Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
BVY 04-078, Application for Technical Specifications Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Using the Consolidated Line Item Improvement Process | 1 September 2004 | Application for Technical Specifications Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Using the Consolidated Line Item Improvement Process | High Radiation Area Offsite Dose Calculation Manual Post Accident Monitoring Incorporated by reference Annual Radiological Environmental Operating Report Process Control Program Deep Dose Equivalent |
CNRO-2018-00047, Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment; and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) | 16 November 2018 | Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment; and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) | Safe Shutdown Cyber Security Exemption Request Chernobyl Fire Protection Program Flow Induced Vibration |
ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions | 27 April 2009 | Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions | Safe Shutdown Fitness for Duty |
L-20-024, Attachments 1 - 3: Summary of Evaluation of Proposed Changes, Proposed Change to PNPS Renewed Facility License Condition 3.G (Mark-up) and (Clean Copy) | 2 April 2020 | Attachments 1 - 3: Summary of Evaluation of Proposed Changes, Proposed Change to PNPS Renewed Facility License Condition 3.G (Mark-up) and (Clean Copy) | |
L-21-008, License Amendment Request to Approve Pilgrim Nuclear Power Station Independent Spent Fuel Storage Installation Only Emergency Plan | 18 February 2021 | License Amendment Request to Approve Pilgrim Nuclear Power Station Independent Spent Fuel Storage Installation Only Emergency Plan | Time of Discovery Offsite Dose Calculation Manual Emergency Lighting Safeguards Contingency Plan Earthquake Fire Protection Program Fire Watch Grace period |
L-21-036, Proposed Independent Spent Fuel Storage Installation-Only Security, Training and Qualification, Safeguards Contingency Plan | 17 March 2021 | Proposed Independent Spent Fuel Storage Installation-Only Security, Training and Qualification, Safeguards Contingency Plan | |
ML021440218 | 1 May 2002 | Request for Amendment, Change to Applicability of Pilgrim'S Pressure-Temperature Curves as Described in Technical Specification Figures 3.6.1, 3.6.2, & 3.6.3 | Hydrostatic |
ML021990524 | 5 July 2002 | License Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request | Ultimate heat sink Anticipated operational occurrence Power change |
ML022030440 | 5 June 2002 | License Amendment Request Relocation of Coolant Chemistry - Conductivity and Chlorides as Described in Technical Specification 3/4.6.B to Updated Final Safety Analysis Report | |
ML022040057 | 5 July 2002 | License Amendment Request Relocation of Shock Suppressors (Snubbers) Requirements as Described in Technical Specification 3/4.6.I to Updated Final Safety Analysis Report | High Radiation Area Earthquake |
ML022330442 | 13 August 2002 | Supplement to License Amendment Request Letter No. 2.02.032 from Entergy Nuclear Generation Company | |
ML022380338 | 16 August 2002 | Request for Amendment to Technical Specifications Associated with the Refueling Interlocks, Specifications 3/4.10.A & D | Shutdown Margin Spiral reload |
ML022380343 | 16 August 2002 | Request for Amendment to the Technical Specifications Deletion of Requirement from LCO 3/4.10.D, Multiple Control Rod Removal. | Shutdown Margin |
ML022380346 | 16 August 2002 | Request for Amendment to the Technical Specifications Consolidated Line Item Improvement Process (Clip) Implementation to TSTF-358 - Missed Surveillance Requirements | Time of Discovery Incorporated by reference Missed surveillance |
ML022400036 | 19 August 2002 | Request for Amendment to the Technical Specifications Changes to Post-Accident Monitoring Instrumentation Requirements | Post Accident Monitoring |
ML022410059 | 16 August 2002 | Request for Amendment to the Technical Specifications Relocation of Certain Control Rod Block Requirements to the Updated Final Safety Analysis Report | Scram Discharge Volume |
ML022910379 | 10 October 2002 | Request for Technical Specification Change Concerning Change of Trip Level Settings, Calibration Frequencies, and Editorial Changes, Revision 1 | Safe Shutdown Mission time |
ML023300276 | 19 August 2002 | Request for Amendment to the Technical Specifications Changes to Post-Accident Monitoring Instrumentation Requirements | Post Accident Monitoring |
ML030300440 | 23 January 2003 | Request for Amendment to TS Emergency Core Cooling System Requirements During Shutdown Conditions | Reactor Vessel Water Level |
ML030420029 | 30 January 2003 | Request for Amendment to TS, Jet Pump Operability Surveillance Requirements & Correction to Reference Cited in TS 4.11.C.1, Revision 1 | |
ML030640412 | 14 February 2003 | Request for Amendment to Technical Specifications Changes to Post Accident Monitoring Instrumentation Requirements, Supplement | Post Accident Monitoring |
ML031130480 | 16 April 2003 | Supplement to Request for Amendment to Technical Specifications Associated with Refueling Interlocks, Specifications 3/4.10.A and D | |
ML032390057 | 19 August 2003 | License Amendment Request to Amend Technical Specifications Table 3.2.C-1 | |
ML033530386 | 8 December 2003 | Proposed License Amendment Changes in the Reactor Vessel Material Surveillance Program, Technical Specification Surveillance 4.6.A.2 | |
ML040060622 | 24 December 2003 | Application for Technical Specification (TS) Improvement to Delete the TS Requirements for the Hydrogen Analyzers Using the Consolidated Line Item Improvement Process | Incorporated by reference |
ML041130095 | 14 April 2004 | Proposed License Amendment for a Limited Scope Application of the Alternate Source Term (NUREG-1465) for Re-evaluation of the Fuel Handling Accident Dose Consequences | Fuel cladding Recently irradiated fuel |
ML041130279 | 14 April 2004 | Request for Amendment to the Technical Specifications Reactor Vessel Hydrostatic and Leak Testing Requirements | Time of Discovery High Radiation Area Hydrostatic Missed surveillance |
ML041170468 | 14 April 2004 | Request for Amendment, to the Technical Specifications to Provide a One-time Integrated Leak Rate Test (ILRT) Interval Extension | Probabilistic Risk Assessment Large early release frequency |
ML042590566 | 2 September 2004 | Proposed License Amendment: Revision to the Technical Specification (TS) Surveillance Requirement (SR) Frequency for Containment and Suppression Pool (Torus) Spray Headers and Nozzles Inspections (TS 4.5.B.2.2) | High Radiation Area Hydrostatic Foreign Material Exclusion |
ML042640026 | 2 September 2004 | License Amendment Request, Technical Specification Changes for Single Recirculation Loop Operation | Safe Shutdown Safety Limit Minimum Critical Power Ratio Abnormal operational transient Fire Protection Program |
ML042940375 | 12 October 2004 | Request for NRC Approval of Engineering Evaluation for Elevated Discharge Pipe Temperature of Safety Relief Valve 203-3C | Stroke time |
ML043560151 | 14 December 2004 | Technical Specifications Amendment Request to Revise Actions for Scram Discharge Volume (SDV) Vent and Drain Valves Consistent with Technical Specifications Task Force (TSTF) Change Traveler, TSTF-404 | Incorporated by reference Scram Discharge Volume |
ML043560152 | 14 December 2004 | Technical Specifications Amendment Request to Relocate Various Specifications Not Meeting the Criteria of 10CFR50.36(c)(2)(ii) | Fuel cladding |
ML043560166 | 14 December 2004 | Technical Specifications Amendment Request to Reflect Surveillance Frequency Improvements | Power change |
ML043560279 | 14 December 2004 | Technical Specifications Amendment Request to Relocate Administrative Titles and Responsibilities and Other Administrative Changes | High Radiation Area Offsite Dose Calculation Manual Incorporated by reference |
ML043650060 | 15 December 2004 | Proposed License Amendment for a Limited Scope Application of the Alternate Source Term (NUREG-1465) for Re-evaluation of the Fuel Handling Accident Dose Consequences, Rev. 1 | Fuel cladding Recently irradiated fuel |
ML051520458 | 24 May 2005 | Technical Specifications Amendment Request for Rod Worth Minimizer (RWM) Bypass Allowances | Shutdown Margin High Radiation Area Hydrostatic |
ML051520468 | 24 May 2005 | Request for Amendment to Technical Specification to Remove Main Steam Isolation Valve Twice Per Week Testing Surveillance Requirement | |
ML051520473 | 24 May 2005 | Request for Amendment to the Technical Specifications to Delete Requirement Related to NRC Approval of Engineering Evaluation for Elevated Safety Relief Valve Discharge Pipe Temperature | |
ML051520474 | 24 May 2005 | Technical Specifications Amendment Request to Revise Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Applicability Requirements | Hydrostatic |
ML051720406 | 2 June 2005 | Technical Specifications Amendment Request to Revise Reactor Coolant System Leakage Detection System Instrumentation Requirements and Actions | Grab sample Hydrostatic Pressure Boundary Leakage Pressure boundary leak |
ML053040450 | 18 October 2005 | Technical Specifications Amendment Request for Single Control Withdrawal Allowances, TS 3/4.14 Special Operations. | High Radiation Area Hydrostatic Scram Discharge Volume Spiral reload |
ML060300028 | 25 January 2006 | 2006/01/25-Pilgrim Nuclear Power Station License Renewal Application | |
ML061090832 | 12 April 2006 | Proposed License Amendment to Change Technical Specification 3.6.A.2, Pressure-Temperature Limit Curves | Anticipated operational occurrence Hydrostatic |
ML061870469 | 30 June 2006 | Technical Specifications Amendment Request to Revise the Surveillance Requirements for the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) Systems | Reactor Vessel Water Level |
ML061940175 | 5 July 2006 | 2006/07/05-Pilgrim - License Renewal Application Amendment 3 | Safe Shutdown Non-Destructive Examination Mission time Grab sample Fire Barrier Weld Overlay Hydrostatic Coatings Met Tower Nondestructive Examination VT-2 Aging Management Moisture barrier B.5.b Mitigating Strategies Earthquake Maintenance Rule Program EVT-1 Liquid penetrant Through-Wall Leak Fire Protection Program Dissimilar Metal Weld |
ML062490489 | 30 August 2006 | Technical Specification Amendment Request to Relocate Specifications Not Meeting the Criteria of 10 CFR 50.36(c)(2)(ii), Revision 1, | |
ML062500117 | 30 August 2006 | 2006/08/30-Pilgrim, Response to Requests for Additional Information Re License Renewal Application Amendment 7 | Weld Overlay Nondestructive Examination Aging Management Scram Discharge Volume Pressure boundary leak |
ML063130351 | 2 November 2006 | Application for Technical Specification (TS) Change to Add LCO 3.0.8 on the Inoperability of Snubbers (and Adoption of TS Bases for LCO 3.0.8) Using the Consolidated Line Item Improvement Process (CLIIP) | Time of Discovery Incorporated by reference |
ML063560114 | 25 October 2006 | Reactor Pressure Vessel Fluence Evaluation at End of Cycle 15 and 54 EFPY (Non-Proprietary) |