Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
NL-03-0086, December 2002 Monthly Operating Report for Edwin I. Hatch Nuclear Plant7 January 2003December 2002 Monthly Operating Report for Edwin I. Hatch Nuclear Plant
NL-03-0088, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day Response, Request for Additional Information17 January 2003Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day Response, Request for Additional InformationBoric Acid
VT-2
Pressure Boundary Leakage
NL-03-0120, Inservice Inspection Summary Report4 February 2003Inservice Inspection Summary Report
NL-03-0157, Response to Request for Additional Information17 January 2003Response to Request for Additional Information
NL-03-0168, Southern Nuclear Operating Company, Inc., Answer to the Order for Compensatory Measures Related to Access Authorization27 January 2003Southern Nuclear Operating Company, Inc., Answer to the Order for Compensatory Measures Related to Access AuthorizationIncorporated by reference
NL-03-0169, Licensee Response to Order for Compensatory Measures Related to Access Authorization27 January 2003Licensee Response to Order for Compensatory Measures Related to Access AuthorizationIncorporated by reference
NL-03-0200, Response to Request for Additional Information, Steam Generator Tube Inspections12 February 2003Response to Request for Additional Information, Steam Generator Tube Inspections
NL-03-0257, Technical Specification Revision Request, Integrated Leakage Rate Testing Interval Extension26 February 2003Technical Specification Revision Request, Integrated Leakage Rate Testing Interval ExtensionHigh winds
Mission time
Probabilistic Risk Assessment
Coatings
Large early release frequency
NL-03-0322, Emergency Implementing Procedure Revisions4 February 2003Emergency Implementing Procedure RevisionsHealth Physics Network
Met Tower
NL-03-0346, National Pollutant Discharge Elimination System Permit Renewal6 February 2003National Pollutant Discharge Elimination System Permit RenewalGrab sample
Biofouling
NL-03-0369, Occupational Radiation Exposure Reports19 March 2003Occupational Radiation Exposure Reports
NL-03-0390, Licensee'S Answer to February 11, 2003 Commission Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors at Joseph M. Farley Nuclear Plant & Vogtle Electric Generating Plant3 March 2003Licensee'S Answer to February 11, 2003 Commission Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors at Joseph M. Farley Nuclear Plant & Vogtle Electric Generating PlantBoric Acid
Pressure Boundary Leakage
NL-03-0438, Property Insurance Coverage as of 04/01/20033 March 2003Property Insurance Coverage as of 04/01/2003
NL-03-0457, Transmittal of Edwin I. Hatch Nuclear Plant Physical Security Plan Revision28 February 2003Transmittal of Edwin I. Hatch Nuclear Plant Physical Security Plan Revision
NL-03-0472, Edwin I Hatch - Nuclear Security Training & Qualification Plan28 February 2003Edwin I Hatch - Nuclear Security Training & Qualification Plan
NL-03-0488, 10 CFR 50.59 Changes to the Technical Specification Bases28 February 200310 CFR 50.59 Changes to the Technical Specification BasesTest box
NL-03-0538, February 2003 Monthly Operating Report for Edwin I. Hatch Nuclear Plant5 March 2003February 2003 Monthly Operating Report for Edwin I. Hatch Nuclear Plant
NL-03-0584, February 2003 Monthly Operating Report for Vogtle13 March 2003February 2003 Monthly Operating Report for Vogtle
NL-03-0596, Joseph M. Farley Nuclear Plant, Vogtle Electric Generating Plant, Response to RIS 2003-01 and Request for Technical Alternative to ASME Section Xl, Appendix Viii, Supplement 1014 May 2003Joseph M. Farley Nuclear Plant, Vogtle Electric Generating Plant, Response to RIS 2003-01 and Request for Technical Alternative to ASME Section Xl, Appendix Viii, Supplement 10Dissimilar Metal Weld
NL-03-0620, Additional Information Concerning GL 96-06, Assurance of Equipment Operability and Containment Integrity During Design Basis Accident Conditions14 November 2003Additional Information Concerning GL 96-06, Assurance of Equipment Operability and Containment Integrity During Design Basis Accident ConditionsAnchor Darling
NL-03-0636, Physical Security & Contingency Plan Revision24 March 2003Physical Security & Contingency Plan Revision
NL-03-0656, Joseph M. Farley Nuclear Plant and Vogtle Electric Generating Plant - Request for Technical Alternative to ASME Section XI, IWA-4120(a) and IWA-43107 May 2003Joseph M. Farley Nuclear Plant and Vogtle Electric Generating Plant - Request for Technical Alternative to ASME Section XI, IWA-4120(a) and IWA-4310Weld Overlay
Hydrostatic
Coatings
Liquid penetrant
NL-03-0693, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1))26 March 2003Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1))Decommissioning Funding Plan
NL-03-0694, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1))28 March 2003Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1))Incorporated by reference
Decommissioning Funding Plan
NL-03-0696, Technical Specifications Revision to DC Electrical System Requirements20 July 2004Technical Specifications Revision to DC Electrical System RequirementsSafe Shutdown
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Temporary Modification
Large early release frequency
Containment Hardened Vent
Battery sizing
Hardened vent
Offsite Circuit
NL-03-0704, Measurement Uncertainty Recapture Power Uprate Request for Additional Information Response7 April 2003Measurement Uncertainty Recapture Power Uprate Request for Additional Information Response
NL-03-0723, Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program Submittal23 April 2003Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program SubmittalUltimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
VT-2
Dissimilar Metal Weld
NL-03-0750, Response to Request for Additional Information7 April 2003Response to Request for Additional Information
NL-03-0753, Request to Revise Technical Specifications Reactor Trip System Instrumentation Over Temperature Delta.10 April 2003Request to Revise Technical Specifications Reactor Trip System Instrumentation Over Temperature Delta.GOTHIC
NL-03-0757, Cycle 18 Core Operating Limits Report (COLR)7 April 2003Cycle 18 Core Operating Limits Report (COLR)
NL-03-0759, March 2003 Monthly Operating Report for Edwin I. Hatch, Units 1 & 27 April 2003March 2003 Monthly Operating Report for Edwin I. Hatch, Units 1 & 2
NL-03-0894, Annual Non-Radiological Environmental Operating Reports for 200228 April 2003Annual Non-Radiological Environmental Operating Reports for 2002
NL-03-0939, Revised Epips, Including 73EP-EIP-004-0, Version 9.0, 73EP-EIP-005-0, Version 8.0, 73EP-EIP-018-0, Version 7.0, 73EP-EIP-023-0S, Version 0.4 & 73EP-EIP-073-0. Version 15.130 April 2003Revised Epips, Including 73EP-EIP-004-0, Version 9.0, 73EP-EIP-005-0, Version 8.0, 73EP-EIP-018-0, Version 7.0, 73EP-EIP-023-0S, Version 0.4 & 73EP-EIP-073-0. Version 15.1Health Physics Network
Grab sample
Met Tower
NL-03-0999, 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 20022 June 200310 CFR 50.46 ECCS Evaluation Model Annual Reports for 2002
NL-03-1047, Report of Facility Changes, Tests & Experiments14 May 2003Report of Facility Changes, Tests & ExperimentsSafe Shutdown
Turbine Missile
NL-03-1078, Cycle 11 Core Operating Limits Report13 May 2003Cycle 11 Core Operating Limits ReportShutdown Margin
NL-03-1090, Organization and Correspondence Routine Changes16 May 2003Organization and Correspondence Routine Changes
NL-03-1091, Organization and Correspondence Routine Changes15 May 2003Organization and Correspondence Routine Changes
NL-03-1124, Measurement Uncertainty Recapture Power Uprate, Request for Additional Information Response21 May 2003Measurement Uncertainty Recapture Power Uprate, Request for Additional Information Response
NL-03-1140, Changes to Technical Specification Bases11 June 2003Changes to Technical Specification BasesSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Missed surveillance
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
NL-03-1178, Control Room AC System, Documentation of 05/28/2003 Teleconference Regarding Request for Enforcement Discretion30 May 2003Control Room AC System, Documentation of 05/28/2003 Teleconference Regarding Request for Enforcement DiscretionUltimate heat sink
Enforcement Discretion
Temporary Modification
NL-03-1180, Measurement Uncertainty Recapture Power Uprate (Murpu)30 May 2003Measurement Uncertainty Recapture Power Uprate (Murpu)
NL-03-1185, Addition of Snubber Inspection Type11 June 2003Addition of Snubber Inspection Type
NL-03-1260, Measurement Uncertainty Recapture Power Uprate (Murpu) Revised Enclosure 54 June 2003Measurement Uncertainty Recapture Power Uprate (Murpu) Revised Enclosure 5
NL-03-1267, Report of Unsatisfactory Performance Testing23 June 2003Report of Unsatisfactory Performance Testing
NL-03-1287, Response to Request for Additional Information, Technical Specification Change to Turbine Building Area High Temperature Primary Containment Isolation Setpoint24 June 2003Response to Request for Additional Information, Technical Specification Change to Turbine Building Area High Temperature Primary Containment Isolation Setpoint
NL-03-1299, Addendum to 2001 Annual Radioactive Effluent Release Report16 June 2003Addendum to 2001 Annual Radioactive Effluent Release ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
NL-03-1347, Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program Submittal20 June 2003Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program Submittal
NL-03-1380, Third 10-Year Interval Inservice Testing Program, Submittal of Relief Requests RR-V-1811 July 2003Third 10-Year Interval Inservice Testing Program, Submittal of Relief Requests RR-V-18Probabilistic Risk Assessment
NL-03-1384, Withdrawal of Request for Relief Contained in Answer to the Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors3 July 2003Withdrawal of Request for Relief Contained in Answer to the Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors