Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, Wl 54241 NMC 920.388.2560 920.755.2321 Committed to Nuclear Excellence Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0020 March 11, 2002 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station P 1-17 Washington, DC 20555-0001 Ladies/Gentlemen:
Dockets 50-266 and 50-301 Fourth Ten-Year Snubber Testing Interval Relief Request SP-1 Point Beach Nuclear Plant, Units 1 and 2 In accordance with 10 CFR 50.55a(f)(6)(i) Nuclear Management Company, LLC, operator of the Point Beach Nuclear Plant (PBNP), is requesting relief from specific code requirements relief is requested from the Code for Operation and Maintenance of Nuclear Power Plants, 1995 Edition with 1996 Addenda, Subsection ISTD, during the Fourth Ten-Year Snubber Testing Interval.
The testing of hydraulic shock suppressors (snubbers) at PBNP Units 1 and 2 is currently performed in accordance with ASME OM-4, 1987 Edition. A 120-month periodic update of the inservice testing (IST) program is being performed in accordance with 10 CFR 50.55a. To allow for consistency and proper maintenance of inservice testing requirements, the snubber test program will also be updated in accordance with 10 CFR 50.55a.
In accordance with 10 CFR 50.55a(a)(3)(i), PBNP requests relief from Subsection ISTD 7.5.3 requirements. [The ISTD requirement is to make the snubbers attached to the steam generator one separate defined test group plan (DTGP).] PBNP requests that the snubbers attached to the steam generator and the main steam line be considered one DTPG. Attached relief request SP-1 provides the basis for this request. The relief request will be implemented during the Fourth Ten-Year Snubber Test Program examination interval that begins on September 1, 2002, for Unit 1 and on October 1, 2002, for Unit 2.
Please contact us if there are any questions regarding this relief request.
Sincerely, Thomas J. Webb Regulatory Affairs Manager Attachment cc:
NRC Resident Inspector NRR Project Manager NRC Regional Administrator PSCW
NRC 2002-0020 Page 2 bcc:
R. A. Anderson R. R. Grigg (P460)
K. E. Peveler D. A. Weaver (P129)
T.H. Taylor A. J. Cayia R. G. Mende R. P. Pulec T. J. Webb C. T. Prothero K. M. Duescher (3)
L. Schofield (JOSRC)
M. E. Reddemann E. J. Weinkam III File