Units, 1 and 2, Issuance of Amendments 261 and 261 Regarding the Revision to Various Setting Limits and the Overtemperature T/Overpower T Time Constants Tac Nos. MD6812 and MD6813)
ML082250013
Person / Time
Site: Surry  
Issue date: 09/17/2008
From: Siva Lingam
NRC/NRR/ADRO/DORL/LPLII-1
To: Christian D
Virginia Electric & Power Co (VEPCO)
Lingam, Siva NRR/DORL 415-1564
Shared Package
ML082250008 List:
References
TAC MD6812, TAC MD6813
Download: ML082250013 (45)


Text

September 17, 2008 Mr. David A. Christian President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

SURRY POWER STATION, UNIT NOS. 1 AND 2, ISSUANCE OF AMENDMENTS REGARDING THE REVISION TO VARIOUS SETTING LIMITS AND THE OVERTEMPERATURE T/OVERPOWER T TIME CONSTANTS (TAC NOS.

MD6812 AND MD6813)

Dear Mr. Christian:

The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 261 to Renewed Facility Operating License No. DPR-32 and Amendment No. 261 to Renewed Facility Operating License No. DPR-37 for the Surry Power Station, Unit Nos. 1 and 2 (Surry 1 and 2),

respectively. The amendments change the Technical Specifications (TSs) in response to your application dated September 19, 2007, as supplemented by letter dated April 11, 2008.

These amendments revise various TS setting limits and the overtemperature T/overpower T time constants in TS 2.3 and TS 3.7 for Surry 1 and 2.

A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.

Sincerely,

/RA/

Siva P. Lingam, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281

Enclosures:

1. Amendment No. 261 to DPR-32
2. Amendment No. 261 to DPR-37
3. Safety Evaluation cc w/encls: See next page

September 17, 2008 Mr. David A. Christian President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

SURRY POWER STATION, UNIT NOS. 1 AND 2, ISSUANCE OF AMENDMENTS REGARDING THE REVISION TO VARIOUS SETTING LIMITS AND THE OVERTEMPERATURE T/OVERPOWER T TIME CONSTANTS (TAC NOS.

MD6812 AND MD6813)

Dear Mr. Christian:

The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 261 to Renewed Facility Operating License No. DPR-32 and Amendment No. 261 to Renewed Facility Operating License No. DPR-37 for the Surry Power Station, Unit Nos. 1 and 2 (Surry 1 and 2),

respectively. The amendments change the Technical Specifications (TSs) in response to your application dated September 19, 2007, as supplemented by letter dated April 11, 2008.

These amendments revise various TS setting limits and the overtemperature T/overpower T time constants in TS 2.3 and TS 3.7 for Surry 1 and 2.

A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.

Sincerely,

/RA/

Siva P. Lingam, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281

Enclosures:

1. Amendment No. 261to DPR-32
2. Amendment No. 261 to DPR-37
3. Safety Evaluation cc w/encls: See next page DISTRIBUTION: Public RidsNrrLAMO=Brien (hard copy)

RidsNrrDirsItsb (RElliott)

LPL2-1 R/F RidsOgcRp RidsRgn2MailCenter (MBates)

RidsNrrDorlLpl2-1 (MWong)

RidsAcrsAcnwMailCenter RidsNrrDorlDpr RidsNrrPMSLingam (hard copy)

GHill (4 hard copies)

RidsNrrDeEicb (WKemper)

RidsNrrDeEicb (HGarg)

RidsNrrDssSrxb (GCranston)

RidsNrrDssSrxb (SMiranda)

RidsNrrDirsItsb (CSchulten)

Package No.: ML082250008 Amendment No.: ML082250013 Tech Spec No.: ML082250026 **concurred by telephone *transmitted by memo dated OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA DE/EICB/BC DIRS/ITSB/BC DSS/SRXB/BC OGC w/ comments NRR/LPL2-1/BC NAME SLingam MO=Brien WKemper RElliott GCranston JBielecki MWong DATE 08/08/08 08/14/08**

8/6/08*

08/18/08 09/15/08 08/25/08 09/15/08 OFFICIAL RECORD COPY

VIRGINIA ELECTRIC AND POWER COMPANY DOCKET NO. 50-280 SURRY POWER STATION, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 261 Renewed License No. DPR-32

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Virginia Electric and Power Company (the licensee) dated September 19, 2007, as supplemented by letter dated April 11, 2008, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Renewed Facility Operating License No. DPR-32 is hereby amended to read as follows:

(B)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 261, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 60 days.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA Melanie C. Wong, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to License No. DPR-32 and the Technical Specifications Date of Issuance: September 17, 2008

VIRGINIA ELECTRIC AND POWER COMPANY DOCKET NO. 50-281 SURRY POWER STATION, UNIT NO. 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 261 Renewed License No. DPR-37

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Virginia Electric and Power Company (the licensee) dated September 19, 2007, as supplemented by letter dated April 11, 2008, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Renewed Facility Operating License No. DPR-37 is hereby amended to read as follows:

(B)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 261, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 60 days.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Melanie C. Wong, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes License No. DPR-37 and the Technical Specifications Date of Issuance September 17, 2008

Page 1 of 2 ATTACHMENT TO LICENSE AMENDMENT NO. 261 RENEWED FACILITY OPERATING LICENSE NO. DPR-32 DOCKET NO. 50-280 AND TO LICENSE AMENDMENT NO. 261 RENEWED FACILITY OPERATING LICENSE NO. DPR-37 DOCKET NO. 50-281 Replace the following pages of the Licenses and the Appendix A Technical Specifications (TSs) with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Pages Insert Pages License License License No. DPR-32, page 3 License No. DPR-32, page 3 License No. DPR-37, page 3 License No. DPR-37, page 3 TSs TSs 2.2-2 2.2-2 2.3-1 2.3-1 2.3-2 2.3-2 2.3-3 2.3-3 2.3-4 2.3-4 2.3-5 2.3-5 2.3-6 2.3-6 2.3-7 2.3-7 2.3-8 2.3-8 2.3-9 3.1-2 3.1-2 3.1-4a 3.1-4a 3.7-4 3.7-4 3.7-6 3.7-6 3.7-7 3.7-7 3.7-7a 3.7-10 3.7-10 3.7-11 3.7-11 3.7-12 3.7-12 3.7-14 3.7-14

Page 2 of 2 ATTACHMENT TO LICENSE AMENDMENT NO. 261 RENEWED FACILITY OPERATING LICENSE NO. DPR-32 DOCKET NO. 50-280 AND TO LICENSE AMENDMENT NO. 261 RENEWED FACILITY OPERATING LICENSE NO. DPR-37 DOCKET NO. 50-281 Remove Pages (contd)

Insert Pages (contd)

TSs (contd)

TSs (contd) 3.7-18 3.7-18 3.7-19 3.7-19 3.7-20 3.7-20 3.7-21 3.7-21 3.7-22 3.7-22 3.7-25 3.7-25 3.7-26 3.7-26 4.1-8b 4.1-8b

Enclosure SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 261 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-32 AND AMENDMENT NO. 261 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-280 AND 50-281

1.0 INTRODUCTION

By letter dated September 19, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072681096), as supplemented by letter dated April 11, 2008 (ADAMS Accession No. ML081021195), Virginia Electric and Power Company (the licensee) submitted a request for changes to the Surry Power Station, Unit Nos. 1 and 2 (Surry 1 and 2), Technical Specifications (TSs). The requested changes would revise various TS setting limits and the overtemperature T/overpower T time constants in TS 2.3 and TS 3.7 for Surry 1 and 2. The methodology for determining the revised setting limits and time constants is in agreement with methods 1 and 2 in The Instrumentation, Systems, and Automation Societys (ISAs) Standard ISA-R67.04, Part II, Methodologies for the Determination of Setpoints for Nuclear Safety-Related Instrumentation. The supplement dated April 11, 2008, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the U.S. Nuclear Regulatory Commission (NRC) staffs original proposed no significant hazards consideration determination as published in the Federal Register on October 23, 2007 (72 FR 60036). The proposed changes are summarized below:

1.1 Changes to the Setting Limits Source Range Neutron Flux High Reactor Trip: Changed the allowable value (AV) from 106 counts/second to 1.51x105 counts/second.

Pressurizer Low-Pressure Reactor Trip: Changed the AV from 1860 pounds per square inch gauge (psig) to 1875 psig.

Pressurizer High-Pressure Reactor Trip: Changed the AV from 2385 psig to 2380 psig.

Reactor Coolant Flow Low Reactor Trip: Changed the AV from 90% of normal indicated flow to 91% of normal indicated flow.

Pressurizer High-Level Reactor Trip: Changed the AV from 92% of span to 89.12% of span.

Steam Generator Water Level Low-Low Reactor Trip Safety Injection (SI): Changed the AV from 14.5% of narrow-range instrument span to 16.0% of narrow-range instrument span.

Steam Generator Water Level Low Coincident Reactor Trip: Changed the AV from 15% of narrow-range instrument span to 19% of narrow-range instrument span.

Permissive P-7, Unblock High-Power Reactor Trips: Changed the AV from 10% of rated power to before or when power increases to 11% of rated power.

Permissive P-10, Unblock Low-Power Reactor Trips: Changed the AV from 10% of rated power to before or when power decreases to 7% of rated power.

Permissive P-8, Power Range Neutron Flux: Changed the AV from 50% of rated power to before or when the power range nuclear flux increases to 37% of rated power.

Source Range High Flux: Changed the AV from 5x10-11 amperes to before or when the intermediate-range neutron flux decreases to 5x10-11 amperes.

Containment PressureHigh: Changed the AV from 19 pounds per square inch absolute (psia) to 18.5 psia.

Containment PressureHigh-High: Changed the AV from 25 psia to 24 psia.

Pressurizer PressureLow-Low: Changed the AV from 1760 psig to 1770 psig.

High Differential Pressure between Steam Line and Steam Line Header: Changed the AV from 150 psig to 135 psig.

Steam Line PressureLow: Changed the AV from 500 psig to 510 psig.

Low Intake Canal Level: Changed the AV from 23 feet and 6 inches to 23 feet and 5.85 inches.

Steam Generator Water LevelHigh-High: Changed the AV from 80% of narrow range to 76%

of narrow range.

Refueling Water Storage Tank Level (RWST)Low (Unit 1) Initiation of Recirculation: Changed the AV from 11.25% to 12.7%.

RWST LevelLow (Unit 1) Mode Transfer System: Changed the AV from 15.75% to 14.3%.

Pressurizer Pressure, P-11: Changed the AV from 2000 psig to 2010 psig.

Tavg, P-12: Changed the AV from 543 °F to 545 °F.

In TS Section 2.3, the licensee changed the time constants for overtemperature T and overpower T as follows:

J1: Changed the AV from = 25 seconds to 29.7 seconds.

J2: Changed the AV from = 3 seconds to 4.4 seconds.

J3: Changed the AV from = 10 seconds to 9.0 seconds.

1.2 Addition of Explanation to Technical Specification Section 2.3 The licensee has added an explanation to the overtemperature T and overpower T specification, which states that The channels maximum Trip Setpoint shall not exceed its computed Trip Setpoint by more than 2.0% of the T span. (Note that 2.0% of the T span is equal to 3.0% T Power.)

1.3 Addition of Footnote to Technical Specification Tables 3.7.1, 3.7.2, 3.7.3, and 3.7.4 The licensee has added the following footnote to TS table 3.7.1:

There is a Safety Analysis Limit associated with this Reactor Trip function. If during calibration the setpoint is found to be conservative with respect to the Limiting Safety System Setting but outside its predefined calibration tolerance, then the channel shall be brought back to within its predefined calibration tolerance before returning the channel to service. The calibration tolerances are specified in a document controlled under 10 CFR 50.59.

The licensee has added the following footnote to TS tables 3.7.2, 3.7.3, and 3.7.4:

There is a Safety Analysis Limit associated with this [Engineered Safety Feature]

ESF function. If during calibration the setpoint is found to be conservative with respect to the Setting Limit but outside its predefined calibration tolerance, then the channel shall be brought back to within its predefined calibration tolerance before returning the channel to service. The calibration tolerances are specified in a document controlled under 10 CFR 50.59.

2.0 REGULATORY EVALUATION

The following regulatory bases and guidance documents pertain to the proposed TS change:

Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.36(d)(1)(ii)(A),

states, ALimiting safety system settings for nuclear reactors are settings for automatic protective devices related to those variables having significant safety functions. Where a limiting safety system setting is specified for a variable on which a safety limit has been placed, the setting must be so chosen that automatic protective action will correct the abnormal situation before a safety limit is exceeded. If, during operation, it is determined that the automatic safety function does not function as required, the licensee shall take corrective action, which may include shutting down the reactor.@

Regulatory Guide (RG) 1.105, Revision 3, ASetpoints for Safety-Related Instrumentation,@

issued December 1999, describes a method acceptable to the NRC staff for complying with the NRC regulations for ensuring that setpoints for safety-related instrumentation are initially within and remain within the TS limits.

Regulatory Issue Summary (RIS) 2006-17, NRC Staff Position on the Requirements of 10 CFR 50.36, Technical Specifications, Regarding Limiting Safety System Settings During Periodic Testing and Calibration of Instrument Channels, dated August 24, 2006.

This RIS discusses the requirements of 10 CFR 50.36 and provides one approach that the NRC staff has found acceptable for identifying Limiting Safety System Settings during period testing and calibration of instrumentation guidance.

3.0 TECHNICAL EVALUATION

3.1 Changes to the Setting Limits By letter dated September 19, 2007, the licensee included the revised Technical Report EE-0116, Allowable value for North Anna Improved Technical Specifications (ITS), Tables 3.3.1-1 and 3.3.2-1 and Setting Limits for Surry Custom Technical Specifications (CTS), Sections 2.3 and 3.7, Rev. 3, to bring Surry 1 and 2 methodology for determining AV into agreement with methods 1 and 2 in ISA Standard ISA-RP67.04.02. This revised technical report was submitted in response to NRC staff concerns identified in RIS 2006-17 about the instrument setpoint methodology, particularly method 3 as defined in ISA Standard ISA-RP67.04.02, Methodologies for the Determination of Setpoints for Nuclear Safety-Related Instrumentation. The NRC staff found that method 3 did not meet the requirements of 10 CFR 50.36(d)(1)(ii)(A) with respect to instrument operability determination and could exceed the AL if instrument setpoint was not reset within the acceptable as left band after each test. In addition, the licensee, in its September letter, stated that the analytical limit (AL) will be protected if all three conditions are satisfied:

1.

The distance between the actual trip setpoint and the AL is equal to or greater than the total loop uncertainty (TLU) for that channel.

2.

The distance between the actual AV and the AL is equal to or greater than the non-channel operational test (non-COT) error components of the TLU.

3.

The distance between the actual trip setpoint and the actual AV is equal to the COT error components of the TLU without the inclusion of any excessive margin.

The NRC staff in its request for additional information questioned the licensees justification for the excessive margin statement in the third item. In its response, the licensee revised the sentence to read, The distance between the Actual Trip Setpoint and the Actual Allowable Value is equal to the COT error components of the Total Loop Uncertainty. The Allowable Value for certain functions may be rounded to a whole number that remains bounded by the available Safety Margin.

The licensee has calculated the instrument setpoints based on this new approach and revised the setting limits for the instrument functions identified in Section 1.0 of this safety evaluation. The licensees setpoint methodology determines the AV based on the uncertainties included only for COT and does not include any additional margin except rounding off to a whole number.

Therefore, AV is the same as the acceptable as-found value defined in RIS 2006-17. The licensee has defined the acceptable as-left value equal to the calibration tolerance value which is more conservative than that defined in RIS 2006-17. Therefore, the NRC staff finds that the licensee has addressed the NRC staff concerns with respect to operability and protecting the AL.

On this basis, the NRC staff concludes that the licensee setpoint methodology meets the guidance provided in RIS 2006-17. The licensee has revised the affected TS Sections 2.3, 3.1, and 4.1-1 and TS Tables 3.7-1, 3.7-2, and 3.7-4 where these settings are listed. The NRC staff has reviewed the instrument setpoint calculation contained in the Technical Report EE-0116 and determined that these settings are calculated based on the acceptable ISA methodology, and therefore, the NRC staff finds them acceptable.

3.2 Addition of Explanation to Technical Specification Section 2.3 The licensee has added an explanation to TS Section 2.3, which states that The channels maximum Trip Setpoint shall not exceed its computed Trip Setpoint by more than 2.0% of the T span. (Note that 2.0% of the T span is equal to 3.0% T Power.) The licensee stated that since the overpower T and overtemperature T reactor trip setpoint is variable and is constantly calculated based on actual plant conditions, the AV (maximum trip setpoint) cannot be expressed as a constant. The licensee also stated that AV of 2.0 percent of the T span is consistent with the original design basis for this function. The NRC staff reviewed this change and found that because this is more conservative with respect to the Channel Statistical Allowance (CSA) calculation assumptions, the proposed addition to the footnote is acceptable.

3.3 Addition of Footnote to Technical Specification Tables 3.7-1, 3.7-2, 3.7-3, and 3.7-4 The licensee has added the following footnote to TS Table 3.7-1:

There is a Safety Analysis Limit associated with this Reactor Trip function. If during calibration the setpoint is found to be conservative with respect to the Limiting Safety System Setting but outside its predefined calibration tolerance, then the channel shall be brought back to within its predefined calibration tolerance before returning the channel to service. The calibration tolerances are specified in a document controlled under 10 CFR 50.59.

The licensee has applied this footnote to the following functions in TS Table 3.7-1:

Functional Unit 2 Neutron Flux Power Range Functional Unit 3 Neutron Flux Intermediate Range Functional Unit 4 Neutron Flux Source Range Functional Unit 5 Overtemperature T Functional Unit 7 Low Pressurizer Pressure Functional Unit 8 High Pressurizer Pressure Functional Unit 9 Pressurizer-Hi Water Level Functional Unit 10 Low Flow [Reactor Coolant]

Functional Unit 12 Lo-Lo Steam Generator Water Level Functional Unit 20.c Power range neutron flux, P-8 The NRC staff finds that the proposed note by the licensee will add operability determination of the subject functions in the TS as required by RIS 2006-17. However, the NRC staff found that the licensee should add this footnote, or justify why this footnote is not needed for two additional functions, Functional Unit 6-Overpower T, and Functional Unit 17-Low steam generator water level with steam/feedwater flow mismatch. The NRC staff required this information to conclude that these functions are not safety limit related functions and therefore, the above footnote is not needed. In response to the NRC staffs concern, the licensee justified the exclusion on the basis that neither of these functions has been credited in the safety analysis and proposed to add another note for consistency in the TS in its supplemental letter dated April 11, 2008. This note reads as follows:

If during calibration the setpoint is found to be conservative with respect to the Limiting Safety System Setting but outside its predefined calibration tolerance, then the channel shall be brought back to within its predefined calibration tolerance before returning the channel to service. The calibration tolerances are specified in a document controlled under 10 CFR 50.59.

The NRC staff finds that this footnote achieves the same requirements as for safety limit related function and identifies that the function is not safety limit related. Therefore, the NRC staff finds the licensees proposed change acceptable.

The licensee has added a footnote to TS Tables 3.7-2, 3.7-3, and 3.7-4, which states the following:

There is a Safety Analysis Limit associated with this ESF function. If during calibration the setpoint is found to be conservative with respect to the Setting Limit but outside its predefined calibration tolerance, then the channel shall be brought back to within its predefined calibration tolerance before returning the channel to service. The calibration tolerances are specified in a document controlled under 10 CFR 50.59.

The licensee has applied this footnote to the following functions in TS Table 3.7-2:

Functional Unit 1.b High containment pressure Functional Unit 1.c High differential pressure between any steam line and the steam header Functional Unit 1.d Pressurizer low-low pressure Functional Unit 1.e High steam flow in 2/3 steam lines coincident with low Tavg or low steam line pressure Functional Unit 1.e.1 Steam line flow Functional Unit 1.e.2 Tavg Functional Unit 1.e.3 Steam line pressure Functional Unit 2.b High containment pressure (Hi-Hi)

Functional Unit 3.a Steam generator water level low-low Functional Unit 5.a Low intake canal level Functional Unit 7.a RWST Level - Low-Low Functional Unit 8.a RWST Level - Low Coincident with High-High Containment Pressure The licensee has applied this footnote to the following functions in TS Table 3.7-3:

Functional Unit 1.b.1 High containment pressure Functional Unit 1.c.1 High containment pressure (Hi-Hi setpoint)

Functional Unit 2.a High steam flow in 2/3 lines coincident with 2/3 low Tavg or 2/3 low steam pressures Functional Unit 2.b High containment pressure (Hi-Hi setpoint)

Functional Unit 3.a Steam generator water-level high-high The licensee has applied this footnote to the following functions in TS Table 3.7-4:

Functional Unit 1 High Containment Pressure (High Containment Pressure Signal)

Functional Unit 2 High-High Containment Pressure (High-High Containment Pressure Signals)

Functional Unit 3 Pressurizer Low-Low Pressure Functional Unit 4 High Differential Pressure between Steam Line and the Steam Line Header Functional Unit 5 High Steam Flow in 2/3 Steam Lines Coincident with Low Tavg or Low Steam Line Pressure Functional Unit 6 Steam Generator Water Level Low-Low Functional Unit 8.a Low Intake Canal Level Functional Unit 9.a RWST Level-Low-Low Functional Unit 10.a Steam Generator Water Level High-High Functional Unit 11 RWST Level Low (Coincident with High High Containment Pressure)

The NRC staff finds that the proposed note will add operability requirements for all these functions as required by RIS 2006-17. Therefore, the NRC staff finds the proposed change acceptable.

On the basis of its review of the licensees submittal, the NRC staff has concluded that the instrument setpoint methodology for the proposed TS changes is acceptable. The NRC staff further concludes that by adding footnotes to the TS tables, the TSs rather than the procedures will control instrument operability. The NRC staff also concludes that the proposed TS changes specified in Section 1.0 of this safety evaluation meet the requirements of 10 CFR 50.36(d)(1)(ii)(A) as the licensees setpoint methodology meets the NRC staffs guidance provided in RIS 2006-17, and, therefore, are acceptable.

4.0 STATE CONSULTATION

In accordance with the Commission's regulations, the Virginia State official was notified of the proposed issuance of the amendments. The State official had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendments change requirements with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts and no significant change in the types of any effluents that may be released offsite and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (72 FR 60036). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: H. Garg Date: September 17, 2008

Surry Power Station, Unit Nos. 1 & 2 cc:

Mr. David A. Christian President and Chief Nuclear Officer Virginia Electrical and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Ms. Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

120 Tredegar Street, RS-2 Richmond, VA 23219 Mr. Donald E. Jernigan Site Vice President Surry Power Station Virginia Electric and Power Company 5570 Hog Island Road Surry, Virginia 23883-0315 Senior Resident Inspector Surry Power Station U. S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883 Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218 Dr. Robert B. Stroube, MD, MPH State Health Commissioner Office of the Commissioner Virginia Department of Health Post Office Box 2448 Richmond, Virginia 23218 Office of the Attorney GeneralCommonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Mr. Chris L. Funderburk, Director Nuclear Licensing & Operations Support Innsbrook Technical Center 5000 Dominion Blvd.

Glen Allen, Virginia 23060-6711 Mr. Matt Adams, Director Nuclear Safety and Licensing Virginia Electric and Power Company Surry Power Station 5570 Hog Island Road Surry, Virginia 23883-0315 Mr. Curtis G. Luffman Manager Nuclear Protection Services Surry Power Station 5570 Hog Island Road Surry, VA 23883-0315 Mr. Barry Garber Supervisor Nuclear Engineering Surry Power Station 5570 Hog Island Road Surry, VA 23883-0315 Ms. Leslie N. Hartz, Vice President Nuclear Support Services Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. Nelson K. Martin Manager Nuclear Fleet Protection Services Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711