NL-03-0086, December 2002 Monthly Operating Report for Edwin I. Hatch Nuclear Plant | 7 January 2003 | December 2002 Monthly Operating Report for Edwin I. Hatch Nuclear Plant | |
NL-03-0088, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day Response, Request for Additional Information | 17 January 2003 | Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day Response, Request for Additional Information | Boric Acid VT-2 Pressure Boundary Leakage |
NL-03-0120, Inservice Inspection Summary Report | 4 February 2003 | Inservice Inspection Summary Report | |
NL-03-0157, Response to Request for Additional Information | 17 January 2003 | Response to Request for Additional Information | |
NL-03-0168, Southern Nuclear Operating Company, Inc., Answer to the Order for Compensatory Measures Related to Access Authorization | 27 January 2003 | Southern Nuclear Operating Company, Inc., Answer to the Order for Compensatory Measures Related to Access Authorization | Incorporated by reference |
NL-03-0169, Licensee Response to Order for Compensatory Measures Related to Access Authorization | 27 January 2003 | Licensee Response to Order for Compensatory Measures Related to Access Authorization | Incorporated by reference |
NL-03-0200, Response to Request for Additional Information, Steam Generator Tube Inspections | 12 February 2003 | Response to Request for Additional Information, Steam Generator Tube Inspections | |
NL-03-0257, Technical Specification Revision Request, Integrated Leakage Rate Testing Interval Extension | 26 February 2003 | Technical Specification Revision Request, Integrated Leakage Rate Testing Interval Extension | High winds Mission time Probabilistic Risk Assessment Coatings Large early release frequency |
NL-03-0322, Emergency Implementing Procedure Revisions | 4 February 2003 | Emergency Implementing Procedure Revisions | Health Physics Network Met Tower |
NL-03-0346, National Pollutant Discharge Elimination System Permit Renewal | 6 February 2003 | National Pollutant Discharge Elimination System Permit Renewal | Grab sample Biofouling |
NL-03-0369, Occupational Radiation Exposure Reports | 19 March 2003 | Occupational Radiation Exposure Reports | |
NL-03-0390, Licensee'S Answer to February 11, 2003 Commission Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors at Joseph M. Farley Nuclear Plant & Vogtle Electric Generating Plant | 3 March 2003 | Licensee'S Answer to February 11, 2003 Commission Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors at Joseph M. Farley Nuclear Plant & Vogtle Electric Generating Plant | Boric Acid Pressure Boundary Leakage |
NL-03-0438, Property Insurance Coverage as of 04/01/2003 | 3 March 2003 | Property Insurance Coverage as of 04/01/2003 | |
NL-03-0457, Transmittal of Edwin I. Hatch Nuclear Plant Physical Security Plan Revision | 28 February 2003 | Transmittal of Edwin I. Hatch Nuclear Plant Physical Security Plan Revision | |
NL-03-0472, Edwin I Hatch - Nuclear Security Training & Qualification Plan | 28 February 2003 | Edwin I Hatch - Nuclear Security Training & Qualification Plan | |
NL-03-0488, 10 CFR 50.59 Changes to the Technical Specification Bases | 28 February 2003 | 10 CFR 50.59 Changes to the Technical Specification Bases | Test box |
NL-03-0538, February 2003 Monthly Operating Report for Edwin I. Hatch Nuclear Plant | 5 March 2003 | February 2003 Monthly Operating Report for Edwin I. Hatch Nuclear Plant | |
NL-03-0584, February 2003 Monthly Operating Report for Vogtle | 13 March 2003 | February 2003 Monthly Operating Report for Vogtle | |
NL-03-0596, Joseph M. Farley Nuclear Plant, Vogtle Electric Generating Plant, Response to RIS 2003-01 and Request for Technical Alternative to ASME Section Xl, Appendix Viii, Supplement 10 | 14 May 2003 | Joseph M. Farley Nuclear Plant, Vogtle Electric Generating Plant, Response to RIS 2003-01 and Request for Technical Alternative to ASME Section Xl, Appendix Viii, Supplement 10 | Dissimilar Metal Weld |
NL-03-0620, Additional Information Concerning GL 96-06, Assurance of Equipment Operability and Containment Integrity During Design Basis Accident Conditions | 14 November 2003 | Additional Information Concerning GL 96-06, Assurance of Equipment Operability and Containment Integrity During Design Basis Accident Conditions | Anchor Darling |
NL-03-0636, Physical Security & Contingency Plan Revision | 24 March 2003 | Physical Security & Contingency Plan Revision | |
NL-03-0656, Joseph M. Farley Nuclear Plant and Vogtle Electric Generating Plant - Request for Technical Alternative to ASME Section XI, IWA-4120(a) and IWA-4310 | 7 May 2003 | Joseph M. Farley Nuclear Plant and Vogtle Electric Generating Plant - Request for Technical Alternative to ASME Section XI, IWA-4120(a) and IWA-4310 | Weld Overlay Hydrostatic Coatings Liquid penetrant |
NL-03-0693, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)) | 26 March 2003 | Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)) | Decommissioning Funding Plan |
NL-03-0694, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)) | 28 March 2003 | Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)) | Incorporated by reference Decommissioning Funding Plan |
NL-03-0696, Technical Specifications Revision to DC Electrical System Requirements | 20 July 2004 | Technical Specifications Revision to DC Electrical System Requirements | Safe Shutdown Shutdown Margin Ultimate heat sink Anticipated operational occurrence Post Accident Monitoring Internal Flooding Hydrostatic Probabilistic Risk Assessment Temporary Modification Large early release frequency Containment Hardened Vent Battery sizing Hardened vent Offsite Circuit |
NL-03-0704, Measurement Uncertainty Recapture Power Uprate Request for Additional Information Response | 7 April 2003 | Measurement Uncertainty Recapture Power Uprate Request for Additional Information Response | |
NL-03-0723, Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program Submittal | 23 April 2003 | Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program Submittal | Ultimate heat sink Mission time Internal Flooding Probabilistic Risk Assessment VT-2 Dissimilar Metal Weld |
NL-03-0750, Response to Request for Additional Information | 7 April 2003 | Response to Request for Additional Information | |
NL-03-0753, Request to Revise Technical Specifications Reactor Trip System Instrumentation Over Temperature Delta. | 10 April 2003 | Request to Revise Technical Specifications Reactor Trip System Instrumentation Over Temperature Delta. | GOTHIC |
NL-03-0757, Cycle 18 Core Operating Limits Report (COLR) | 7 April 2003 | Cycle 18 Core Operating Limits Report (COLR) | |
NL-03-0759, March 2003 Monthly Operating Report for Edwin I. Hatch, Units 1 & 2 | 7 April 2003 | March 2003 Monthly Operating Report for Edwin I. Hatch, Units 1 & 2 | |
NL-03-0894, Annual Non-Radiological Environmental Operating Reports for 2002 | 28 April 2003 | Annual Non-Radiological Environmental Operating Reports for 2002 | |
NL-03-0939, Revised Epips, Including 73EP-EIP-004-0, Version 9.0, 73EP-EIP-005-0, Version 8.0, 73EP-EIP-018-0, Version 7.0, 73EP-EIP-023-0S, Version 0.4 & 73EP-EIP-073-0. Version 15.1 | 30 April 2003 | Revised Epips, Including 73EP-EIP-004-0, Version 9.0, 73EP-EIP-005-0, Version 8.0, 73EP-EIP-018-0, Version 7.0, 73EP-EIP-023-0S, Version 0.4 & 73EP-EIP-073-0. Version 15.1 | Health Physics Network Grab sample Met Tower |
NL-03-0999, 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2002 | 2 June 2003 | 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2002 | |
NL-03-1047, Report of Facility Changes, Tests & Experiments | 14 May 2003 | Report of Facility Changes, Tests & Experiments | Safe Shutdown Turbine Missile |
NL-03-1078, Cycle 11 Core Operating Limits Report | 13 May 2003 | Cycle 11 Core Operating Limits Report | Shutdown Margin |
NL-03-1090, Organization and Correspondence Routine Changes | 16 May 2003 | Organization and Correspondence Routine Changes | |
NL-03-1091, Organization and Correspondence Routine Changes | 15 May 2003 | Organization and Correspondence Routine Changes | |
NL-03-1124, Measurement Uncertainty Recapture Power Uprate, Request for Additional Information Response | 21 May 2003 | Measurement Uncertainty Recapture Power Uprate, Request for Additional Information Response | |
NL-03-1140, Changes to Technical Specification Bases | 11 June 2003 | Changes to Technical Specification Bases | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Missed surveillance Power Operated Valves Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage |
NL-03-1178, Control Room AC System, Documentation of 05/28/2003 Teleconference Regarding Request for Enforcement Discretion | 30 May 2003 | Control Room AC System, Documentation of 05/28/2003 Teleconference Regarding Request for Enforcement Discretion | Ultimate heat sink Enforcement Discretion Temporary Modification |
NL-03-1180, Measurement Uncertainty Recapture Power Uprate (Murpu) | 30 May 2003 | Measurement Uncertainty Recapture Power Uprate (Murpu) | |
NL-03-1185, Addition of Snubber Inspection Type | 11 June 2003 | Addition of Snubber Inspection Type | |
NL-03-1260, Measurement Uncertainty Recapture Power Uprate (Murpu) Revised Enclosure 5 | 4 June 2003 | Measurement Uncertainty Recapture Power Uprate (Murpu) Revised Enclosure 5 | |
NL-03-1267, Report of Unsatisfactory Performance Testing | 23 June 2003 | Report of Unsatisfactory Performance Testing | |
NL-03-1287, Response to Request for Additional Information, Technical Specification Change to Turbine Building Area High Temperature Primary Containment Isolation Setpoint | 24 June 2003 | Response to Request for Additional Information, Technical Specification Change to Turbine Building Area High Temperature Primary Containment Isolation Setpoint | |
NL-03-1299, Addendum to 2001 Annual Radioactive Effluent Release Report | 16 June 2003 | Addendum to 2001 Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
NL-03-1347, Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program Submittal | 20 June 2003 | Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program Submittal | |
NL-03-1380, Third 10-Year Interval Inservice Testing Program, Submittal of Relief Requests RR-V-18 | 11 July 2003 | Third 10-Year Interval Inservice Testing Program, Submittal of Relief Requests RR-V-18 | Probabilistic Risk Assessment |
NL-03-1384, Withdrawal of Request for Relief Contained in Answer to the Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors | 3 July 2003 | Withdrawal of Request for Relief Contained in Answer to the Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors | |