ML022330442

From kanterella
Jump to navigation Jump to search
Supplement to License Amendment Request Letter No. 2.02.032 from Entergy Nuclear Generation Company
ML022330442
Person / Time
Site: Pilgrim
Issue date: 08/13/2002
From: Dugger C
Entergy Nuclear Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022330442 (2)


Text

- Entergy Entergy Nuclear Generation Company Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Charles M. Dugger Vice President - Operations August 13, 2002 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Supplement to License Amendment Request Letter No. 2.02.032

REFERENCE:

Entergy/Pilgrim Letter No. 2.02.032, "License Amendment Request, Relocation of Coolant Chemistry - Conductivity And Chlorides As Described in Technical Specification 3/4.6.B to updated Final Safety Analysis Report", dated June 5, 2002 [sic].

Letter Number: 2.02.076

Dear Sir or Madam:

This letter supplements Entergy Nuclear Operations, Inc. (Entergy) requested license amendment letter No. 2.02.032 to relocate Reactor Coolant Chemistry Technical Specification 3/4.6.B from the Technical Specifications to the Updated Final Safety Analysis Report.

Subsequent to the transmittal of the referenced letter, Entergy discovered that the cover letter was printed with a "June 5, 2002" date, instead of the actual signature and affirmation date of "July 5, 2002". This is an inadvertent word processing error and does not impact the license amendment application. With this letter, Entergy is correcting this date discrepancy.

The correct date of Entergy Letter Number 2.02.032 is July 5, 2002.

If you have any questions or require additional information, please contact Mr. Bryan Ford, Licensing Manager, at (508) 830-8403.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 13th day of August 2002.

Sincerely Charles M. Dugger 202076

Entergy Nuclear Operations, Inc. Letter Number: 2.02.076 Pilgrim Nuclear Power Station Page 2 CMD/dd cc: Mr. Travis Tate, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station Mr. Steve McGrail, Director Mass. Emergency Management Agency 400 Worcester Road P.O. Box 1496 Framingham, MA 01702 Mr. Robert Hallisey Radiation Control Program Commonwealth of Massachusetts Exec Offices of Health & Human Services 174 Portland Street Boston, MA 02114 202076