VIRGINIA ELECTRIC AND POWER COMPANY
- RICHMOND, VIRGINIA 23261 October 22,2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Serial No.
04-647A NL&OS/ETS RO Docket No. 50-281 License No. DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
SURRY POWER STATION UNIT 2 WITHDRAWAL OF PROPOSED EMERGENCY TECHNICAL SPECIFICATION CHANGE FOR ONE TIME EXTENSION OF THE COMPLETION TIME FOR THE LOW HEAD SAFETY INJECTION (LHSI) TRAIN B In an October 20, 2004 letter (Serial No.04-647), Dominion requested an emergency amendment of the Facility Operating License, in the form of changes to the Technical Specifications to Facility Operating License Number DPR-37 for Surry Power Station Unit 2. Surry Unit 2 entered the 72-hours Allowed Outage Time of TS 3.3.B.3 at 1157 hours0.0134 days <br />0.321 hours <br />0.00191 weeks <br />4.402385e-4 months <br /> on October 19, 2004. The proposed change requested a revision to Technical Specification (TS) 3.3.B.3 to permit a one-time 7-day Allowed Outage Time to complete the repair of a leak on the B Low Head Safety Injection pump seal package which had rendered the pump inoperable. However, maintenance activities for repair of the pump seal package were completed and the B Low Head Safety Injection Pump was returned to service at 0638 hours0.00738 days <br />0.177 hours <br />0.00105 weeks <br />2.42759e-4 months <br /> on October, 22, 2004.
Therefore, Dominion is withdrawing the proposed emergency Technical Specification change.
If you have any further questions or require additional information, please contact Mr.
Thomas Shaub at (804) 273-2763.
Very truly yours, Leslie N. Hartz Vice President - Nuclear Engineering Commitments made in this letter: None
Serial No. 04-647A Docket No. 50-281 Withdrawal of Emergency TS Change - TS 3.5.2 Page 2 of 2 cc:
U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 231185 Atlanta, Georgia 30303 Commissioner Bureau of Radiological Health 1500 East Main Street Suite 240 Richmond, VA 23218 Mr. N. P. Garrett NRC Senior Resident Inspector Surry Power Station Mr. S. R. Monarque NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11 555 Rockville Pike Mail Stop 8-HI2 Rockville, MD 20852