 5

12 16 12 8

10 15 10 12 6

6 9

21 21 39 23 27 33 59 36 27 28 33 36 37 40 22 18 105 94 89 96 89 115 128 56 51 61 93 99 107 91 87 116 167 164 149 114 178 161 93 3 3 44 82 103 102 104 97 109 160 440 277 257 248 435 122 64 26 67 139 318 258 112 99 206 421 184 111 104 116 427 7

9 19 30 119 263 201 72 45 279 472 1

3 5

13 53 0

0 2

1 0

15 15 2

5 72 52 0

0 0

0 5

0 0

0 0

0 0

1 0

0 4

0 Page 18 of 32

Table 4: PAVAN Input files, Continued Unit 1 Containment Release, Continued:

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

9 5

11 9

1 9 3 1 56 5 2 24 1 4 1 7 22 1 4 12 1 0 1 0 2 1 1 4 1 9 1 4 1 9 40 74 54 43 29 3 3 42 20 1 8 11 1 4 6 1 44 57 48 5 1 154 187 134 1 0 0 80 94 93 55 2 1 28 53 1 9 9 113 163 1 0 4 1 1 8 357 280 220 176 1 9 1 222 263 123 66 77 151 212 75 151 1 2 5 1 5 8 224 1 7 1 111 157 253 366 330 151 5 1 83 225 1 9 1 103 8 1 102 242 1 0 5 1 2 1 61 1 4 9 388 783 489 190 87 219 375 58 24 1 5 1 8 1 4 7 4

1 5 1 3 50 157 213 180 62 40 1 5 5 160 0

1 11 9

1 9 1

0 0

1 0

7 1 0 2

3 1 4 1 0 0

0 0

1 9

1 0

0 0

0 0

0 0

0 0

0 0

0 0

0 3

0 0

0 0

0 0

0 0

0 0

0 11 1 9 28 27 40 68 1 2 8 1 0 0 58 32 3 1 24 36 27 22 20 1 7 20 18 1 6 24 55 149 78 59 50 32 37 32 26 20 28 52 34 33 24 3 1 128 167 110 93 99 9 1 67 53 37 32 38 51 24 24 8

3 5 73 73 49 79 143 155 167 53 24 47 64 7

2 5

1 1 8 9

8 6

6 58 1 1 9 99 26 9

15 13 1

1 0

1 3

0 2

0 0

8 56 31 7

0 8

5 1

0 0

0 0

0 0

0 0

0 1

3 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 160 74 84 7 4 1 5 4 166 254 249 2 6 1 194 1 9 8 1 7 9 253 332 377 206 33 1 3 11 1 3 1 8 44 106 63 9 1 87 90 7 8 83 77 6 1 39 3 1 1 2 3

11 1 5 25 36 23 47 1 4 5 155 75 59 40 38 38 1 0 1

1 3

2 5

2 1

9 82 134 69 5

6 1 3 6

1 0

0 1

0 1

0 0

1 1

1 4 1 0 ' 1 3

0 1

0 0

0 1

0 0

0 0

0 0

0 0

1 0

0 1

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

-1. 0.50 0. 7 5 1. 0 1. 5 2. 0 3. 0 5. 0 7. 0 1 0. 0 1 3. 0 636. 556. 556. 567. 604. 562. 562. 562. 495. 495. 536. 687. 769.2017.1401. 900.

4827.4827.4827.4827.4827.4827.4827.4827.4827.4827.4827.4827.4827.4827.4827.4827.

Page 19 of 32

Table 4: PAVAN Input files, Continued Unit 2 Containment Release:

0100 00001 Surry (new EAB) 1994-98 JFD 9.6 m 9.6 m - 44.9 m Onsite Unit 2 Reactor Release 10 0

960. 35.5 0

0 0

0 9

41 131 64 0

0 0

0 1

0 7

13 35 13 0

0 0

0 0

3 15 29 57 20 0

0 0

6 3

21 105 167 440 184 1

0 0

0 1

7 42 173 89 0

0 0

0 0

0 8

21 35 10 0

0 0

0 1

1 6

33 32 15 0

0 0

4 6

21 94 164 277 111 3

10.

0 0

0 3

8 65 170 58 3

0 0

0 0

10 19 44 11 0

0 0

0 0

1 14 29 40 23 0

0 0

3 7

39 89 149 257 104 c

9. 6 0

0 0

0 18 95 197 95 2

0 0

0 0

- 1 6

20 51 12 0

0 0

0 0

1 19 27 57 13 1

0 0

2 6

23 96 114 248 116 1 3 0

1 0

1 23 163 352 319 24 0

0 0

0 2

19 48 86 53 1

2 0

0 0

2 19 45 83 62 6

1 0

2 5

27 89 178 435 427 0

0 0

2 34 186 379 10 0

0 0

0 1

3 22 47 42 4

0 0

0 0

0 4

28 39 36 0

0 0

0 5

12 33 115 161 122 7

0 0

0 1

50 158 159 3

0 0

0 0

1 6

22 19 9

0 0

0 0

0 0

5 25 19 9

0 0

0 0

8 16 59 12 8 93 64 9

I 3

J I;)

53 0

0 0

1 3

26 35 32 0

0 0

0 0

0 0

10 7

2 3

0 0

0 0

0 6

13 7

4 2

0 0

0 4

12 36 56 33 26 19..

Ground-Level Release 0

1 1

23 35 41 6

1 0

0 0

0

- 2 5

8 9

2 0

0 0

0 2

3 5

6 5

5 0

0 0

4 8

27 51 44 67 30 0

0 1

17 49 128 69 1

0 0

0 0

0 9

20 19 17 0

0 0

0 1

0 9

14 21 13 0

0 0

5 10 28 61 82 139 119 0

0 0

7 38 260 370 20 0

0 0

0 1

9 11 70 62 4

0 0

0 0

3 11 17 61 62 2

0 0

1 15 33 93 103 318 263 0

1 0

13 43 157 156 8

0 0

0 0

0 7

18 32 45 3

0 0

0 1

4 17 11 43 43 8

0 0

3 10 36 99 102 258 201 0

0 0

32 135 229 98 6

0 0

0 0

0 16 34 26 14 2

0 0

0 1

8 19 23 29 16 3

0 0

4 12 37 107 104 112 72 L

1 0

15 15 2

0 0

2 39 174 407 208 1

0 0

0 0

1 21 34 28 9

0 0

0 0

1 5

15 38 26 12 1

0 0

3 6

40 91 97 99 45 0

0 0

18 95 371 300 49 2

0 0

0

~ -0 6

29 37 31 13 1

0 0

1 1

17 28 45 36 8

0 0

4 6

22 87 109 206 279 0

0 0

4 46 149 201 15 1

0 0

0 0

10 19 40 42 3

0 0

0 0

2 20 20 35 52 7

0 0

3 9

18 116 160 421 472 5

72 52 Page 20 of 32

Table 4: PAVAN Input files, Continued Unit 2 Containment Release, Continued:

0 0

0 0

5 0

0 0

0 0

0 1

0 0

4 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

9 5

11 9

19 31 56 52 24 14 17 22 14 12 10 10 21 14 19 14 19 40 74 54 43 29 33 42 20 18 11 14 61 44 57 48 51 154 187 134 100 80 94 93 55 21 28 53 199 113 163 104 118 357 280 220 176 191 222 263 123 66 77 151 212 75 151 125 158 224 171 111 157 253 366 330 151 51 83 225 191 103 81 102 242 105 121 61 149 388 783 489 190 87 219 375 58 24 15 18 147 4

15 13 50 157 213 180 62 40 155 160 0

1 11 9

19 1

0 0

1 0

7 10 2

3 14 10 0

0 0

1 9

1 0

0 0

0 0

0 0

0 0

0 0

0 0

0 3

0 0

0 0

0 0

0 0

0 0

0 11 19 28 27 40 68 128 100 58 32 31 24 36 27 22 20 17 20 18 16 24 55 149 78 59 50 32 37 32 26 20 28 52 34 33 24 31 128 167 110 93 99 91 67 53 37 32 38 51 24 24 8

35 73 73 49 79 143 155 167 53 24 47 64 6

6 58 119 99 26 9

15 13 7

2 5

1 18 9

8 1

1 0

1 3

0 2

0 0

8 56 31 7

0 8

5 1

0 0

0 0

0 0

0 0

0 1

3 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 160 74 84 74 154 166 254 249 261 194 198 179 253 332 377 206 33 13 11 13 18 44 106 63 91 87 90 78 83 77 61 39 31 12 3

11 15 25 36 23 47 145 155 75 59 40 38 38 10 1

1 3

2 5

2 1

9 82 134 69 5

6 13 6

1 0

0 1

0 1

0 0

1 1

14 10 1

3 0

1 0

0 0

1 0

0 0

0 0

0 0

0 1

0 0

1 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0

-1. 0.50 0.75 1.0 1.5 2.0 3.0 5.0 7.0 10.0 13.0 670. 584. 584. 597. 701. 652. 652. 561. 515. 515. 558. 619.1076.1962.1350. 945.

4744.4744.4744.4744.4744.4744.4744.4744.4744.4744.4744.4744.4744.4744.4744.4744.

Page 21 of 32

Table 4: PAVAN Input files, Continued Ventilation Vent No. 2 Release:

0100 00001 Surry (new EAB) 1994-98 J F D 9.6 m 9.6 m - 44.9 m Onsite Vent Release (no plume rise) 10 0

960. 35.5 0

0 0

0 9

41 13 1 64 0

0 0

0 1

0 7

13 35 13 0

0 0

0 0

3 15 29 57 20 0

0 0

6 3

21 105 167 440 184 1

0 0

0 1

7 42 173 89 0

0 0

0 0

0 8

21 35 10 0

0 0

0 1

1 6

33 32 15 0

0 0

4 6

21 94 164 277 111

-l

10.

0 0

0 3

8 65 17 0 58 3

0 0

0 0

0 10 19 44 11 0

0 0

0 0

1 14 29 40 23 0

0 0

3 7

3 9 89 149 257 104 C

9.6 0

0 0

0 18 95 197 95 2

0 0

0 0

1 6

20 51 12 0

0 0

0 0

1 19 27 57 13 1

0 0

2 6

23 96 114 248 116 0

1 0

1 23 163 352 319 24 0

0 0

0 2

19 48 86 53 1

2 0

0 0

2 19 45 83 62 6

1 0

2 5

27 89 178 435 427 0

0 0

2 34 186 379 10 0

0 0

0 1

3 22 47 42 4

0 0

0 0

0 4

28 39 36 0

0 0

0 5

12 33 115 161 122 7

0 0

0 1

50 158 159 3

0 0

0 0

1 6

22 19 9

0 0

0 0

0 0

5 25 19 9

0 0

0 0

8 16 59 128 93 64 9

I

.J J

13 53 0

0 0

1 3

26 35 32 0

0 0

0 0

0 0

10 7

2 3

0 0

0 0

0 6

13 7

4 2

0 0

0 4

12 36 56 33 26 19

?

Ground-Level Release 0

1 1

23 35 41 6

1 0

0 0

0 2

5 8

9 2

0 0

0 0

2 3

5 6

5 5

0 0

0 4

8 27 51 44 67 30 0

0 1

17 49 128 69 1

0 0

0 0

0 9

20 19 17 0

0 0

0 1

0 9

14 21 13 0

0 0

5 10 28 61 82 139 119 0

0 0

7 38 260 370 20 0

0 0

0 1

9 11 70 62 4

0 0

0 0

3 11 17 61 62 2

0 0

1 15 33 93 103 318 263 0

1 0

13 43 157 156 8

0 0

0 0

0 7

18 32 45 3

0 0

0 1

4 17 11 43 43 8

0 0

3 10 36 99 102 258 201 0

0 0

32 135 229 98 6

0 0

0 0

0 16 34 26 14 2

0 0

0 1

8 19 23 29 16 3

0 0

4 12 37 107 104 112 72 n

L 1

0 15 15 L

0 0

2 39 174 407 208 1

0 0

0 0

1 21 34 28 9

0 0

0 0

1 5

15 38 26 12 1

0 0

3 6

40 91 97 99 45 0

0 0

18 95 371 300 49 2

0 0

0 0

6 29 37 31 13 1

0 0

1 1

17 28 45 36 8

0 0

4 6

22 87 109 206 279 0

0 0

4 46 149 201 15 1

0 0

0 0

10 19 40 42 3

0 0

0 0

2 20 20 35 52 7

0 0

3 9

18 116 160 421 472 5

72 52 Page 22 of 32

Table 4: PAVAN Input files, Continued Ventilation Vent No. 2 Release, Continued:

0 0

0 0

5 0

0 0

0 0

0 1

0 0

4 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

9 5

11 9

19 31 56 52 24 14 17 22 14 12 10 10 21 14 19 14 19 40 74 54 43 29 33 42 20 18 11 14 61 44 57 48 51 154 187 134 100 80 94 93 55 21 28 53 199 113 163 104 118 357 280 220 176 191 222 263 123 66 77 151 212 75 151 125 158 224 171 111 157 253 366 330 151 51 83 225 191 103 81 102 242 105 121 61 149 388 783 489 190 87 219 375 58 24 15 18 147 4

15 13 50 157 213 180 62 40 155 160 0

7 10 2

3 14 10 0

1 11 9

19 1

0 0

1 0

0 0

1 9

1 0

0 0

0 0

0 0

0 0

0 0

0 0

0 3

0 0

0 0

0 0

0 0

0 0

0 11 19 28 27 40 68 128 100 58 32 31 24 36 27 22 20 17 20 18 16 24 55 149 78 59 50 32 37 32 26 20 28 52 34 33 24 31 128 167 110 93 99 91 67 53 37 32 38 51 24 24 8

35 73 73 49 79 143 155 167 53 24 47 64 7

2 5

1 18 9

8 6

6 58 119 99 26 9

15 13 1

1 0

1 3

0 2

0 0

8 56 31 7

0 8

5 1

0 0

0 0

0 0

0 0

0 1

3 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 160 74 84 74 154 166 254 249 261 194 198 179 253 332 377 206 33 13 11 13 18 44 106 63 91 87 90 78 83 77 61 39 31 12 3

11 15 25 36 23 47 145 155 75 59 40 38 38 10 1

1 3

2 5

2 1

9 82 134 69 5

6 13 6

1 0

0 1

0 1

0 0

1 1

14 10 1

3 0

1 0

0 0

1 0

0 0

0 0

0 0

0 1

0 0

1 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0

-1. 0.50 0.75 1.0 1.5 2.0 3.0 5.0 7.0 10.0 13.0 650. 569. 569. 582. 677. 628. 628. 572. 517. 517. 561. 641.1087.1995.1354. 923.

4721.4721.4721.4721.4721.4721.4721.4721.4721.4721.4721.4721.4721.4721.4721.4721.

Page 23 of 32

Table 4: PAVAN Input files, Continued Auxiliary Building West Louver Release:

0100 00001 Surry (new EAB) 1994-98 JFD 9.6 m 9.6 m - 44.9 m Onsite Aux Bldg West Louver Release 10 0

960. 35.5 0

0 0

0 9

41 131 64 0

0 0

(3 1

0 7

13 35 13 0

0 0

0 0

3 15 29 57 20 0

0 0

6 3

21 105 167 440 184 0

0 0

1 7

42 173 89 0

0 0

0 0

0 8

21 35 10 0

0 0

0 1

1 6

33 32 15 0

0 0

4 6

21 94 164 277 111 7

10.

0 0

0 3

8 65 17 0 58 3

0 0

0 0

0 10 19 44 11 0

0 0

0 0

1 14 29 40 23 0

0 0

3 7

39 89 149 257 104 9. 6 0

0 0

0 18 95 197 95 2

0 0

0 0

1 6

20 51 12 0

0 0

0 0

1 19 27 57 13 1

0 0

2 6

23 96 114 248 116 0

1 0

1 23 163 352 319 24 0

0 0

0 2

19 48 86 53 1

2 0

0 0

2 19 45 83 62 6

1 0

2 5

27 89 178 435 427 0

0 0

2 34 186 379 10 0

0 0

0 1

3 22 47 42 4

0 0

0 0

0 4

28 39 36 0

0 0

0 5

12 33 115 161 122 7

0 0

0 1

50 158 159 3

0 0

0 0

1 6

22 19 9

0 0

0 0

0 0

5 25 19 9

0 0

0 0

8 16 59 12 8 93 64 9

1 J

5 13 53 0

0 Ground-Level Release 0

1 3

26 35 32 0

0 0

0 0

0 0

10 7

2 3

0 0

0 0

0 6

13 7

4 2

0 0

0 4

12 36 56 33 26 19 0

1 1

23 35 41 6

1 0

0 0

0 2

5 8

9 2

0 0

0 0

2 3

5 6

5 5

0 0

0 4

8 27 51 44 67 30 0

0 1

17 49 128 69 1

0 0

0 0

0 9

20 19 17 0

0 0

0 1

0 9

14 21 13 0

0 0

5 10 28 61 82 139 119 0

0 0

7 38 260 370 20 0

0 0

0 1

9 11 70 62 4

0 0

0 0

3 11 17 61 62 2

0 0

1 15 33 93 103 318 263 0

1 0

13 43 157 156 8

0 0

0 0

0 7

18 32 45 3

0 0

0 1

4 17 11 43 43 8

0 0

3 10 36 99 102 258 201 0

0 0

32 135 229 98 6

0 0

0 0

0 16 34 26 14 2

0 0

0 1

8 19 23 29 16 3

0 0

4 12 37 107 104 112 72

-3 2

1 0

15 15 L

0 0

2 39 174 407 208 1

0 0

0 0

1 21 34 28 9

0 0

0 0

1 5

15 38 26 12 1

0 0

3 6

40 91 97 99 45 0

0 0

18 95 371 300 49 2

0 0

0 0

6 29 37 31 13 1

0 0

1 1

17 28 45 36 8

0 0

4 6

22 87 109 206 279 0

0 0

4 46 149 201 15 1

0 0

0 0

10 19 40 42 3

0 0

0 0

2 20 20 35 52 7

0 0

3 9

18 116 160 421 472 5

72 52 Page 24 of 32

Table 4: PAVAN Input files, Continued Auxiliary Building West Louver Release, Continued:

0 0

9 21 61 199 212 191 58 0

0 0

11 17 52 51 7

1 1

0 0

0 160 33 31 10 1

0 0

0 0

0

-1.

625.

0 0

5 14 44 113 75 103 24 1

0 0

19 20 34 24 2

1 0

0 0

0 74 13 12 1

0 0

0 0

0 0

0 0

5 0

0 0

0 0

0 1

0 0

0 0

0 0

0 0

0 0

0 0

11 9

19 31 56 52 24 14 17 22 14 19 14 19 40 74 54 43 29 33 42 20 57 48 51 154 187 134 100 80 94 93 55 163 104 118 357 280 220 176 191 222 263 123 151 125 158 224 171 111 157 253 366 330 151 81 102 242 105 121 61 149 388 783 489 190 15 18 147 4

15 13 50 157 213 180 62 11 9

19 1

0 0

1 0

7 10 2

0 1

9 1

0 0

0 0

0 0

0 0

0 3

0 0

0 0

0 0

0 0

28 27 40 68 128 100 58 32 31 24 36 18 16 24 55 149 78 59 50 32 37 32 33 24 31 128 167 110 93 99 91 67 53 24 8

35 73 73 49 79 143 155 167 53 5

1 18 9

8 6

6 58 119 99 26 0

1 3

0 2

0 0

8 56 31 7

0 0

0 0

0 0

0 0

1 3

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

84 74 154 166 254 249 261 194 198 179 253 11 13 18 44 106 63 91 87 90 78 83 3

11 15 25 36 23 47 145 155 75 59 1

3 2

5 2

1 9

82 134 69 5

0 1

0 1

0 0

1 1

14 10 1

0 1

0 0

0 0

0 0

0 0

1 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

4 0

0 0

0 12 10 10 18 11 14 21 28 53 66 77 151 51 83 225 87 219 375 40 155 160 3

14 10 0

0 0

0 0

0 27 22 20 26 20 28 37 32 38 24 47 64 9

15 13 0

8 5

0 0

0 0

0 0

0 0

0 0

0 0

332 377 206 77 61 39 40 38 38 6

13 6

3 0

1 0

0 1

0 0

0 0

0 0

0 0

0 0

0 0

0.50 0.75 1.0 1.5 2.0 3.0 5.0 7.0 10.0 13.0 545. 545. 558. 638. 594. 594. 589. 523. 523. 567. 679.1113.2005.1358. 885.

4793.4793.4793.4793.4793.4793.4793.4793.4793.4793.4793.4793-4793.4793.4793.4793.

Page 25 of 32

Table 4: PAVAN Input files, Continued Auxiliary Building East Louver Release:

0100 00001 Surry (new EAB) 1994-98 JFD 9.6 m 9.6 m - 44.9 rn Onsite Aux Bldg East Louver Release 10 0

960. 35.5 0

0 0

0 9

41 13 1 64 0

0 0

0 1

0 7

13 35 13 0

0 0

0 0

3 15 29 57 20 0

0 0

6 3

21 105 167 440 184 0

0 0

1 7

42 173 89 0

0 0

0 0

0 8

21 35 10 0

0 0

0 1

1 6

33 32 15 0

0 0

4 6

21 94 164 277 111

10.

0 0

0 3

8 65 170 58 3

0 0

0 0

0 10 19 44 11 0

0 0

0 0

1 14 29 40 23 0

0 0

3 7

39 89 149 257 104 E

9.6 0

0 0

0 18 95 197 95 2

0 0

0 0

1 6

20 51 12 0

0 0

0 0

1 19 27 57 13 1

0 0

2 6

23 96 114 248 116 0

1 0

1 23 163 3 52 319 24 0

0 0

0 2

19 48 86 53 1

2 0

0 0

2 19 45 83 62 6

1 0

2 5

27 89 178 43 5 427 0

0 0

2 34 186 379 10 0

0 0

0 1

3 22 47 42 4

0 0

0 0

0 4

28 39 36 0

0 0

0 5

12 33 115 161 122 7

0 0

0 1

50 158 159 3

0 0

0 0

1 6

22 19 9

0 0

0 0

0 0

5 25 19 9

0 0

0 0

8 16 59 128 93 64 9

1 J

13 53 0

0 Ground-Level Release 0

1 3

26 35 32 0

0 0

0 0

0 0

10 7

2 3

0 0

0 0

0 6

13 7

4 2

0 0

0 4

12 36 56 33 26 19 0

1 1

23 35 41 6

1 0

0 0

0 2

5 8

9 2

0 0

0 0

2 3

5 6

5 5

0 0

0 4

8 27 51 44 67 30 0

0 1

17 49 128 69 1

0 0

0 0

0 9

20 19 17 0

0 0

0 1

0 9

14 21 13 0

0 0

5 10 28 61 82 139 119 0

0 0

7 38 260 370 20 0

0 0

0 1

9 11 70 62 4

0 0

0 0

3 11 17 61 62 2

0 0

1 15 33 93 103 318 263 0

1 0

13 43 157 156 8

0 0

0 0

0 7

18 32 45 3

0 0

0 1

4 17 11 43 43 8

0 0

3 10 36 99 102 258 201 0

0 0

32 135 229 98 6

0 0

0 0

0 16 34 26 14 2

0 0

0 1

8 19 23 29 16 3

0 0

4 12 37 1 0 7 104 112 72 2

1 0

15 15 L

0 0

2 39 174 407 208 1

0 0

0 0

1 21 34 28 9

0 0

0 0

1 5

15 38 26 12 1

0 0

3 6

40 91 97 99 45 C

0 0

0 18 95 371 300 49 2

0 0

0 0

6 29 37 31 13 1

0 0

1 1

17 28 45 36 8

0 0

4 6

22 87 109 206 279 0

0 0

4 46 149 201 15 1

0 0

0 0

10 19 40 42 3

0 0

0 0

2 20 20 35 52 7

0 0

3 9

18 116 160 421 472 2

72 52 Page 26 of 32

Table 4: PAVAN Input files, Continued Auxiliary Building East Louver Release, Continued:

0 0

0 0

5 0

0 0

0 0

0 1

0 0

4 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

9 5

11 9

19 31 56 52 24 14 17 22 14 12 10 21 14 19 14 19 40 74 54 43 29 33 42 20 18 11 61 44 57 48 51 154 187 134 100 80 94 93 55 21 28 199 113 163 104 118 357 280 220 176 191 222 263 123 66 77 212 75 151 125 158 224 171 111 157 253 366 330 151 51 83 191 103 81 102 242 105 121 61 149 388 783 489 190 87 219 58 24 15 18 147 4

15 13 50 157 213 180 62 40 155 0

1 11 9

19 1

0 0

1 0

7 10 2

3 14 0

0 0

1 9

1 0

0 0

0 0

0 0

0 0

0 0

0 0

3 0

0 0

0 0

0 0

0 0

0 11 19 28 27 40 68 128 100 58 32 31 24 36 27 22 17 20 18 16 24 55 149 78 59 50 32 37 32 26 20 52 34 33 24 31 128 167 110 93 99 91 67 53 37 32 51 24 24 8

35 73 73 49 79 143 155 167 53 24 47 7

2 5

1 18 9

8 6

6 58 119 99 26 9

15 1

1 0

1 3

0 2

0 0

8 56 31 7

0 8

1 0

0 0

0 0

0 0

0 0

1 3

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

160 74 84 74 154 166 254 249 261 194 198 179 253 332 377 33 13 11 13 18 44 106 63 91 87 90 78 83 77 61 31 12 3

11 15 25 36 23 47 145 155 75 59 40 38 10 1

1 3

2 5

2 1

9 82 134 69 5

6 13 1

0 0

1 0

1 0

0 1

1 14 10 1

3 0

0 0

0 1

0 0

0 0

0 0

0 0

1 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0

-1. 0.50 0.75 1.0 1.5 2.0 3.0 5.0 7.0 10.0 13.0 636. 554. 554. 567. 674. 627. 627. 590. 530. 530. 577. 653.1112.1982.1347.

4765.4765.4765.4765.4765.4765.4765.4765.4765.4765.4765.4765.4765.4765.4765.

0 0

10 14 53 151 225 375 160 10 0

0 20 28 38 64 13 5

0 0

0 0

206 39 38 6

1 1

0 0

0 0

901.

4765.

Page 27 of 32

Table 5: PAVAN output PAVAN Output - WQ values at the EAB (Unit 1 Reactor Release, 1994-1998) lUSNRC COMPUTER CODE-PAVAN, VERSION 2.0 RUN DATE:12/20/2001

/PLANT NAME: Surry (new EAB)

METEOROLOGICAL INSTRUMENTATION DATA PERIOD: 1994-98 JFD WIND SENSORS HEIGHT:

9.6 m TYPE OF RELEASE: Ground-Level Release DELTA-T HEIGHTS: 9.6 m - 44.9 m SOURCE OF DATA: Onsite COMMENTS: Unit 1 Reactor Release PROGRAM: PAVAN, 10/76, 8/79 REVISION, IMPLEMENTATION OF REGULATORY GUIDE 1.145 0

RELATIVE CONCENTRATION (X/Q) VALUES (SEC/CUBIC METER)

VERSUS AVERAGING TIME DOWNWIND DISTANCE SECTOR S

s sw sw wsw W

WNW Nw NNW N

NNE NE ENE E

ESE SE SSE MAX X / Q (METERS) 636.

556.

556.

567.

604.

562.

562.

562.

495.

495.

536.

687.

769.

2017.

1401.

900.

0-2 HOURS 6.24E-04 3.19E-04 3.6OE-04 2.993-04 6.90E-04 9.833-04 1.34E-03 1.36E-03 1.793-03 1.39E-03 1.233-03 7.29E-04 8.41E-04 5.95E-04 1.26E-03 5.56E-04 1.79E-03 0-8 HOURS 4.19E-04 2.263-04 2.55E-04 2.13E-04 4.643-04 6.643-04 9.18E-04 9.00E-04 1.17E-03 9.40E-04 8.51E-04 4.963-04 5.38E-04 2.88E-04 6.36E-04 3.55E-04 SRP 2.3.4 495.

1.56E-02 7.12E-03 SITE LIMIT 2.20E-04 2.03E-04 00.5 PERCENT X/Q TO AN INDIVIDUAL IS LIMITING.

O**NOTE**: VALUES ON THIS PAGE ARE APPROXIMATIONS ONLY CHECK THE REASONABLENESS OF THE ENVELOPES COMPUTED FOR THE 0-2 HOUR VALUES. FOR ANY FAULTY ENVELOPES, ADJUST THE ABOVE VALUES.

8-24 HOURS 3.43E-04 1.90E-04 2.15E-04 1.80E-04 3.80E-04 5.463-04 7.60E-04 7.31E-04 9.44E-94 7.74E-04 7.07E-04 4.10E-04 4.30E-04 2.01E-04 4.52E-04 2.843-04 1-4 DAYS 2.23E-04 1.31E-04 1.48E-04 1.25E-04 2.473-04 3.573-04 5.05E-04 4.66E-04 5.94E-04 5.08E-04 4.74E-04 2.70E-04 2.653-04 9.14E-05 2.16E-04 1.75E-04 4.81E-03 2.06E-03 1.95E-04 1.79E-04 HOURS PER YEAR MAX 0-2 HR X/Q IS EXCEEDED 4-30 DAYS ANNUAL AVERAGE IN SECTOR 1.20E-04 5.60E-05 7.623-05 3.94E-05 8.693-05 4.523-05 3.883-05 7.383-05 1.33E-04 6.22E-05 1.94E-04 9.18E-05 1.37E-04 2.81E-04 2.44E-04 1.11E-04 1.363-04 3.06E-04 2.77E-04 1.323-04 2.663-04 1.31E-04 1.48E-04 7.12E-05 1.32E-04 5.62E-05 2.96E-05 7.433-06 7.473-05 2.04E-05 8.70E-05 3.71E-05 TOTAL HOURS AROUND SITE:

6.08E-04 1.37E-04 1.37E-04 1.593-04 21.8 10.9 12.1 9.8 20.9 20.3 26.8 30.8 43.7 31.3 26.4 15.5 20.3 22.o 36.7 20.7 370.0 DOWNWIND SECTOR S

ssw sw wsw W

WNW Nw NNW N

"E NE ENE E

ESE SE SSE Page 28 of 32

PAVAN Output - WQ values at the EAB (Unit 2 Reactor Release, 1994-1998) lUSNRC COMPUTER CODE-PAVAN, VERSION 2.0 RUN DATE:12/20/2001

/PLANT NAME: Surry (new EAB)

METEOROLOGICAL INSTRUMENTATION DATA PERIOD: 1994-98 JFD WIND SENSORS HEIGHT:

9.6 m TYPE OF RELEASE: Ground-Level Release DELTA-T HEIGHTS: 9.6 m - 44.9 m SOURCE OF DATA: Onsite COMMENTS: Unit 2 Reactor Release PROGRAM: PAVAN, 10/76, 8/79 REVISION, IMPLEMENTATION OF REGULATORY GUIDE 1.145 0

RELATIVE CONCENTRATION (X/Q) VALUES (SEC/CUBIC METER)

DOWNWIND DISTANCE SECTOR (METERS

)

S 670.

ssw 584.

sw 584.

wsw 597.

W 701.

WNW 652.

Nw 652.

NNW 561.

N 515.

NNE 515.

m 558.

ENE 619.

E 1076.

ESE 1962.

SE 1350.

SSE 945.

MAX X/Q 0-2 HOURS 5.72E-04 2.94E-04 3.32E-04 2.74E-04 5.39E-04 7.65E-04 1.04E-03 1.373-03 1.67E-03 1.301'3-03 1.15E-03 8.70E-04 5.80E-04 6.05E-04 1.28E-03 5.30E-04 1.67E-03 0-8 HOURS 3.83E-04 2.08E-04 2.353-04 1.963-04 3.61E-04 5.16E-04 7.llE-04 9.02E-04 1.09E-03 8.79E-04 7.94E-04 5.933-04 3.56E-04 2.953-04 6.58E-04 3.37E-04 SRP 2.3.4 515.

1.46E-02 6.64E-03 SITE LIMIT 2.23E-04 2.03E-04 00.5 PERCENT X/Q TO AN INDIVIDUAL IS LIMITING.

O**NOTE**: VALUES ON THIS PAGE ARE APPROXIMATIONS ONLY CHECK THE REASONABLENESS OF THE ENVELOPES COMPUTED FOR THE 0-2 HOUR VALUES. FOR ANY FAULTY ENVELOPES, ADJUST THE ABOVE VALUES.

VERSUS AVERAGING TIME 8-24 HOURS 3.14E-04 1.75E-04 1.98E-04 1.65E-04 2.953-04 4.24E-04 5.883-04 7.33E-04 8.823-04 7.23E-04 6.60E-04 4.89E-04 2.79E-04 2.06E-04 4.71E-04 2.68E-04 1-4 DAYS 2.04E-04 1.20E-04 1.36.~-04 1.14E-04 1.91E-04 2.763-04 3.90E-04 4.683-04 5.55E-04 4.74E-04 4.423-04 3.23E-04 1.653-04 9.49E-05 2.28E-04 1.64E-04 4.49E-03 1.91E-03 1.93E-04 1.75E-04 HOURS PER YEAR MAX 0-2 HR X/Q IS EXCEEDED 1.09E-04 5.10E-05 21.5 6.99E-05 3.61E-05 10.7 7.983-05 4.14E-05 11.9 6.743-05 3.533-05 9.5 1.02E-04 4,76E-05 17.8 1.49E-04 7.04E-05 15.7 19.1 1.05E-04 2.16E-04 33.8 2.45E-04 1.llE-04 2.85E-04 1,26E-04 43.7 2.583-04 1.233-04 31.3 26.4 2.483-04 1.223-04 20.9 8.573-05 1.783-04 7.70E-05 3.04E-05 14.6 3.llE-05 7.933-06 23.1 38.3 8.04E-05 2.25E-05 8.08E-05 3.40E-05 21.1 TOTAL HOURS AROUND SITE:

359.6 4-30 DAYS ANNUAL AVERAGE IN SECTOR 1.26E-04 1.26E-04 5.633-04 1.51E-04 DOWNWIND SECTOR S

ssw sw wsw W

WNW Nw NNW N

NNE NE ENE E

ESE SE SSE Page 29 of 32

PAVAN Output - X/Q values at the EAB (Ventilation Vent No. 2 Release, 1994-1998) lUSNRC COMPUTER CODE-PAVAN, VERSION 2.0 RUN DATE:12/20/2001

/PLANT NAME: Surry (new EAB)

METEOROLOGICAL INSTRUMENTATION DATA PERIOD: 1994-98 JFD WIND SENSORS HEIGHT:

9.6 m TYPE OF RELEASE: Ground-Level Release DELTA-T HEIGHTS: 9.6 rn - 44.9 rn SOURCE OF DATA: Onsite COMMENTS: Vent Release (no plume rise)

PROGRAM: PAVAN, 10/76, 8/79 REVISION, IMPLEMENTATION OF REGULATORY GUIDE 1.145 0

RELATIVE CONCENTRATION (X/Q) VALUES (SEC/CUBIC METER)

DOWNWIND DISTANCE SECTOR (METERS

)

S 650.

ssw 569.

sw 569.

wsw 582.

W 677.

WNW 628.

Nw 628.

NNW 572.

N 517.

NNE 517.

NE 561.

ENE 641.

E 1087.

ESE 1995.

SE 1354.

SSE 923.

MAX X/Q 0-2 HOURS 6.02E-04 3.07E-04 3.46E-04 2.86E-04 5.71E-04 8.15E-04 1.llE-03 1.32E-03 1.66E-03 1.29E-03 1.14E-03 8.20E-04 5 -753-04 5.99E-04 1.28E-03 5.43E-04 1.66E-03 0-8 HOURS 4.04E-04 2.17E-04 2.463-04 2.04E-04 3.833-04 5.50E-04 7.593-04 8.73E-04 1.08E-03 8.733-04 7.87E-04 5.59E-04 3.533-04 2.91E-04 6.56E-04 3.463-04 SRP 2.3.4 517.

1.453-02 6.60E-03 SITE LIMIT 2.24E-04 2.03E-04 00.5 PERCENT X/Q TO AN INDIVIDUAL IS LIMITING.

O**NOTE**: VALUES ON THIS PAGE ARE APPROXIMATIONS ONLY CHECK THE REASONABLENESS OF THE ENVELOPES COMPUTED FOR THE 0-2 HOUR VALUES. FOR ANY FAULTY ENVELOPES, ADJUST THE ABOVE VALUES.

VERSUS AVERAGING TIME 8-24 HOURS 3.31E-04 1.833-04 2.07E-04 1.72E-04 3.13E-04 4.52E-04 6.283-04 7.09E-04 8.763-04 7.18E-04 6.54E-04 4.61E-04 2.763-04 2.03E-04 4.69E-04 2.763-04 1-4 DAYS 2.15E-04 1.253-04 1.433-04 1.19E-04 2.03E-04 2.953-04 4.16E-04 4.52E-04 5.51E-04 4.71E-04 4.37E-04 3.04E-04 1.623-04 9.28E-05 2.27E-04 1.69E-04 4.463-03 1.90E-03 1.94E-04 1.75E-04 HOURS PER YEAR MAX EXCEEDED 4-30 DAYS ANNUAL AVERAGE IN SECTOR 1.15E-04 5.39E-05 22.4 7.32E-05 3.78E-05 11.2 8.353-05 4.34E-05 12.5 7.05E-05 3.70E-05 10.1 1.09E-04 5.07E-05 18.9 1.593-04 7.533-05 17.4 2.31E-04 1.12E-04 21.8 2.37E-04 1.07E-04 32.7 2.83E-04 1.25E-04 43.7 2.56E-04 1.223-04 31.3 2.463-04 1.21E-04 26.3 1.673-04 8.05E-05 19.6 7.593-05 2.993-05 14.6 3.02E-05 7.63E-06 23.1 38.4 8.38E-05 3.55E-05 21.5 TOTAL HOURS AROUND SITE :

365.4 0-2 HR X/Q IS 7.99E-05 2.233-05 5.60E-04 1.25E-04 1.50E-04 1.25E-04 DOWNWIND SECTOR S

ssw sw wsw W

WNW Nw NNW N

"E NE ENE E

ESE SE SSE Page 30 of 32

PAVAN Output - X/Q values at the EAB (West Auxiliary Building Louver Release, 1994-1998) 1USNRC COMPUTER CODE-PAVAN, VERSION 2.0 RUN DATE:12/20/2001

/PLANT NAME: Surry (new EAB)

METEOROLOGICAL INSTRUMENTATION DATA PERIOD: 1994-98 JFD WIND SENSORS HEIGHT:

9.6 m SOURCE OF DATA: Onsite COMMENTS: Aux Bldg West Louver Release PROGRAM: PAVAN, 10/76, 8/79 REVISION, IMPLEMENTATION OF REGULATORY GUIDE 1.145 TYPE OF RELEASE: Ground-Level Release DELTA-T HEIGHTS: 9.6 m - 44.9 m 0

RELATIVE CONCENTRATION (X/Q) VALUES (SEC/CUBIC METER)

DOWNWIND DISTANCE SECTOR (METERS)

S 625.

ssw 545.

sw 545.

wsw 558.

W 638.

WNW 594.

Nw 594.

NNW 589.

N 523.

NNE 523.

NE 567.

ENE 679.

E 1113.

ESE 2005.

SE 1358.

SSE 885.

MAX X/Q 0-2 HOURS 6.43E-04 3.30E-04 3.72E-04 3.07E-04 6.30E-04 8.96E-04 1.223-03 1.263-03 1.63E-03 1.26E-03 1.12E-03 7.443-04 5.62E-04 5.97E-04 1.28E-03 5.65E-04 1.633-03 0-8 HOURS 4.323-04 2.333-04 2.643-04 2.19E-04 4.233-04 6.05E-04 8.35E-04 8.30E-04 1.06E-03 8.563-04 7.73E-04 5.06E-04 3.443-04 2.90E-04 6.543-04 3 -623-04 SRP 2.3.4 523.

1.42E-02 6.473-03 SITE LIMIT 2.21E-04 2.OlE-04 00.5 PERCENT X/Q TO AN INDIVIDUAL IS LIMITING.

O**NOTE**: VALUES ON THIS PAGE ARE APPROXIMATIONS ONLY CHECK THE REASONABLENESS OF THE ENVELOPES COMPUTED FOR THE 0-2 HOUR VALUES. FOR ANY FAULTY ENVELOPES, ADJUST THE ABOVE VALUES.

VERSUS AVERAGING TIME 8-24 HOURS 3.54E-04 1.96E-04 2.23E-04 1.853-04 3.463-04 4.97E-04 6.91E-04 6.743-04 8.58E-04 7.04E-04 6.42E-04 4.18E-04 2.69E-04 2.02E-04 4.683-04 2.90E-04 1-4 DAYS 2.30E-04 1.35E-04 1.543-04 1.28E-04 2.253-04 3.243-04 4.59E-04 4.30E-04 5.40E-04 4.61E-04 4.293-04 2.75E-04 1.58E-04 9.21E-05 2.263-04 1.793-04 4.383-03 1.873-03 1.91E-04 1.72E-04 HOURS PER YEAR MAX 0-2 HR X/Q IS EXCEEDED 4-30 DAYS ANNUAL AVERAGE IN SECTOR 1.233-04 5.78E-05 23.7 7.893-05 4.09E-05 12.2 9.00E-05 4.683-05 13.6 7.593-05 3.993-05 11.1 1.21E-04 5.643-05 20.9 1.76E-04 8.313-05 20.3 2.543-04 1.243-04 26.7 2.253-04 1.02E-04 31.4 2.773-04 1.23E-04 43.7 2.51E-04 1.20E-04 31.3 2.41E-04 1.19E-04 26.4 1.51E-04 7.27E-05 17.8 7.32E-05 2.87E-05 14.7 2.99E-05 7.543-06 23.4 7.94E-05 2.21E-05 38.8 8.93E-05 3.823-05 22.3 TOTAL HOURS AROUND SITE:

378.3 5.51E-04 1.24E-04 1.493-04 1.24E-04 DOWNWIND SECTOR S

ssw sw wsw W

WNW Nw NNW N

NNE NE ENE E

ESE SE SSE Page 31 of 32

PAVAN Output - X/Q values at the EAB (East Auxiliary Building Louver Release, 1982-1 986) lUSNRC COMPUTER CODE-PAVAN, VERSION 2.0 RUN DATE:12/20/2001

/PLANT NAME: Surry (new EAB)

METEOROLOGICAL INSTRUMENTATION DATA PERIOD: 1994-98 JFD WIND SENSORS HEIGHT:

9.6 m TYPE OF RELEASE: Ground-Level Release DELTA-T HEIGHTS: 9.6 m - 44.9 m SOURCE OF DATA: Onsite COMMENTS: Aux Bldg East Louver Release PROGRAM: PAVAN, 10/76, 8/79 REVISION, IMPLEMENTATION OF REGULATORY GUIDE 1.145 0

RELATIVE CONCENTRATION (X/Q) VALUES (SEC/CUBIC METER)

DOWNWIND DISTANCE SECTOR (METERS)

S 636.

ssw 554.

sw 554.

wsw 567.

W 674.

WNW 627.

Nw 627.

"w 590.

N 530.

NNE 530.

NE 577.

ENE 653.

E 1112.

ESE 1982.

SE 1347.

SSE 901.

MAX X/Q 0-2 HOURS 6.24E-04 3.21E-04 3.62E-04 2.99E-04 5.753-04 8.18E-04 1.llE-03 1.253-03 1.59E-03 1.24E-03 1.09E-03 7.943-04 5.633-04 6.01E-04 1.29E-03 5.553-04 1.59E-03 0-8 HOURS 4.19E-04 2.27E-04 2.573-04 2.13E-04 3.86E-04 5.51E-04 7.61E-04 8.273-04 1.04E-03 8.363-04 7.50E-04 5.41E-04 3.44E-04 2.933-04 6.593-04 3.55E-04 SRP 2.3.4 530.

1.39E-02 6.323-03 SITE LIMIT 2.22E-04 2.00E-04 00.5 PERCENT X/Q TO AN INDIVIDUAL IS LIMITING.

O**NOTE"*: VALUES ON THIS PAGE ARE APPROXIMATIONS ONLY CHECK THE REASONABLENESS OF THE ENVELOPES COMPUTED FOR THE 0-2 HOUR VALUES. FOR ANY FAULTY ENVELOPES, ADJUST THE ABOVE VALUES.

8-24 HOURS 3.43E-04 1.91E-04 2.17E-04 1.80E-04 3.16E-04 4.533-04 6.30E-04 6.723-04 8.39E-04 6.883-04 6.233-04 4.473-04 2.69E-04 2.04E-04 4.723-04 2.843-04 4.27E-03 1.90E-04 VERSUS AVERAGING TIME 1-4 DAYS 2.23E-04 1.31E-04 1.493-04 1.253-04 2.04E-04 2.95E-04 4.17E-04 4.283-04 5.273-04 4.51E-04 4.17E-04 2.95E-04 1.583-04 9.36E-05 2.293-04 1.75E-04 1.82E-03 1.71E-04 HOURS PER YEAR MAX 0-2 HR X/Q IS EXCEEDED DOWNWIND 4-30 DAYS ANNUAL AVERAGE IN SECTOR SECTOR 1.20E-04 5.60E-05 7.673-05 3.973-05 8.75E-05 4.55E-05 3.88E-05 7.38E-05 1.10E-04 5.llE-05 1.60E-04 7.55E-05 1.12E-04 2.31E-04 1.323-04 2.24E-04 2.71E-04 1.20E-04 2.46E-04 1.17E-04 2.343-04 1.15E-04 1.62E-04 7.79E-05 7.333-05 2.873-05 3.05E-05 7.743-06 2.263-05 8.07E-05 8.69E-05 3.70E-05 TOTAL HOURS AROUND SITE:

5.36E-04 1.20E-04 1.46E-04 1.20E-04 23.6 12.1 13.6 11.1 19.7 18.5 23.6 32.2 43.7 31.3 26.1 19.9 15.1 23.8 39.3 22.4 375. a S

ssw sw wsw W

WNW Nw NNW N

NNE NE ENE E

ESE SE SSE Page 32 of 32

ATTACHMENT 2 Marked-up Technical Specifications Page Virginia Electric and Power Company (Dominion)

Surry Power Station Units 1 and 2

TS 5.1-1 5.0 DESIGN FEATURES 5.1 SITE Applicability Applies to the location and boundaries of the site for the Surry Power Station.

Obiective To define those aspects of the site which will affect the overall safety of the installation.

Specification The Surry Power Station is located in Surry County, Virginia, on property owned by Virginia Electric and Power Company on a point of land called Gravel Neck which juts into the James River. It is approximately 46 miles SE of Richmond, Virginia, 17 miles NW of Newport News, Virginia, and 25 miles N W of Norfolk, References FSAR section 2.0 Site FSAR Section 2.1 General Description t

Amendment No.-

ATTACHMENT 3 Proposed Technical Specifications Page Virginia Electric and Power Company (Dominion)

Surry Power Station Units 1 and 2

TS 5.1-1 5.0 DESIGN FEATURES 5.1 SITE Applicability Applies to the location and boundaries of the site for the Surry Power Station.

Obiective To define those aspects of the site which will affect the overall safety of the installation.

Specification The Surry Power Station is located in Surry County, Virginia, on property owned by Virginia Electric and Power Company on a point of land called Gravel Neck which juts into the James River. It is approximately 46 miles SE of Richmond, Virginia, 17 miles NW of Newport News, Virginia, and 25 miles NW of Norfolk, Virginia. The site exclusion area boundary is defined by the site boundary line shown on the site map in TS Figure 5.1-1. The minimum distance from a reactor centerline to the site exclusion area boundary as defined in 10 CFR 100 is 1,650 ft. This is the distance for Unit 1, which is controlling.

References FSAR section 2.0 Site FSAR Section 2.1 General Description Amendment Nos.