Technical Specifications Amendment Request to Relocate Various Specifications Not Meeting the Criteria of 10CFR50.36(c)(2)(ii)
ML043560152
Person / Time
Site: Pilgrim
Issue date: 12/14/2004
From: Balduzzi M
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.04.104
Download: ML043560152 (28)


Text

...

'~ Entergy Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Michael A. Balduzzi Site Vice President December 14, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Technical Specifications Amendment Request to Relocate Various Specifications Not Meeting the Criteria of 10 CFR 50.36(c)(2)(ii)

REFERENCE:

NUREG-1433, Standard Technical Specifications for General Electric Plants, BWR/4, Revision 3 LETTER NUMBER: 2.04.104

Dear Sir or Madam:

Pursuant to 10 CFR 50.90, Entergy Nuclear Operations Inc. (Entergy) hereby proposes to amend its Facility Operating License, DPR-35. This proposed license amendment would relocate various requirements from the TS to the Final Safety Analysis Report (FSAR) or Technical Specification (TS) Bases. These requirements do not meet the criteria for inclusion in the TS as presented in 10 CFR 50.36(c)(2)(ii) and relocation is consistent with the content of the Standard Technical Specifications (NUREG-1433, Revision 3). Entergy has reviewed the proposed amendment in accordance with 10 CFR 50.92 and concludes it does not involve a significant hazards consideration.

Entergy requests approval of the proposed amendment by December 30, 2005. Once approved, the amendment shall be implemented within 60 days. Commitments made by the licensee in this letter are listed in Attachment 2.

2.04.104

--- .. ... i Entergy Nuclear Operations, Inc. Letter Number: 2.04.104 Pilgrim Nuclear Power Station Page 2 If you have any questions or require additional information, please contact Bryan Ford at (508) 830-8403.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the day of December, 2004.

Sincerely, Michael A. Balduzzi ES/dm

Enclosure:

Evaluation of the proposed change - 9 pages Attachments: 1. Proposed Technical Specification and Bases Changes (mark-up) - 12 pages

2. List of Regulatory Commitments - 1 page cc: Mr. Robert Fretz, Project Manager Ms. Cristine McCombs, Director Office of Nuclear Reactor Regulation Mass. Emergency Management Mail Stop: 0-8B-1 Agency U.S. Nuclear Regulatory Commission 400 Worcester Road 1 White Flint North Framingham, MA 01702 11555 Rockville Pike Rockville, MD 20852 Senior Resident Inspector Mr. Robert Walker, Director Pilgrim Nuclear Power Station Massachusetts Department of Public Health Radiation Control Program 90 Washington Street Dorchester, MA 02121 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19408 2.04.104

ENCLOSURE EVALUATION OF THE PROPOSED CHANGE

ENCLOSURE Evaluation of the Proposed Change

Subject:

Technical Specifications Amendment Request to Relocate Various Specifications Not Meeting the Criteria of 10 CFR 50.36(c)(2)(ii)

1. DESCRIPTION
2. PROPOSED CHANGES
3. BACKGROUND
4. TECHNICAL ANALYSIS
5. REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration 5.2 Environmental Consideration
6. PRECEDENTS
7. REFERENCES

Letter 2.04.104 Enclosure Page 1 of 9

1. Description Entergy Nuclear Operations, Inc. (Entergy) is requesting to amend Operating License DPR-35 for Pilgrim Nuclear Power Station (PNPS). The proposed changes would revise the Operating License, Technical Specifications (TS) to relocate various requirements from the TS to the Final Safety Analysis Report (FSAR) or TS Bases. These requirements do not meet the criteria for inclusion in the TS as presented in 10 CFR 50.36(c)(2)(ii).
2. Proposed Changes 2.1 Relocate Reactor Protection System (RPS) alarm instrumentation functional test requirements to the FSAR. Affected TS Sections and pages:
  • Table 3.2.B, page 3/4.2-15
  • Table 4.2.B, Item 7, page 3/4.2-32 2.3 Relocate core spray sparger (header) d/p instrumentation requirements to the FSAR. Affected TS Sections and pages:
  • Table 3.2.B, page 3/4.2-15
  • Table 4.2.B, Item 9, page 3/4.2-32
  • 4.5.A.1.d, page 3/4.5-2 2.4 Relocate structural integrity requirements to the FSAR. Affected TS Sections and pages:
  • 3.6.G and 4.6.G, page 3/4.6-8
  • Bases pages B3/4.6-11 and B3/4.6-12 2.5 Relocate drywell-suppression chamber vacuum breaker position indication alarm system and associated actions to the TS Bases. Remove explicit detail defining "operable" drywell-suppression chamber vacuum breakers and include new surveillance to verify vacuum breaker closure. Make editorial terminology correction. Affected TS Sections and pages:
  • 3.7.A.3.a, page 3/4.7-7: add "vacuum" between "reactor building" and "breakers."
  • 3.7.A.4.a, page 3/4.7-7: Delete "Drywell-pressure suppression chamber vacuum breakers shall be considered operable if:" Also, make administrative corrections to referenced Specifications 3.7.A.4.b, c, and d reflecting other changes such that the referenced Specification is 3.7.A.4.b only.
  • 4.7.A.4.a.1, page 3/4.7-7 added as a new surveillance to require: 'Verify each drywell-pressure suppression chamber vacuum breaker is closed, except for testing, at least every 14 days." Current TS 4.7.A.4.a.1 and a.2 renumbered to a.2 and a.3.
  • 3.7.A.4.a.1, 2, and 3, 3.7.A.4.b, and 4.7.A.4.b.2, page 3/4.7-8 are deleted. Renumber 3.7.A.4.c as 3.7.A.4.b.
  • 3.7.A.4.d, page 3/4.7-9 is deleted.

e Associated Bases, page B3/4.7-7 revised to reflect these changes.

Letter 2.04.1 04 Enclosure Page 2 of 9 2.6 Delete TS 3.6.H, page 3/4.6-8.

3. Background 3.1 The reactor protection system (RPS) automatically initiates a reactor scram to (1) preserve the integrity of the fuel cladding, (2) preserve the integrity of the reactor coolant system, and (3) minimize the energy which must be absorbed following a loss of coolant accident, and prevents criticality. PNPS TS 3/4.1, Reactor Protection System, provides the limiting conditions for operation necessary to preserve the ability of the system to tolerate single failures and still perform its intended function even during periods when instrument channels may be out of service because of maintenance.

The RPS is of the dual channel type (reference FSAR Section 7.2 for additional design detail).

The system is made up of two independent trip systems, each having two subchannels of tripping devices. Each subchannel has an input from at least one instrument channel that monitors a critical parameter. The outputs of the subchannels are combined in a 1 out of 2 logic (i.e., an input signal on either one or both of the subchannels will cause a trip system trip). The outputs of the trip systems are arranged so that a trip on both systems is required to produce a reactor scram.

Whenever an RPS sensor trips, it lights a printed red window (common to all the channels for that variable) on the reactor control panel in the control room to indicate the out of limit variable.

Each trip system lights a red window to indicate which trip system has tripped. An RPS channel trip also sounds a buzzer or horn, which can be silenced by the operator. The annunciator window lights latch in until manually reset. Reset is not possible until the condition causing the trip has been cleared. A computer printout identifies each tripped channel. However, the physical positions of RPS relays may be used to identify individual sensors that have tripped from a group of sensors monitoring the same variable. The location of alarm windows provides the operator with the means to quickly identify the cause of RPS trips, and to evaluate the threat to the fuel or nuclear system process barrier. Alarms are not required for plant safety. RPS inputs to annunciators, recorders, and the computer are arranged so that no malfunction of the annunciating, recording, or computing equipment can functionally disable the RPS. Signals directly from the RPS sensors are not used as inputs to annunciating or data logging equipment.

Relay contact isolation is provided between the primary signal and the information output.

3.2 The purpose of the Residual Heat Removal (RHR) and Core Spray (CS) trip system bus power monitors is to monitor availability of Start-up transformer, availability of the emergency 4160 kV busses A5 and A6, and availability of the 125V DC control power to their respective logic systems. If any of these monitored parameters (bus power) are not available, these devices will annunciate an alarm in the main control room alerting the operator to investigate and take corrective action. The purpose of the trip system bus power monitors for the Automatic Depressurization System (ADS), High Pressure Coolant Injection system (HPCI), and Reactor Core Isolation Cooling system (RCIC) is to monitor availability of 125V DC control power to the logic systems. If 125V DC power is unavailable, these devices will annunciate an alarm in the main control room alerting the operator to investigate and take corrective action. The only function of these devices is to provide alarm in the control room; they do not initiate any trips or automatic actions.

3.3 Two independent loops are provided as a part of the core spray system. Each loop consists of a core spray pump, a sparger ring, a spray nozzle, and the necessary piping, valves, and instrumentation. In case of low water level in the reactor vessel or high pressure in the drywell, the core spray system, when reactor vessel pressure is low enough, automatically sprays water

Letter 2.04.1 04 Enclosure Page 3 of 9 onto the top of the fuel assemblies in time and at a sufficient flow rate to cool the core and limit fuel clad temperature. The two 100 percent capacity core spray lines separately enter the reactor vessel through the two core spray nozzles. The lines divide immediately inside the reactor vessel. The two halves are routed to opposite sides of the reactor vessel. The header halves are then routed downward into the downcomer annulus and pass through the upper shroud immediately below the flange. The flow divides again as it enters the center of the semicircular sparger ring which is routed halfway around the inside of the upper shroud. The other core spray line is identical except that the header enters the opposite side of the vessel and the sparger rings are at a slightly different elevation in the shroud. The proper spray distribution pattern is provided by a combination of distribution nozzles pointed radially inward and downward from the sparger rings.

A detection system is also provided to continuously confirm the integrity of the core spray piping between the inside of the reactor vessel and the core shroud. A differential pressure switch measures the pressure difference between the top of the core support plate and the inside of the core spray sparger pipe just outside the reactor vessel. If the core spray sparger piping is sound, this pressure difference will be the small drop across the core resulting from inter-channel leakage. If integrity is lost, this pressure drop will also include the steam separator pressure drop. An increase in the normal pressure drop initiates an alarm in the main control room.

3.4 The Pilgrim Nuclear Power Station Inservice Inspection Program conforms to the requirements of 10 CFR 50.55a(g). Where practical, the inspection of ASME Section Xl Class 1, 2, and 3 components conforms to the edition and addenda of Section Xl of the ASME Boiler and Pressure Vessel Code required by 10 CFR 50.55a(g). When implementation of an ASME Code required inspection is determined to be impractical for PNPS, a request for relief from the inspection requirement is submitted to the NRC in accordance with 10 CFR 50.55a(g)(5)(iii).

Requests for relief from the ASME Code inspection requirements are submitted to the NRC prior to the beginning of each 10-year inspection interval for which the inspection requirement is known to be impractical. Requests for relief from inspection requirements that are identified to be impractical during the course of the inspection interval are reported to the NRC on an annual basis throughout the inspection interval.

3.5 The purpose of the drywell-suppression chamber vacuum breakers is to limit the pressure differential between the suppression chamber and drywell during post-accident drywell coolant operations so that the structural integrity of the containment is maintained. Additionally, when the vacuum breakers are in the closed position, the drywell atmosphere is directed through the suppression chamber vent header downcomers during drywell pressurization conditions. The flow path area for drywell atmosphere to reach suppression chamber air space without quenching via submerged downcomers (i.e., bypass area) must not exceed an allowable area.

The allowable bypass area is based upon analysis considering primary system break area, suppression chamber effectiveness, and containment design pressure. Analyses show that the maximum allowable bypass area is 0.2 ft2, which is equivalent to all vacuum breakers open 3/32". The effective total bypass area can be measured with a differential pressure decay rate, which is limited to 25% of allowable, thus providing a margin of safety for the primary containment in the event of a small break in the primary system.

Each drywell suppression chamber vacuum breaker is equipped with three switches. One switch provides full open indication only. Another switch provides closed indication and an alarm should any vacuum breaker come off its closed seat by greater than 3/32". The third switch provides a separate signal to the alarm should any vacuum breaker come off its closed

Letter 2.04.104 Enclosure Page 4 of 9 seat by greater than 3/32". The annunciator system is non-safety related and performs no direct safety function.

4. Technical Analysis Section 182a of the Atomic Energy Act of 1954, as amended (the Act) requires applicants for nuclear power plant operating licenses to include the TS as part of the license. The Commission's regulatory requirements related to the content for the TS are set forth in 10 CFR 50.36. That regulation requires that the TS include items in eight specific categories.

The categories are (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation; (3) surveillance requirements; (4) design features; (5) administrative controls; (6) decommissioning; (7) initial notification; and (8) written reports.

However, the regulation does not specify the particular requirements to be included in a plant's TS.

The Commission amended 10 CFR 50.36 (60 FR 36593, July 19, 1995), and codified four criteria to be used in determining whether a particular matter is required to be included in a limiting condition for operation (LCO), as follows: (1) Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary; (2) a process variable, design feature, or operating restriction that is an initial condition of a design-basis accident or transient analysis that either assumes the failure of, or presents a challenge to, the integrity of a fission product barrier; (3) a structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design-basis accident or transient that either assumes the failure of, or presents a challenge to, the integrity of a fission product barrier; or (4) a structure, system, or component which operating experience or probabilistic safety assessment has shown to be significant to public health and safety. LCOs and related requirements that fall within or satisfy any of the criteria in the regulation must be retained in the TS, while those requirements that do not fall within or satisfy these criteria may be relocated to licensee-controlled documents. The PNPS FSAR and TS Bases are such licensee-controlled documents.

Consistent with these criteria, Entergy proposes to relocate the following specifications from the PNPS TS to the FSAR or TS Bases. The four criteria of 10 CFR 50.36 are addressed for each change.

4.1 TS Table 4.1.1 Functional Test requirements to include "and Alarm" are proposed for relocation to the FSAR.

(1) The alarm portion of the RPS instrumentation channels can be used to assist the operator in diagnosing the cause of any reactor trip. However, this instrumentation is not used to detect and indicate in the control room a significant abnormal degradation of the reactor coolant pressure boundary.

(2) The alarm portion of the RPS instrumentation channels specified in TS Table 4.1.1 are not used as an initial condition of a design basis accident or transient analysis that either assumes the failure of, or presents a challenge to, the integrity of a fission product barrier. RPS trip functions are assumed to function; however, this alarm instrumentation is not required to maintain or preclude a challenge to that integrity.

(3) The alarm portion of the RPS instrumentation channels specified in TS Table 4.1.1 are not used as part of the primary success path which functions or actuates to mitigate a design basis accident or transient. RPS trip functions are assumed to function for

Letter 2.04.104 Enclosure Page 5 of 9 accident mitigation sequences; however, this alarm instrumentation is not required to maintain or preclude a challenge to that function.

(4) Operating experiences or probabilistic safety assessments have not shown the alarm portion of the RPS instrumentation channels specified in TS Table 4.1.1 to be significant to public health and safety.

The alarm portion of the RPS instrumentation channels functional test requirements specified in TS Table 4.1.1 will be relocated to the FSAR. Therefore, any changes to these requirements will be strictly controlled by the provisions of 10 CFR 50.59.

4.2 TS Tables 3.2.B and 4.2.B trip system bus power monitors requirements for residual heat removal (RHR)/low pressure coolant injection (LPCI), core spray, automatic depressurization system (ADS), high pressure coolant injection (HPCI), and reactor core isolation cooling (RCIC) systems are proposed for relocation to the FSAR.

(1) The trip system bus power monitors alarm instrumentation channels can be used to assist the operator in diagnosing the off-normal conditions. However, this instrumentation is not used to detect and indicate in the control room a significant abnormal degradation of the reactor coolant pressure boundary.

(2) The trip system bus power monitors alarm instrumentation channels specified in TS Tables 3.2.B and 4.2.B are not used as an initial condition of a design basis accident or transient analysis that either assumes the failure of, or presents a challenge to, the integrity of a fission product barrier. Trip system bus power is assumed to provide trip functions; however, this alarm-only instrumentation is not required to maintain or preclude a challenge to that function.

(3) The trip system bus power monitors alarm instrumentation channels specified in TS Tables 3.2.b and 4.2.B are not used as part of the primary success path which functions or actuates to mitigate a design basis accident or transient. Trip system bus power is assumed to function for accident mitigation sequences; however, this alarm-only instrumentation is not required to maintain or preclude a challenge to that function.

(4) Operating experiences or probabilistic safety assessments have not shown the trip system bus power monitors alarm instrumentation to be significant to public health and safety.

The trip system bus power monitors alarm instrumentation channel requirements specified in TS Tables 3.2.B and 4.2.B will be relocated to the FSAR. Therefore, any changes to these requirements will be strictly controlled by the provisions of 10 CFR 50.59.

4.3 TS Tables 3.2.6 and 4.2.B, and Surveillance 4.5.A.1.d, core spray sparger (header) d/p instrumentation requirements are proposed for relocation to the FSAR.

(1) The core spray sparger (header) d/p instrumentation channels specified in TS 3.2.B and 4.2.B, and Surveillance 4.5.A.1.d, can be used to detect integrity of the core spray piping between the inside of the reactor vessel and the core shroud. However, this instrumentation is not used to detect and indicate in the control room a significant abnormal degradation of the reactor coolant pressure boundary.

(2) The core spray sparger (header) d/p instrumentation channels specified in TS 3.2.6 and 4.2.6, and Surveillance 4.5.A.1.d, are not used as an initial condition of a design basis

Letter 2.04.1 04 Enclosure Page 6 of 9 accident or transient analysis that either assumes the failure of, or presents a challenge to, the integrity of a fission product barrier. Core spray header integrity is assumed, however, this instrumentation is not required to maintain or preclude a challenge to that integrity.

(3) The core spray sparger (header) d/p instrumentation channels specified in TS 3.2.B and 4.2.B, and Surveillance 4.5.A.1.d, are not used as part of the primary success path which functions or actuates to mitigate a design basis accident or transient. Core spray header integrity is assumed for accident mitigation sequences; however, this instrumentation is not required to maintain or preclude a challenge to that function.

(4) Operating experiences or probabilistic safety assessments have not shown the core spray sparger (header) d/p instrumentation channels specified in TS 3.2.B and 4.2.B, and Surveillance 4.5.A.1.d, to be significant to public health and safety.

The core spray sparger (header) d/p instrumentation channels specified in TS 3.2.B and 4.2.B, and Surveillance 4.5.A.1.d, requirements will be relocated to the FSAR. Therefore, any changes to these requirements will be strictly controlled by the provisions of 10 CFR 50.59.

4.4 The structural integrity requirements of TS 3.6.G and 4.6.G are proposed for relocation to the FSAR.

(1) TS 3.6.G and 4.6.G establishes the programmatic elements for conducting ASME Code Class 1, 2, and 3 component inspections by reference to Section Xl of the ASME Code.

The safety basis for establishing programmatic requirements on structural integrity in TS relate to prevention of component degradation and continued long-term maintenance of acceptable structural conditions. Therefore, structural integrity of safety systems are not operational limits that are an initial assumption of any DBA or transient analysis.

Additionally, the inspections stipulated by this specification are not used to detect and indicate in the control room a significant abnormal degradation of the reactor coolant pressure boundary.

(2) The inspections stipulated by TS 3.6.G and 4.6.G do not monitor process variables that are initial assumptions in a DBA or transient analysis.

(3) The ASME Code Class 1, 2, and 3 components inspected per TS 3.6.G and 4.6.G are assumed to function to mitigate accidents. Their capability to perform this function is addressed by other TS. TS 3.6.G and 4.6.G, however, only specifies inspection requirements for these components. Therefore, Criterion 3 is not satisfied.

(4) The TS 3.6.G and 4.6.G requirement is currently covered by 10 CFR 50.55a and the PNPS Inservice Inspection Program. Duplicating regulatory requirements in TS is not a structure, system, or component which operating experience or probabilistic safety assessment has shown to be significant to public health and safety.

The structural integrity requirements of TS 3.6.G and 4.6.G requirements will be relocated to the FSAR. Therefore, any changes to these requirements will be strictly controlled by the provisions of 10 CFR 50.59, as well as 10 CFR 50.55a(g).

4.5 The drywell-suppression chamber vacuum breaker details of operability in 3.7.A.4.a are adequately specified in the associated surveillances and are deleted. The position indication alarm system requirements specified in TS 3/4.7.A.4 are proposed for relocation to the TS Bases.

Letter 2.04.104 Enclosure Page 7 of 9 (1) The drywell-suppression chamber vacuum breaker position indication alarm system is not used to detect and indicate in the control room a significant abnormal degradation of the reactor coolant pressure boundary.

(2) The drywell-suppression chamber vacuum breaker position indication alarm system is not used as an initial condition of a design basis accident or transient analysis that either assumes the failure of, or presents a challenge to, the integrity of a fission product barrier. Maintaining the drywell-suppression chamber vacuum breakers in the closed position is an assumed initial condition; however, this alarm system is not required to maintain, or minimize a challenge to, actual disk position.

(3) The drywell-suppression chamber vacuum breaker position indication alarm system is not used as part of the primary success path, which functions or actuates to mitigate a design basis accident or transient. Proper operation of the drywell-suppression chamber vacuum breakers to relieve negative pressure and otherwise return to the closed position are credited mitigative functions; however, this alarm system instrumentation is not required to assure that function.

(4) Operating experiences or probabilistic safety assessments have not shown the drywell-suppression chamber vacuum breaker position indication alarm system to be significant to public health and safety.

The drywell-suppression chamber vacuum breaker operability details remain unchanged and are adequately assured by the surveillance requirements and by the definition of operability.

The criteria of 10 CFR 50.36(c)(2)(ii) apply to retain the requirement for operability; however, the convention consistent with NUREG-1433 to locate explicit details of operability to Surveillances, the Bases and the FSAR is applied.

Additionally, position indication alarm system requirements will be relocated to the TS Bases and replaced with a new surveillance requirement 4.7.A.4.a.1 to verify each drywell-suppression chamber vacuum breaker is in the closed position at least every 14 days. This is consistent with Standard Technical Specifications for General Electric Plants, BWR/4, NUREG-1 433, Revision 3, Surveillance Requirement (SR) 3.6.1.8.1. Also consistent with NUREG-1433 Bases, the PNPS TS Bases for this surveillance will indicate that the periodic verification may utilize the position indications or by verification of a differential pressure decay rate test. For PNPS, the differential pressure decay rate test will be required when one of the two position indication alarm systems are inoperable as is currently required by action 3.7.A.4.d. This action currently requires verification every 15 days, however, based on the proposed surveillance 4.7.A.4.a.1, this re-verification will be required every 14 days.

The NUREG-1433 SR 3.6.1.8.1 also requires confirmation of drywell-suppression chamber vacuum breaker position (either position indicators or differential pressure decay test) "within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after any discharge of steam to the suppression chamber from the safety/relief valves (S/RVs) or any operation that causes the drywell-to-suppression chamber differential pressure to be reduced by > [0.5] psid." Entergy is not proposing this portion of the NUREG-1 433 surveillance frequency. This situational frequency is not required to be explicitly included.

Normal operational monitoring of the status of plant systems, components, and valve positions has been shown adequate to assure proper valve positions are maintained. The addition of proposed surveillance 4.7.A.4.a.1, which adds a normal periodic verification not imposed in current requirements, provides adequate increased operational focus. This exception, based on historical TS requirements and normal operational monitoring, was similarly approved for the James A. FitzPatrick conversion to Standard TS, Amendment 274, dated July 3, 2002.

Letter 2.04.1 04 Enclosure Page 8 of 9 The corrected component terminology in TS 3.7.A.3.a is editorial and serves to facilitate proper use and application.

The proposed Bases changes are provided for information along with this amendment request.

Any changes to these requirements will be strictly controlled by the provisions of 10 CFR 50.59 and TS 5.5.6, 'Technical Specifications (TS) Bases Control Program."

4.6 TS 3.6.H is a previously "Deleted" Specification. This historical reference to a Specification no long in use is editorially deleted with no impact to any TS requirements.

In conclusion, the above relocated requirements are not required to be in the TS under 10 CFR 50.36 or 182a of the Atomic Energy Act, and are not required to obviate the possibility of an abnormal situation or event giving rise to an immediate threat to the public health and safety. In addition, sufficient regulatory controls over the relocated requirements exist (e.g., 10 CFR 50.59, 10 CFR 50.55a(g), and TS 5.5.6) to assure continued protection of public health and safety.

5. Regulatory Safety Analysis 5.1 No Significant Hazards Consideration Entergy Nuclear Operations, Inc. (Entergy) is proposing to modify the Pilgrim Technical Specifications (TS) to relocate various requirements from the TS to the Final Safety Analysis Report (FSAR) or TS Bases. These requirements do not meet the criteria for inclusion in the TS as presented in 10 CFR 50.36(c)(2)(ii).

Entergy has evaluated whether or not a significant hazards consideration is involved with the proposed amendment(s) by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:

1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No. The proposed relocations are administrative in nature and do not involve the modification of any plant equipment or affect basic plant operation. The associated instrumentation and inspections are not assumed to be an initiator of any analyzed event, nor are these limits assumed in the mitigation of consequences of accidents.

Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No. The proposed change does not involve any physical alteration of plant equipment and does not change the method by which any safety-related system performs its function. As such, no new or different types of equipment will be installed, and the basic operation of installed equipment is unchanged.

The methods governing plant operation and testing remain consistent with current safety analysis assumptions. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.

Letter 2.04.104 Enclosure Page 9 of 9

3. Does the proposed change involve a significant reduction in a margin of safety?

Response: No. The proposed changes to relocate current TS requirements to the FSAR, consistent with regulatory guidance and previously approved changes for other stations, are administrative in nature. These changes do not negate any existing requirement, and do not adversely affect existing plant safety margins or the reliability of the equipment assumed to operate in the safety analysis. As such, there are no changes being made to safety analysis assumptions, safety limits or safety system settings that would adversely affect plant safety as a result of the proposed change. Margins of safety are unaffected by requirements that are retained, but relocated from the Technical Specifications to the FSAR. Therefore, the proposed change does not involve a significant reduction in a margin of safety.

Based on the above, Pilgrim concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of 'no significant hazards consideration" is justified.

5.2 Environmental Consideration A review has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need to be prepared in connection with the proposed amendment.

6. Precedents The NRC has approved similar changes (e.g., relocation of specifications which do not meet the criteria of 10 CFR 50.36(c)(2)(ii)) in a number of amendments. Examples include Pilgrim Nuclear Power Station amendment No. 202 dated July 21, 2003. Similar regulatory criteria based relocations, as well as consistent presentation of new surveillance for drywell-suppression chamber vacuum breakers, are consistent with James A. FitzPatrick conversion to Standard TS, Amendment 274, dated July 3, 2002.
7. References
1. 10 CFR 50.36, 'Technical Specifications"
2. NUREG-1433, Rev. 3, "Standard Technical Specifications, General Electric Plants, BWR/4"
3. Pilgrim Nuclear Power Station, amendment No. 202 dated July 21, 2003
4. James A. FitzPatrick conversion to Standard TS, Amendment 274, dated July 3, 2002

ATTACHMENT 1 PROPOSED TECHNICAL SPECIFICATION AND BASES CHANGES (MARK-UP)

PNPS TABL1E 4.1.1 REACTOR PROTECTION SYSTEM (SCRAM) INSTRUMTATION FUNcTION&L TESTS MINIMUK FUNCTIONAL TEST FREQUENCIES FOR SAFETY INSTRUMENTATION AND CONTROL CIRCUITS Functional Test M(Inimum Frecquency (3)

Mode Switch in Shutdown Place Mode Switch in Shutdown Each Refueling Outage Manual Scrars Trip Channel and Alarm Every 3 Months RPS Channel Test Switch (5) Trip Channel and Alarm Once per week IRK High Flux Trip Channel and Alarm (4) Once Per Week During IRefueling and Before Each 'Startup Inoperative .- Trip Channel and Ala Once Per Week Durin 1Refueling LI 6.- --.

UHO ro aii D1CLULD C ULLU APRM High Flux Trip Output Relays (4) Every 3 Months (7)

Inoperative Trip Output Relays (4) Every 3 Months Flow Bias Trip Output Relays (4) Every 3 Months High Flux (15%) Trip Output Relays (4) Once Per Week During Refueling and Before Each Startup High Reactor Pressure Trip Channel and Alarm 4) Every 3 Months High Drywell Pressure Trip Channel and Alarm 4) Every 3 Months Reactor Low Water Level Trip Channel and Alarm 4) Every 3 Months High Water Level in Scram Discharge Tanks Trip Channel and Alarm 4) Every 3 Months Main Steam Line Isolation Valve Closure Trip Channel and Alarm Every 3 Months Turbine Control Valve Fast Closure Trip Channel and Alarm Every 3 Honths Turbine First Stage Pressure Permissive Trip Channel and Alarm 4) Every 3 Months Turbine Stop Valve Closure Trip Channel and Alarm Every 3 Months Reactor Pressure Permissive Trip Channel a (4) Every 3 Months Amendment No. 7?9- 99 1177-1477-152;-1544 3/4 .1-5

.I/

PnPS TABLE 3.2.B (Cont)

INSTRUNENTATION TRT IPITIAT&S OR CONTROLS THE CORE AND CONTAINKMr COOLING SYSTZMS Hinimura # of Operable Instrument Trip Function Trip Level Setting Renarks Channels Per Trip System (1) 1 RH (LPCI) Trip Systf ?m NA Monitors availability of power bus power monitor to logic systems.

NA Monitors availability of power 1 Core Spray Trip SystE bus power monitor to logic systems.

1 ADS Trip System bus NA Monitors availability of power power nonitor to logic systems and valves.

1 HPCI Trip System bus NA Monitors availability of power power monitor to logic systems.

1 RCIC Trip System bus NA Monitors availability of power to logic systeus.

, poe nto .

-. A Al- el) nsid Operates RUR (LPGI) break detection logic Recitrculatlon Map A drp - P-which directs cooling water 2 Recirculatlon Pump B d/p S2 psid into unbroken recirculation loop, 2 Recirculation Jet Pump 0.5<p<1.5 psid Riser d/p A>B A"A"Anbarr Nn 14 1 3/4.2-15

PNPS TABLE4ZB MINIMUM TEST AND CALIBRATION FREQUENCY FOR CSCS InsuMnt Channel Inshumont Functional Test Calibration Frequencv Instrument Check

1) ReactorWaterLevel (1)(7) (7) Once/day
2) Drywell Pressure (1)(7) (7) Once/day
3) Reactor Pressure (1)(7) (7) . Oncelday
4) Auto Sequencing imers NA OnceOperating Cycle None
5) ADS - LPCI or CS Pump Disch.

Pressure fntetiock (1) Once/3 months None

6) Start-up Tratisf. (4160V) a) Loss of Voltago Relays Monthly OnceA~pemting Cycle None b) Degraded Voltage Relays Monthly. Once/Operating Cycle None 7) 9PQgY
8) Recirculafon System (1) Once/3 months Once/day
9) em On o. on a
10) Steam Une IHigh Flow (HPCI & RCIC) (1) Once/3 months None
11) Steam UIneq High Temp. (HPCI &RCIC) (1) Once/24 months None I.
12) Safeguards Area High Temp. (1) Oncet24 months None Amendment No. 4, , 3/4.2-32

LIMITING COb!DlInONS FOR OPERATION SURVEI1LANCE RECUIR9MENTS 3.5 CORE AND CONTAINMENT COOLING 4.5 COQE AND CONTAINMENT COOQUNG SYSTEMS SYSTEMS A. Core Spray and LPCI Systems (Cont) A. orgaSorg And LPCI Sytems (Cont).

4; During Run, Startup, and Hot Shutdown 1. c. Motor As Specified Modes with the LPCI system Inoperable, .

Operated In 3.13 .

restore the LPCI system to Operable Valve status within 7 days and maintain both core spray systems and the diesel generators Operable. Otherwise, be In at least Cold Shutdown within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

5. Two low pressure injection/spray subsystems shall be Operable during Cold Shutdown and Refuel Modes unless the rector head Is removed, the spent fuel pool gates are removed, and water level Is at greater than or equal to elevation 114 foot, except as specified In 3.5.A.6. 2. This section intentionally left blank
6. During Cold Shutdown and.Refuel
  • Modes unless the reactor head Is removed, the spent fuel pool gates are 3. LPCI system testing shall be as follows:

removed, and water level is at greater than or equal to elevation 14 foot a. Simulated . Once/

Automatic Operating

a. With one of the required low pressure Actuation Test Cycle lnjectlonfspray subsystems Inoperable, restore the Inoperable b. Pump When tested required low pressure injectionlspray Operability. as specified In subsystem to Operable status within 3.13, verify that 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Otherwise, take immediate each LPCI pump action to suspend actvities with delivers potential for draining the reactor 4800 GPM at a vessel. head across the
b. With both of the required low pump of at least pressure Injection/spray subsystems 380 ft.

Inoperable, take immediate action to suspend activities with potential for c. Motor As Specified

- draining the reactor vessel and Operated In 3.13 restore I low pressure Valve Injectionl/pray subsystem to Operability Operable status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Otherwise, take Immediate action to restore secondary containment and one standby gas treatment system to Operable status and to restore Isolation capablffty In each roquired secondary containment penetration flow path not Isolated.

Amendment No. 1-Gus.,i4 314.5-2

LIMITING CONDITIONS FOR OPERATIO1S SURVEILLANCE REQUIREMENTS 3.6 PRIMARY SYSTEM BOUNDARY (Cont) 4.6 PRIMARY SYSTEM BOUNDARY (Cont)

F. Jet Pump Flow Mismatch P. Jet Pump Flow Mismatch

1. Whenever both recirculation Recirculation pump speeds shall be pumps are in operation, pump checked and logged at least once speeds shall be maintained per day.

within 10% of each other when power level is greater than 80%

and within 15% of each other when power level is less than or equal to 80%.

2. If Specification 3.6.F.1 is exceeded immediate corrective action shall be taken. If recirculation pump speed mismatch is not corrected within 30 minutes, an orderly Stru a shutdown shall be initiated and l/

the reactor shall be in the I ervice inspection components Cold Shutdown condition within shall be performed accordance 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless the with the PNPS Ins rvice Inspection recirculation pump speed Program. The sults obtained mismatch is brought within from complia e with this progr limits sooner. will be ev uated at the completi of each ten year tructuro G. nteritv /interv . The conclusion of this

1. Th structural integrity of the eval ation will be revi ed with imary system bounda shall be maintained at the evel required by the AS Boiler and Pressure Vessel de,Section XI "Rules for I service Inspection of uclear Power Plant Compo nts," Articles IWA, IWB, .C, IWD and IWF a mandator appendices as requir by IOCFR50.55a(g exce where specific r ief haXbeen granted by th NRC prsuant to/

CFR50.55a(g)(6)(.

Amendment No. 19;-93;-'4- 3-3 .3 _, -3

. w--

a

BASS: //

3/4.6 XPI ARY SYSX BUNDARY (Cont) .

G; ,uc ural I ta rit/

Th Igrim Nuclear Po r Station Inservice Inspection P ram conforms to the requirents o0 CFR5.65a(g). ere practical, the Inspection S E Section XI Class 1, 2, 3 mponents confos to the edition and addenda action XI of the ASME BoleInd fPresure VeOse ed required by IOCFR50.6Xg). When Implementation of SME Code requfred Inspe on has been determined toXimpractical for PNPS, a reque for relief from the Inspect requirement Is submitted toe NRC In accordance wdth 10 50.55a(g)(5)(11).

Reque for relief from the ASME e Inspection requirements wllsubmitted to the NRC prior the beginning of each 10 rInspection Interval for which e Inspecon requirement Is knn .to be Impractical. Requ for relief from Inspection re rements whIch are Identified to boimpractical during the cou of the Inspection Interval will reported to the NRC on an nnua bas trougjhout th ~pqctlon Interval. . /

(R>°> #g&)

ee-A 10 0I fAtGs )

R e ~iskm-2e9

-E3BY4.6-i -

LIMITING CONDITION FOR OPEATION SURVEILLANCE REQUIREMENT 3.7 CONTAINMENT-SYSTEMS (Cont) 4.7 CONTAINMENT SYSTFMS (Cont)

A. PrImary Containment (Cont) A. Primary Containment (Cont)

3. Pressure Suppression Chamber - 3. Pressure Suppression Chamber -

Reactor Building Vacuum Reactor Building Vacuum Brealcers Breakers

a. Except as specified in a. Verify operability of the 3.7.A.3.b below, two pressure suppression pressure suppression chamber chamber-reactor building

- reactor building vacuum vacuum breakers as specified breakers shall be operable in 3.13.

at all times when primary containment integrity is b. Check. the associated required. The setpoint of instrumentation including the differential pressure set points for proper instrumentation which operation every three actuates the pressure months.

suppression chamber -

reactor building breakers shall be 0.5 psig.

b. From and after the date that one of the pressure suppression chamber -

reactor building vacuum breakers is made or found to be inoperable for any reason, reactor operation is permissible only during the succeeding seven days unless

4. pDrywell-Pressure Suppression such vacuum breaker is sooner made operable, _.._--

IChambehr VAcUmi B.reakars ^

provided that the repair a. Periodic Operability Tests procedure does not violate 1. l A primary containment 7Once each month each integrity. drywell-pressure suppression chamber

4. Dnr-ell-Pressure SupDression vacuum breaker shall be Chazmber Vacuum Breakers exercised and the operability of the valve
a. When primary containment is gm -stal-& oi=n required, all drywell-pressure suppression chamber vacuum breakers shall be verified.

operable except during j A drywell to suppression testing and as stated in SpecificationK 3.7 .A. 4.bl 3. chamber differential pressure decay rate test bolow . I.rD11 -

shall be conducted at least every 3 months.

oor~am _b.. z U evw leze eperabl1 hf-

-Re'!iioxn 17-Amendment No. 681-j 3/4.7-7

LIMITING CONDITION FOR OPERATIONS SURVEILLANCE REQUIREMENTS 3.7 CONTAINMENT SYSTEMS (Cont) 4.7 CONTAINMENT SYSTEMS (Cont)

A. Primary Containment (Cont) A. Primary Containment (Cont)

b. During each refueling interval:
1. Each vacuum breaker shall be tested to determine that the disc opens freely to the touch and returns to the closed position by gravity with no indication of bindirig.
2. Vacu reaker posi on calibraeXd /

functio l e .)

3. At least 25% of the vacuum breakers shall be visually inspected such that all vacuum breakers shall have been inspected following every fourth refueling interval. If

,Any dry -suppres on deficiencies are found, chamb vacuum b aker may all vacuum breakers shall be on-fully c sed as be visually inspected and etermined b the position deficiencies corrected.

switches ovided that th drywell o suppression 4. A drywell to suppression chambI differential ecay chamber leak rate test ra is demonstrat to be shall demonstrate that t greater than 5% of the the differential pressure Dfferential sssr eB decay rate does not rate for the aimu exceed the rate which allowable pass arso would occur through a 1 inch orifice without the addition of air or Reactor operation may nitrogen.

continue provided that no more than 2 of the drywell-pressure suppression chamber vacuum breakers are determined to be inoperable provided that they are secured or known to be in the closed position.

6 8 Amendment No.  ;-8 7 T- 49

.-13/7- 3/4.7-8

LIMITING CONDITION FOR OPERATION SU[RVEILLANCE REQUIREHENTS (Cant) 4.7 CONTAINIIENT SYSTEMS (Cant)

A.

If zfailure 9 o one of the twa Installed osition alarm

.Ystems occu B for one or wmore vac breakers, reactor eration may contin ~provided that liffs ential pressure ecay rate test is initia d (

i ediatoly and pe ared a ry 15. days thg eafter ntil the fail e is corrected.s test shall meet the re irements /

Specific o4

5. Oxvgen Concentration
  • 5. Oxvyen Concentration

.a. The primary containment atmosphere shall be reduced The primary containment oxygen concentration shall be measured to less than 4% oxygen by volume with nitrogen gas and recorded at least twice weekly.

during reactor power

.operation with reactor coolant pressure above 100 psig, except as specified in 3.7.A.5.b.

b. Within the 24-hour period subsequent to placing the reactor in the Run mode .

following a shutdown, the containment atmosphere oxygen concentration shall be reduced to less than 4%

by volume and maintained in this condition. De-inercing may commence 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to a shutdown.

6; If the specifications of 3.7.A.1 thru 3.7.A.5 cannot be met, an orderly shutdown shall be initiated and the reactor shall be in Cold Shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Amendment No. 87,-ll3 , 3/4.7-S

BASES:

3/4.7 CONTAINMENT SYSTEMS (Cont)

A: Prima Contalment (Con eactor operation is not permitted if differential pressure decay rate is demonstrated to exceed 26% of allowable, thus providing a margin of safety for the primary containment In the event of a small break In the prmary system.

Each drywall suppression chamber vacuum breaker Is equipped with three switches.

One switch provides full open Indication only. Another switch provides closed indication and an alarm should any vacuum breaker come off Its closed seat by greater than 3/32". The third switch provides a separate a_ alarm should any vacuum breaker come off Its closed seat by greater than 3/32". 1Tht a bov 5 Ed The water In the suppression chamber Is used only for cooling In the event of an accident; I.e., It Is not used for normal operation; therefore, a dally check of the temperature and volume Is adequate to assure that adequate heat removal capability is present.

Inertina The relatively small containment volume inherent In the GE-BWR pressure suppression containment and the large amount of zirconium In the core are such that the.

occurrence of a very limited (a percent or so) reaction of the zirconium and steam during a loss-of-coolant accident could lead to the liberation of hydrogen combined with an air atmosphere to result In a flammable concentration In the containment. If a

  • sufficient amount of hydrogen Is generated and oxygen Is available in stoichliometric quantities, the subsequent Ignition of the hydrogen In rapid recombination rate could lead to failure of the containment to maintain a low leakage Integrity. The 4% oxygen concentration minimizes the possibility of hydrogen combustion following a loss-of-coolant.

Thb occurrence of primary system leakage following a major refueling outage or other scheduled shutdown is much more probable than the occurrence of the loss-of-coolant accident upon which the specified oxygen concentration limit Is based. Permitting access to the drywell for leak inspections during a startup is judged prudent In terms of the added plant safety offered without significantly reducing the margin of safety.

Thus, to preclude the possibility of starting the eactor and operating for extended periods of time with significant leaks In the primary system, leak Inspections are scheduled during startup periods, when the primary system is at or near rated operating temperature and pressure. The 24-hour period to provide Inerting is judged to be sufficient to perform the leak inspection and establish the required oxygen concentration.

'operation. Nitrogen used for Inerting could leak out of the containment but air could not leak in to increase oxygen concentration. Once the containment Is filled with nitrogen to the required concentration, no monitoring of oxygen.concentration is necessary. However, at least twice a week the oxygen concentration will be determined as added assurance. Mark I Containment Long Term Program testing showed that maintaining a drywell to Revision 4A,/-

_ /133/4.7-7

INSERT page B3/4.7-7 These position switches and installed alarm systems are calibrated and functionally tested each refueling interval.

Surveillance 4.7.A.4.a.1 is normally performed by observing the vacuum breaker position indications. If one of the two installed position alarm systems indicates any vacuum breaker may be non-fully closed, a differential pressure decay rate test is performed to verify that the vacuum breakers are closed. This method of verification can continue to meet 4.7.A.4.a.1 every 14 days thereafter until the indication failure is corrected. The test is satisfied If the drywell to suppression chamber differential decay rate is demonstrated to be not greater than 25% of the differential pressure decay rate for the maximum allowable bypass area of 0.2ft 2. If this test fails, one or more drywell-pressure suppression chamber vacuum breakers is considered open. As such, with failure of the position alarm system(s), ... <<add existing Bases as shown in markup>>

ATTACHMENT 2 LIST OF REGULATORY COMMITMENTS

List of Regulatory Commitments The following table identifies those actions committed to by Pilgrim in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

REGULATORY COMMITMENT DUE DATE Relocate specified requirements to the Within 60 days of license amendment approval.

FSAR and TS Bases.