NRC 2002-0001, Information Regarding Point Beach Nuclear Plant Operating Licenses | 2 January 2002 | Information Regarding Point Beach Nuclear Plant Operating Licenses | |
NRC 2002-0005, Status Report for Point Beach Nuclear Plant Fire Protection & Appendix R Rebaselining Project | 10 January 2002 | Status Report for Point Beach Nuclear Plant Fire Protection & Appendix R Rebaselining Project | |
NRC 2002-0007, Response to Non-Cited Violation Concerning Adequacy of Fire Suppression System, Per IRs 05000266/2001-012 (DRS) & 05000301/2001-012 (DRS) | 14 January 2002 | Response to Non-Cited Violation Concerning Adequacy of Fire Suppression System, Per IRs 05000266/2001-012 (DRS) & 05000301/2001-012 (DRS) | Fire Protection Program |
NRC 2002-0008, Commitment Date Change Re Control Room Habitability | 11 January 2002 | Commitment Date Change Re Control Room Habitability | |
NRC 2002-0010, Technical Specification Bases B3.3.1 Revision for Point Beach Nuclear Plant, Units 1 and 2 | 17 January 2002 | Technical Specification Bases B3.3.1 Revision for Point Beach Nuclear Plant, Units 1 and 2 | |
NRC 2002-0016, ASME Section XI Inservice Testing Program Fourth Interval Relief Requests VRR-1 and PRR-1 | 13 February 2002 | ASME Section XI Inservice Testing Program Fourth Interval Relief Requests VRR-1 and PRR-1 | |
NRC 2002-0019, License Amendment Request 224 Control Room Habitability | 28 February 2002 | License Amendment Request 224 Control Room Habitability | High Radiation Area Deep Dose Equivalent Pressure Boundary Leakage Power change Unidentified leakage Power Uprate |
NRC 2002-0020, Fourth Ten-Year Snubber Testing Interval Relief Request SP-1 | 11 March 2002 | Fourth Ten-Year Snubber Testing Interval Relief Request SP-1 | |
NRC 2002-0024, Fourth Interval Inservice Inspection Program, Plan & Schedule | 22 March 2002 | Fourth Interval Inservice Inspection Program, Plan & Schedule | VT-2 |
NRC 2002-0025, March 2002 Monthly Operating Report for Point Beach Nuclear Plant Units 1 & 2 | 15 April 2002 | March 2002 Monthly Operating Report for Point Beach Nuclear Plant Units 1 & 2 | |
NRC 2002-0028, Reactor Vessel Clossure Head Penetration Repair Relief Requests MR 02-004-1 and MR-02-004-2 | 17 April 2002 | Reactor Vessel Clossure Head Penetration Repair Relief Requests MR 02-004-1 and MR-02-004-2 | Nondestructive Examination Liquid penetrant Dissimilar Metal Weld |
NRC 2002-0029, Revised Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | 18 April 2002 | Revised Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | Boric Acid VT-2 Pressure Boundary Leakage Through-Wall Leak |
NRC 2002-0030, License Amendment Request 226, Measurement Uncertainty Recapture Power Uprate | 30 April 2002 | License Amendment Request 226, Measurement Uncertainty Recapture Power Uprate | Shutdown Margin Post Accident Monitoring Hydrostatic Pressure and Temperature Limits Report Process Control Program Safeguards Contingency Plan License Renewal Exemption Request Fuel cladding Flow Induced Vibration Power Uprate Measurement Uncertainty Recapture Affidavit |
NRC 2002-0031, Ltr Dated 04/30/02 2001 Annual Monitoring Report Point Beach Nuclear Plant, Units 1 and 2 | 30 April 2002 | Ltr Dated 04/30/02 2001 Annual Monitoring Report Point Beach Nuclear Plant, Units 1 and 2 | Offsite Dose Calculation Manual |
NRC 2002-0037, Supplement to Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | 9 May 2002 | Supplement to Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | Boric Acid |
NRC 2002-0038, Supplement to Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles. | 9 May 2002 | Supplement to Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles. | Boric Acid Pressure Boundary Leakage |
NRC 2002-0041, Submittal of ECCS Evaluation Model Changes, Per 10CFR50.46 | 10 May 2002 | Submittal of ECCS Evaluation Model Changes, Per 10CFR50.46 | |
NRC 2002-0042, Video Presentation of Unit 2 Reactor Pressure Vessel Head Insulation Removal and Inspection | 13 May 2002 | Video Presentation of Unit 2 Reactor Pressure Vessel Head Insulation Removal and Inspection | |
NRC 2002-0043, and Point Beach, Units 1 & 2 - NRC Bulletin 2002-01: Reactor Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity - 60 Day Response | 16 May 2002 | and Point Beach, Units 1 & 2 - NRC Bulletin 2002-01: Reactor Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity - 60 Day Response | Boric Acid VT-2 Through-Wall Leak |
NRC 2002-0044, Fourth Ten-Year Snubber Testing Interval, Request for Withdrawal of Relief Request SP-1 | 15 May 2002 | Fourth Ten-Year Snubber Testing Interval, Request for Withdrawal of Relief Request SP-1 | |
NRC 2002-0045, Request Withdrawal of Relief Request MR-02-004-1 and MR-02-004-2 | 15 May 2002 | Request Withdrawal of Relief Request MR-02-004-1 and MR-02-004-2 | |
NRC 2002-0046, Completed Evaluation of Degraded Fire Barrier, Point Beach Nuclear Plant, Unit 1 & 2 | 4 June 2002 | Completed Evaluation of Degraded Fire Barrier, Point Beach Nuclear Plant, Unit 1 & 2 | Fire Barrier |
NRC 2002-0047, License Amendment Request 227 Technical Specification LCO 3.8.1, AC Sources - Operating | 29 May 2002 | License Amendment Request 227 Technical Specification LCO 3.8.1, AC Sources - Operating | Safe Shutdown Anticipated operational occurrence |
NRC 2002-0048, (Pbnp), Units 1 & 2, Degraded Fire Barrier | 4 June 2002 | (Pbnp), Units 1 & 2, Degraded Fire Barrier | Safe Shutdown Fire Barrier Hourly Fire Watch |
NRC 2002-0049, May 2002 Monthly Operating Report for Point Beach Units 1 & 2 | 5 June 2002 | May 2002 Monthly Operating Report for Point Beach Units 1 & 2 | |
NRC 2002-0050, to License Amendment Request 229 TS LCO 3.5.2, ECCS-Operating, & LCO 3.5.3, ECCS-Shutdown | 30 May 2003 | to License Amendment Request 229 TS LCO 3.5.2, ECCS-Operating, & LCO 3.5.3, ECCS-Shutdown | Stroke time |
NRC 2002-0051, License Amendment Request 228, Technical Specifications LCO 3.1.8 Physics Tests Exceptions - Mode 2 | 11 June 2002 | License Amendment Request 228, Technical Specifications LCO 3.1.8 Physics Tests Exceptions - Mode 2 | Shutdown Margin |
NRC 2002-0058, June 2002 Monthly Operating Report for Point Beach Units 1 & 2 | 9 July 2002 | June 2002 Monthly Operating Report for Point Beach Units 1 & 2 | |
NRC 2002-0059, Submittal of Request for Relief No. 3 Risk-Informed Inservice Inspection Program | 3 July 2002 | Submittal of Request for Relief No. 3 Risk-Informed Inservice Inspection Program | Mission time Internal Flooding Probabilistic Risk Assessment Nondestructive Examination VT-2 Large early release frequency |
NRC 2002-0060, Clarification of Information Re License Amendment Request 227, Technical Specification LCO 3.8.1, AC Sources - Operating | 12 July 2002 | Clarification of Information Re License Amendment Request 227, Technical Specification LCO 3.8.1, AC Sources - Operating | |
NRC 2002-0063, Research Institute Report TR-113594, Resolution of Generic Letter 96-06 Waterhammer Issues, Volumes 1 & 2 | 30 July 2002 | Research Institute Report TR-113594, Resolution of Generic Letter 96-06 Waterhammer Issues, Volumes 1 & 2 | Flow Induced Vibration Coast down |
NRC 2002-0064, Revisions to Security Plan & Security Training & Qualification Plan | 1 August 2002 | Revisions to Security Plan & Security Training & Qualification Plan | |
NRC 2002-0065, Submittal of Changes to Correspondence Service List Point Beach Nuclear Plant, Units 1 & 2, Kewaunee Nuclear Power Plant, from Nuclear Management Co., LLC | 9 August 2002 | Submittal of Changes to Correspondence Service List Point Beach Nuclear Plant, Units 1 & 2, Kewaunee Nuclear Power Plant, from Nuclear Management Co., LLC | |
NRC 2002-0067, Fourth Interval Inservice Inspection Program Relief Request No. 10 Drawings | 15 August 2002 | Fourth Interval Inservice Inspection Program Relief Request No. 10 Drawings | |
NRC 2002-0068, Reply to Notice of Violation (EA-02-031) to IRs 05000266-01-017 & 05000301-01-017 | 12 August 2002 | Reply to Notice of Violation (EA-02-031) to IRs 05000266-01-017 & 05000301-01-017 | Significance Determination Process |
NRC 2002-0069, Filing of Owner'S Inservice Inspection Summary Report | 15 August 2002 | Filing of Owner'S Inservice Inspection Summary Report | Packing leak Hydrostatic Nondestructive Examination VT-2 Moisture barrier Liquid penetrant Through Wall Leak Through-Wall Leakage |
NRC 2002-0070, ASME Section X1 Inservice Testing Program Request for Withdrawal of Fourth Interval Relief VRR-1 | 15 August 2002 | ASME Section X1 Inservice Testing Program Request for Withdrawal of Fourth Interval Relief VRR-1 | |
NRC 2002-0071, Response to Request for Additional Information for License Amendment Request 223 Technical Specification LCO 3.6.4, Containment Pressure | 19 August 2002 | Response to Request for Additional Information for License Amendment Request 223 Technical Specification LCO 3.6.4, Containment Pressure | |
NRC 2002-0072, Fitness-for-Duty (FFD) Program | 21 August 2002 | Fitness-for-Duty (FFD) Program | Fitness for Duty |
NRC 2002-0073, Reactor Vessel Closure Head Penetration Repair Relief Requests MR 02-018-1 and MR 02-018-2 | 28 August 2002 | Reactor Vessel Closure Head Penetration Repair Relief Requests MR 02-018-1 and MR 02-018-2 | Nondestructive Examination Liquid penetrant Dissimilar Metal Weld |
NRC 2002-0075, Responses to Request for Additional Information License Amendment Request 226, Measurement Uncertainty Recapture Power Uprate | 29 August 2002 | Responses to Request for Additional Information License Amendment Request 226, Measurement Uncertainty Recapture Power Uprate | Boric Acid Anticipated operational occurrence Exemption Request Downpower Flow Induced Vibration |
NRC 2002-0077, Corrected Page 109 to Relief Request 10 Requesting Alternative to Requirement to Examine All Three Regenerative Heat Exchanger Vessels | 4 September 2002 | Corrected Page 109 to Relief Request 10 Requesting Alternative to Requirement to Examine All Three Regenerative Heat Exchanger Vessels | High Radiation Area |
NRC 2002-0078, August 2002 Monthly Operating Report for Point Beach Units 1 & 2 | 9 September 2002 | August 2002 Monthly Operating Report for Point Beach Units 1 & 2 | |
NRC 2002-0079, Changes to Correspondence Service Lists | 13 September 2002 | Changes to Correspondence Service Lists | |
NRC 2002-0080, Response to Request for Additional Information License Amendment Request 223 Technical Specification LCO 3.6.4, Containment Pressure | 12 September 2002 | Response to Request for Additional Information License Amendment Request 223 Technical Specification LCO 3.6.4, Containment Pressure | Boric Acid |
NRC 2002-0081, License Amendment Request 229 Technical Specifications LCO 3.5.2, ECCS - Operating, & LCO 3.5.3, ECCS - Shutdown | 12 September 2002 | License Amendment Request 229 Technical Specifications LCO 3.5.2, ECCS - Operating, & LCO 3.5.3, ECCS - Shutdown | Stroke time |
NRC 2002-0082, Day Response to NRC Bulletin 2002-02: Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs | 12 September 2002 | Day Response to NRC Bulletin 2002-02: Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs | Boric Acid Nondestructive Examination Pressure Boundary Leakage Through-Wall Leak |
NRC 2002-0083, Reporting of Fire Barriers Degraded for More than Seven Days | 26 September 2002 | Reporting of Fire Barriers Degraded for More than Seven Days | Safe Shutdown Fire Barrier Fire Protection Program Hourly Fire Watch |
NRC 2002-0084, Transmittal of Post Accident Monitoring Instrumentation Report | 26 September 2002 | Transmittal of Post Accident Monitoring Instrumentation Report | Post Accident Monitoring |
NRC 2002-0085, Clarification of Safety Evaluation, License Amendments 204 & 209 Technical Specification LCO 3.8.1, AC Sources - Operating (TAC Nos. MB5198 & MB5199) | 30 September 2002 | Clarification of Safety Evaluation, License Amendments 204 & 209 Technical Specification LCO 3.8.1, AC Sources - Operating (TAC Nos. MB5198 & MB5199) | |