NOC-AE-00000341, 2RE07 Refueling Outage Inservice Inspection Summary Report for Steam Generator Tubing | 3 February 2000 | 2RE07 Refueling Outage Inservice Inspection Summary Report for Steam Generator Tubing | |
NOC-AE-00000966, Annual Financial Reports | 22 November 2000 | Annual Financial Reports | Enforcement Discretion Incorporated by reference Stolen |
NOC-AE-01001181, Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for Weld Examinations (Relief Request RR-ENG-38) | 18 September 2001 | Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for Weld Examinations (Relief Request RR-ENG-38) | Nondestructive Examination Liquid penetrant |
NOC-AE-01001199, Part 1 - South Texas Project, Units 1 and 2, Annual Financial Reports | 4 October 2001 | Part 1 - South Texas Project, Units 1 and 2, Annual Financial Reports | Incorporated by reference |
NOC-AE-01001214, Proposed Changes to Loss of Power & AC Sources Technical Specifications | 14 February 2002 | Proposed Changes to Loss of Power & AC Sources Technical Specifications | Safe Shutdown Shutdown Margin Earthquake Offsite Circuit |
NOC-AE-02001233, CFR50.46 Annual Report of ECCS Model Revisions | 9 January 2002 | CFR50.46 Annual Report of ECCS Model Revisions | |
NOC-AE-02001234, Response to Request for Additional Information Re risk-informed Inservice Inspection Application for Section XI Examination Requirements for Class 1 & 2 Piping Welds (RR-ENG-2-23) | 10 January 2002 | Response to Request for Additional Information Re risk-informed Inservice Inspection Application for Section XI Examination Requirements for Class 1 & 2 Piping Welds (RR-ENG-2-23) | Probabilistic Risk Assessment VT-2 Large early release frequency |
NOC-AE-02001235, Submittal of Revision 15, Operations Quality Assurance Plan | 7 January 2002 | Submittal of Revision 15, Operations Quality Assurance Plan | Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Large early release frequency Exemption Request Fire Protection Program |
NOC-AE-02001237, Proposed Amendment to Technical Specification 3/4.6.1.7, Containment Ventilation System | 18 February 2002 | Proposed Amendment to Technical Specification 3/4.6.1.7, Containment Ventilation System | Probabilistic Risk Assessment Large early release frequency |
NOC-AE-02001238, Supplemental Response to Request for Additional Information Regarding the 2RE08 Steam Generator Tube Voltage-Based Repair Criteria 90-Day Report | 9 January 2002 | Supplemental Response to Request for Additional Information Regarding the 2RE08 Steam Generator Tube Voltage-Based Repair Criteria 90-Day Report | |
NOC-AE-02001243, Response to NRC Regulatory Issue Summary 2001-21 | 17 January 2002 | Response to NRC Regulatory Issue Summary 2001-21 | |
NOC-AE-02001244, Technical Specification Bases Change | 10 January 2002 | Technical Specification Bases Change | |
NOC-AE-02001248, Inservice Inspection Summary Reports for Repairs and Replacements and for System Pressure Tests - 1RE10 | 15 January 2002 | Inservice Inspection Summary Reports for Repairs and Replacements and for System Pressure Tests - 1RE10 | VT-2 |
NOC-AE-02001249, Additional Information to Support the Request for Approval of Power Uprate and a Revision to the Technical Specifications | 21 January 2002 | Additional Information to Support the Request for Approval of Power Uprate and a Revision to the Technical Specifications | Anticipated operational occurrence Post Accident Monitoring Large early release frequency Fuel cladding |
NOC-AE-02001252, Proposed Amendments to Technical Specification 3/4.3.2 to Reduce Actuation Relay Test Frequency | 19 August 2002 | Proposed Amendments to Technical Specification 3/4.3.2 to Reduce Actuation Relay Test Frequency | Shutdown Margin Anticipated operational occurrence Large early release frequency |
NOC-AE-02001254, Special Report - IRE10 Refueling Outage, Inservice Inspection Results for Steam Generator Tubing | 22 January 2002 | Special Report - IRE10 Refueling Outage, Inservice Inspection Results for Steam Generator Tubing | |
NOC-AE-02001255, Technical Specifications Bases Change | 28 January 2002 | Technical Specifications Bases Change | |
NOC-AE-02001259, Additional Information to Support Request for Approval of Power Uprate & Revision to Technical Specifications | 5 February 2002 | Additional Information to Support Request for Approval of Power Uprate & Revision to Technical Specifications | Safe Shutdown |
NOC-AE-02001260, Technical Specification Bases Change, Pages B 3/4 5-2, B 3/4 6-1 & B 3/4 6-1a Update to Enhance Operability of Lhsi Train in Mode 4 with RHR in Service & Inoperable Air Lock Interlock Mechanism | 12 February 2002 | Technical Specification Bases Change, Pages B 3/4 5-2, B 3/4 6-1 & B 3/4 6-1a Update to Enhance Operability of Lhsi Train in Mode 4 with RHR in Service & Inoperable Air Lock Interlock Mechanism | |
NOC-AE-02001263, Annual Reports Required by Technical Specification 6.9.1.2 | 13 February 2002 | Annual Reports Required by Technical Specification 6.9.1.2 | |
NOC-AE-02001266, Nuclear Insurance Protection | 11 February 2002 | Nuclear Insurance Protection | Contraband Earthquake |
NOC-AE-02001267, Additional Information to Support the Request for Approval of Power Uprate and a Revision to the Technical Specifications | 14 February 2002 | Additional Information to Support the Request for Approval of Power Uprate and a Revision to the Technical Specifications | |
NOC-AE-02001268, Supplement to License Amendment Request Regarding Missed Surveillances Using Consolidated Line Item Improvement Process (CLIIP) | 23 May 2002 | Supplement to License Amendment Request Regarding Missed Surveillances Using Consolidated Line Item Improvement Process (CLIIP) | Time of Discovery Anticipated operational occurrence Missed surveillance |
NOC-AE-02001270, Technical Specification Bases Changes, Enhancements to Ecw Discharge Self-Cleaning Strainer & Emergency Transformer & Associated Bases | 18 February 2002 | Technical Specification Bases Changes, Enhancements to Ecw Discharge Self-Cleaning Strainer & Emergency Transformer & Associated Bases | Safe Shutdown Anticipated operational occurrence Qualified Offsite Circuit |
NOC-AE-02001271, Transmittal of Changes to South Texas Project Electric Generating Station Emergency Plan & Emergency Plan Implementing Procedures 0ERP01-ZV-OF01(Revision 2) | 4 March 2002 | Transmittal of Changes to South Texas Project Electric Generating Station Emergency Plan & Emergency Plan Implementing Procedures 0ERP01-ZV-OF01(Revision 2) | |
NOC-AE-02001275, Addendum to Proposed Amendment to Technical Specification 6.8.3.j for a Change in 10CFR50, Appendix J, Integrated Leakage Rate Test Interval | 6 March 2002 | Addendum to Proposed Amendment to Technical Specification 6.8.3.j for a Change in 10CFR50, Appendix J, Integrated Leakage Rate Test Interval | Probabilistic Risk Assessment Large early release frequency |
NOC-AE-02001276, Additional Information to Support the Request for Approval of Power Uprate and a Revision to the Technical Specifications | 27 February 2002 | Additional Information to Support the Request for Approval of Power Uprate and a Revision to the Technical Specifications | |
NOC-AE-02001277, Project Comprehensive Cultural Assessment | 17 April 2002 | Project Comprehensive Cultural Assessment | |
NOC-AE-02001278, Response to NRC Order Modifying Licenses (Effective Immediately) EA-02-026 | 18 March 2002 | Response to NRC Order Modifying Licenses (Effective Immediately) EA-02-026 | |
NOC-AE-02001281, Submittal of Evidence of Financial Protection from South Texas Project, Units 1 & 2 | 27 February 2002 | Submittal of Evidence of Financial Protection from South Texas Project, Units 1 & 2 | |
NOC-AE-02001282, Additional Information to Support the Request for Approval of Power Uprate and a Revision to the Technical Specifications | 4 March 2002 | Additional Information to Support the Request for Approval of Power Uprate and a Revision to the Technical Specifications | |
NOC-AE-02001285, February 2002 Monthly Operating Report for South Texas Project Units 1 & 2 | 11 March 2002 | February 2002 Monthly Operating Report for South Texas Project Units 1 & 2 | |
NOC-AE-02001288, Answer to STP Nuclear Operating Company to Commission'S Order Modifying Licenses (Effective Immediately) and Request for Extension of Time | 18 March 2002 | Answer to STP Nuclear Operating Company to Commission'S Order Modifying Licenses (Effective Immediately) and Request for Extension of Time | |
NOC-AE-02001290, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | 2 April 2002 | Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | Boric Acid Reactor Vessel Water Level VT-2 Condition Adverse to Quality Pressure Boundary Leakage |
NOC-AE-02001291, Safeguards Contingency Plan, Revision 4A | 21 March 2002 | Safeguards Contingency Plan, Revision 4A | |
NOC-AE-02001292, STP Nuclear Operating Company Units 1 & 2 Changes to Emergency Plan & Implementing Procedure | 28 March 2002 | STP Nuclear Operating Company Units 1 & 2 Changes to Emergency Plan & Implementing Procedure | |
NOC-AE-02001297, Revised Addendum to Proposed Amendment to Technical Specification 6.8.3.j | 2 April 2002 | Revised Addendum to Proposed Amendment to Technical Specification 6.8.3.j | Probabilistic Risk Assessment Large early release frequency |
NOC-AE-02001306, Extension of Implementation Time for Amendment Nos. 136 & 125, Relaxation of Allowed Outage Times & Bypass Test Times for Instrumentation | 18 April 2002 | Extension of Implementation Time for Amendment Nos. 136 & 125, Relaxation of Allowed Outage Times & Bypass Test Times for Instrumentation | |
NOC-AE-02001307, Fire Hazards Analysis Report, Amendment 14 | 22 April 2002 | Fire Hazards Analysis Report, Amendment 14 | Safe Shutdown Boric Acid Fire Barrier Fire Protection Program |
NOC-AE-02001308, STP Nuclear Units 1 & 2 Changes to Emergency Plan Implementing Procedures | 22 April 2002 | STP Nuclear Units 1 & 2 Changes to Emergency Plan Implementing Procedures | Earthquake |
NOC-AE-02001309, Supplement to Proposed Change to Radiation Monitoring Technical Specifications | 29 July 2002 | Supplement to Proposed Change to Radiation Monitoring Technical Specifications | Reactor Vessel Water Level Grab sample Pressure Boundary Leakage |
NOC-AE-02001314, Annual Environmental & Annual Radiological Environmental Operating Reports | 29 April 2002 | Annual Environmental & Annual Radiological Environmental Operating Reports | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
NOC-AE-02001316, Supplementary Response to NRC Order Modifying Licenses EA-02-026 | 28 May 2002 | Supplementary Response to NRC Order Modifying Licenses EA-02-026 | |
NOC-AE-02001317, Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity. | 16 May 2002 | Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity. | Boric Acid VT-2 |
NOC-AE-02001318, STP Nuclear Operating Co., Units 1 and 2 - Changes to Emergency Plan Implementing Procedures | 6 May 2002 | STP Nuclear Operating Co., Units 1 and 2 - Changes to Emergency Plan Implementing Procedures | Fitness for Duty High winds Met Tower Temporary Modification Severe Accident Management Guideline Deep Dose Equivalent |
NOC-AE-02001321, Request for Technical Specification Bases Changes, TS Pages B 3/4 3-1 & B 3/4 3-2b Revised to Incorporate Information Re Relaxation of Reactor Trip System & Engineered Safety Features Actuation System Allowed Outage Time | 28 May 2002 | Request for Technical Specification Bases Changes, TS Pages B 3/4 3-1 & B 3/4 3-2b Revised to Incorporate Information Re Relaxation of Reactor Trip System & Engineered Safety Features Actuation System Allowed Outage Time | Shutdown Margin Ultimate heat sink Offsite Circuit |
NOC-AE-02001325, Revision 1 to Unit 1 Cycle 11 Core Operating Limits Report | 13 May 2002 | Revision 1 to Unit 1 Cycle 11 Core Operating Limits Report | |
NOC-AE-02001326, Additional Information to Support Request for Approval of Proposed Change to Technical Specification 3.9.4, Containment Building Penetrations | 16 May 2002 | Additional Information to Support Request for Approval of Proposed Change to Technical Specification 3.9.4, Containment Building Penetrations | Safe Shutdown Tornado Missile Time to boil Tornado Generated Missile |
NOC-AE-02001329, Suspension of Review of Application for Order | 21 May 2002 | Suspension of Review of Application for Order | |
NOC-AE-02001330, Commitment Change Summary Report | 2 July 2002 | Commitment Change Summary Report | |