Additional Information to Support the Request for Approval of Power Uprate and a Revision to the Technical Specifications
ML020600154
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/27/2002
From: Parkey G
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-02001276
Download: ML020600154 (3)


Text

Nuclear Operating Company South Texas ProjectElectric GeneratingStation PO. Box 289 Wadsworth, Texas 77483 ,

February 27, 2002 NOC-AE-02001276 File No.: G25 10CFR50.90 STI:31412117 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Additional Information to Support the Request for Approval of Power Uprate and a Revision to the Technical Specifications

Reference:

Letter from J. J. Sheppard to NRC Document Control Desk, "Proposed Amendment to Facility Operating Licenses and Technical Specifications Associated with a 1.4% Core Power Uprate," August 22, 2001 (NOC-AE-01001162)

The referenced letter requested approval of increasing the plant operating power level by 1.4 percent and submitted a license amendment supporting associated revisions to Technical Specifications. As the result of a phone conversation with the NRC on February 14, 2002, additional information to support review of the licensing application is provided in the attachment to this letter.

There are no licensing commitments in this letter. If you should have any questions concerning this matter, please contact Mr. Ken Taplett at (361) 972-8416 or me at (361) 972-7800.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on: ,./2 G.L. Pare Vice President, Generation KJT/

Attachment:

Additional Information

NOC-AE-02001276 Page 2 Ellis W. Merschoff Jon C. Wood Regional Administrator, Region IV Matthews & Branscomb U.S. Nuclear Regulatory Commission 112 East Pecan, Suite 1100 611 Ryan Plaza Drive, Suite 400 San Antonio, Texas 78205-3692 Arlington, Texas 76011-8064 Institute of Nuclear Power Mohan C. Thadani Operations - Records Center Project Manager 700 Galleria Parkway U. S. Nuclear Regulatory Commission Atlanta, GA 30339-5957 1 White Flint North, Mail Stop: O-7D1 11555 Rockville Place Richard A. Ratliff Rockville, MD 20852-2738 Bureau of Radiation Control Texas Department of Health Cornelius F. O'Keefe 1100 West 49th Street U. S. Nuclear Regulatory Commission Austin, TX 78756-3189 P. 0. Box 289, Mail Code MN1 16 Wadsworth, TX 77483 R. L. Balcom/D. G. Tees Reliant Energy, Inc.

A. H. Gutterman, Esquire P. 0. Box 1700 Morgan, Lewis & Bockius Houston, TX 77251 1111 Pennsylvania Avenue, NW Washington, DC 20004 C. A. Johnson/A. C. Bakken, III AEP - Central Power and Light Company M. T. Hardt/W. C. Gunst P. 0. Box 289, Mail Code: N5022 City Public Service Wadsworth, TX 77483 P. 0. Box 1771 San Antonio, TX 78296 U. S. Nuclear Regulatory Commission Attention: Document Control Desk A. Ramirez/C. M. Canady Washington, D.C. 20555-0001 City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

Attachment NOC-AE-02001276 Page 1 of 1 ATTACHMENT ADDITIONAL INFORMATION By a letter dated August 22, 2001, STP Nuclear Operating Company (STPNOC), the licensee for South Texas Project Units 1 & 2, requested a license amendment to raise the plant operating power level by 1.4 percent. The NRC staff reviewed the application and determined that it needs additional information to complete its review. The additional information is provided below.

NRC requested information: Provide additional safety analysis limits and the calculated results for the uncontrolled rod control cluster assembly bank withdrawal at power transient that was re-analyzed for the 1.4-percent uprate application.

Response

The information below supplements information provided to the NRC in a letter on February 5, 2002 regarding the transient.

Parameter Safety Analysis Limit Calculated Result Peak reactor coolant system 2748.5 psig 2723.4 psig pressure Peak secondary steam side 1428.5 psig 1420 psig pressure Peak core average heat flux 118% (note) 117.1%

Note: Meeting the limit ensures that no core melt occurs