05000338/LER-2016-001 | 16 March 2016 | 1 OF 3 LER 16-001-00 for North Anna, Units 1 and 2, Regarding Emergency Diesel Generators Automatic Start Due to Loss of Power to "C" Reserve Station Service Transformer | Reserve Station Service Transformer |
05000338/LER-2016-002 | 5 May 2016 | , Chemical Addition System Outside of Technical Specification Due to Excessive Unseating Thrust on MOVs LER 16-002-00 for North Anna, Unit 1, Regarding Chemical Addition System Outside of Technical Specification Due to Excessive Unseating Thrust on MOVs | |
05000338/LER-2016-003 | 16 June 2016 | 1 OF 3 LER 16-003-00 for North Anna, Unit 1, Regarding Engineered Safety Feature Actuation Due to Loss of Power to "A" Reserve Station Service Transformer | Reserve Station Service Transformer |
05000339/LER-2016-001 | 21 September 2016 | Technical Specification Required Shutdown Due to Reactor Coolant System Leak LER 16-001-00 for North Anna Power Station, Unit 2 Regarding Technical Specification Required Shutdown Due to Reactor Coolant System Leak | Pressure Boundary Leakage Through Wall Leak |
CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 | 14 July 2011 | G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 | Fukushima Dai-Ichi Significance Determination Process Earthquake Backfit |
IR 05000039/2018001 | 8 May 2018 | NRC Integrated Inspection Report 05000338/3018001 and 0500039/2018001 | Boric Acid High winds Fire Barrier Enforcement Discretion Reserve Station Service Transformer Nondestructive Examination Functionality Assessment Significance Determination Process Operability Determination Earthquake Liquid penetrant Fire Protection Program Power change |
IR 05000280/2002006 | 25 March 2002 | IR 05000338/2002-006, IR 05000339/2002-006, 05000280/2002-006 & 05000281/2002-006, Virginia Electric & Power Co., Glen Allen, Va. Inspection on 02/08/2002 Related to Application for Renewal. No Violations Noted | Safe Shutdown Boric Acid Ultimate heat sink Coatings Reserve Station Service Transformer Aging Management License Renewal Fire Protection Program |
IR 05000280/2002010 | 6 November 2002 | Stations - Addendum to NRC IR 05000338-02-010, 05000339-02-010, 05000280-02-010 and 05000281-02-010 | |
IR 05000333/2003001 | 4 March 2003 | Annual Assessment Letter - North Anna Power Station (Reports 50-333/03-01 & 50-339/03-01) | |
IR 05000338/2001005 | 25 April 2002 | IR 05000338/01-05 & IR 05000339/01-05 on March 30, 2002. No Violations Identified | |
IR 05000338/2001009 | 27 March 2002 | Reply to Denial of NCV and Claim of Backfit (IR 05000338/2001-009 & 05000339/2001-009) | Backfit |
IR 05000338/2002001 | 4 March 2002 | Annual Assessment Letter - North Anna Power Station (Reports 50-338/02-01 and 50-339/02-01) | License Renewal |
IR 05000338/2002002 | 19 July 2002 | IR 05000338-02-002, IR 05000339-02-002, on 03/31-06/29/2002, Virginia Electric and Power Co., North Anna Power Station Units 1 & 2. Resident Inspector Integrated Report | Stroke time Temporary Modification Job Performance Measure Earthquake Maintenance Rule Program Fire Protection Program Power change |
IR 05000338/2002003 | 28 October 2002 | IR 05000338-02-003 & IR 05000339-02-003, on 06/30-09/28/2002, Virginia Electric and Power Co., North Anna Power Station Units 1 & 2. Resident Inspector Integrated Report | High Radiation Area Temporary Modification Emergency Lighting Maintenance Rule Program Fire Protection Program |
IR 05000338/2002004 | 30 January 2003 | IR 05000338-02-004 & IR 05000339-02-004, on July 15-19 & September 29, 2002 Through January 4, 2003, North Anna, Units 1 & 2. Heat Sink Performance, Inservice Inspection Activities, Operability Operations & Access Control to Radiologically | Boric Acid High Radiation Area Weld Overlay Nondestructive Examination Temporary Modification Locked High Radiation Area Significance Determination Process Job Performance Measure Maintenance Rule Program Liquid penetrant Pressure Boundary Leakage Fire Protection Program Scaffolding Exit Sign Exclusive Use |
IR 05000338/2003002 | 5 May 2003 | IR 05000338-03-002, IR 05000339-03-002, on 01/05/ - 04/05/2003, Virginia Electric and Power Company; North Anna, Units 1 & 2; Inservice Inspection Activities | Hot Short Boric Acid Packing leak High Radiation Area Past operability Coatings Nondestructive Examination Temporary Modification VT-2 Locked High Radiation Area Significance Determination Process Maintenance Rule Program Liquid penetrant Pressure Boundary Leakage Through-Wall Leakage Fire Protection Program Fire Watch Dissimilar Metal Weld Scaffolding Coast down |
IR 05000338/2003004 | 27 October 2003 | IR 05000338-03-004 & IR 05000339-03-004 on 09/27/03 for North Anna Power Station, Units 1 & 2, Event Followup | Boric Acid High winds High Radiation Area Significance Determination Process Operability Determination Maintenance Rule Program Minimum staff Fire Protection Program Siren |
IR 05000338/2003006 | 2 July 2003 | IR 05000338-03-006 & 05000339-03-006, on May 5-9, 2003 & May 19-23, 2003, North Anna Power Station. Triennial Fire Protection | Hot Short Safe Shutdown Fire Barrier Operator Manual Action Emergency Lighting Significance Determination Process Fire Protection Program |
IR 05000338/2003007 | 29 March 2004 | IR 05000338-03-007, IR 05000339-03-007, on 10/03/2003, North Anna Power Station, Physical Security Inspection Completed | |
IR 05000338/2003008 | 14 March 2003 | IR 05000338-03-008, 05000339-03-008, on 01/27-02/14/2003, Virginia Electric and Power Co., North Anna Power Station Units 1 & 2. Biennial Baseline Inspection of the Identification and Resolution of Problems | Hot Short Packing leak Temporary Modification Condition Adverse to Quality Significance Determination Process |
IR 05000338/2003010 | 18 November 2003 | IR 05000338-03-010, IR 05000339-03-010, on 10/06-10/2003 & 10/20-24/2003, North Anna Power Station, Units 1 & 2, Safety System Design and Performance Capability Inspection | Stroke time Probabilistic Risk Assessment Job Performance Measure Foreign Material Exclusion Battery sizing |
IR 05000338/2004002 | 16 April 2004 | IR 05000338-04-002 & 05000339-04-002, on 03/27/2004, Virginia Electric and Power Company, Glen Allen, VA | Packing leak High Radiation Area Internal Flooding Temporary Modification Significance Determination Process Job Performance Measure Operability Determination Maintenance Rule Program Fire Protection Program |
IR 05000338/2004003 | 23 July 2004 | IR 05000338-04-003, 05000339-04-003, on 03/28/04 - 06/26/04, North Anna, Units 1 & 2; Integrated Resident & Regional Report; Maintenance Implementation, Maintenance Risk Assessment, Non-Routine Evolution, Operability Evaluation & Surveillan | Safe Shutdown Boric Acid High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Tornado Missile Internal Flooding Coatings Nondestructive Examination Temporary Modification VT-2 Locked High Radiation Area Significance Determination Process Tornado Missile Protection Annual Radioactive Effluent Release Report Foreign Material Exclusion Operability Determination Maintenance Rule Program Liquid penetrant Pressure Boundary Leakage Fire Protection Program Scaffolding Power change Operability Assessment Exclusive Use |
IR 05000338/2004006 | 28 January 2005 | IR 05000338-04-006 & 05000339-04-006, on 09/26-12/31/2004, North Anna Power Station, Units 1 & 2; Problem Identification and Resolution, and Other | Hot Short Safe Shutdown Packing leak Past operability Temporary Modification Condition Adverse to Quality Missed surveillance Significance Determination Process Operability Determination Maintenance Rule Program Fire Protection Program Operability Assessment |
IR 05000338/2004007 | 27 May 2004 | IR 05000338-04-007 & IR 05000339-04-007, on 04/26/2004 - 04/27/2004, North Anna Nuclear Power Station, Physical Security Baseline Inspection, Cover Letter | |
IR 05000338/2004301 | 19 July 2004 | NRC Examination Report 05000338-04-301 & 05000339-04-301 for North Anna Power Station | Job Performance Measure |
IR 05000338/2005002 | 21 April 2005 | IR 05000338-05-002, IR 05000339-05-002, IR 07200016-05-001 on 01/01/2005 - 03/31/2005 for North Anna, Units 1 & 2 and North Anna Independent Spent Fuel Storage Installation. Routine Integrated Report | High winds Offsite Dose Calculation Manual Temporary Modification Emergency Lighting Operability Determination Maintenance Rule Program Fire Protection Program |
IR 05000338/2005005 | 30 January 2006 | IR 05000338-05-005, IR 05000339-05-005; 10/01/2005 - 12/31/2005; North Anna Power Station Units 1 & 2. Routine Integrated Resident and Regional Report. Inservice Inspection | Boric Acid Non-Destructive Examination Fire Barrier Water Inventory Control Reserve Station Service Transformer Nondestructive Examination VT-2 Condition Adverse to Quality Significance Determination Process Foreign Material Exclusion Operability Determination Maintenance Rule Program Through-Wall Leak Fire Protection Program Dissimilar Metal Weld Scaffolding Incremental Core Damage Probability Deficit |
IR 05000338/2005006 | 22 February 2005 | IR 05000338-05-006, IR 05000339-05-006, Virginia Electric and Power Co., 01/10 - 01/28/05, North Anna Power Station Units 1 & 2, Biennial Baseline Inspection of the Identification and Resolution of Problems | Boric Acid Packing leak High Radiation Area Coatings Temporary Modification Significance Determination Process Maintenance Rule Program Through Wall Leak Fire Watch Operability Assessment |
IR 05000338/2005007 | 10 May 2005 | IR 05000338-05-007, IR 05000339-05-007, on 03/21-25/2005 & 04/11-15-2005, North Anna Power Station, Units 1 and 2; Safety System Design and Performance Capability Inspection | Stroke time Job Performance Measure Battery sizing |
IR 05000338/2005008 | 24 March 2006 | IR 05000338-05-008 and 05000339-05-008; Virginia Electric and Power Company; 01/27/2006 Through 02/10/2006; North Anna Power Station, Unit 1 & 2, NRC Triennial Fire Protection Inspection | Safe Shutdown Fire Barrier Emergency Lighting Significance Determination Process Job Performance Measure Fire Protection Program |
IR 05000338/2006002 | 26 April 2006 | IR 05000338-06-002, IR 05000339-06-002, IR 07200016-06-001; 01/01/2006 - 03/31/2006; North Anna Units 1 & 2, & North Anna Independent Spent Fuel Storage Installation. Routine Integrated Resident and Regional Inspector Report. Event Follow-u | Boric Acid High Radiation Area Fire Barrier Water Inventory Control Reserve Station Service Transformer Nondestructive Examination Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Job Performance Measure Foreign Material Exclusion Process Control Program Operability Determination Earthquake Maintenance Rule Program Liquid penetrant Through Wall Leak Fire Protection Program Scaffolding Downpower Coast down |
IR 05000338/2006003 | 28 July 2006 | IR 05000338-06-003, IR 05000339-06-003, IR 07200016-06-001, on 04/01/2006 - 06/30/2006, for North Anna, Units 1 & 2, and Independent Spent Fuel Storage Installation. Routine Integrated Resident and Regional Report | Safe Shutdown High Radiation Area Fire Barrier Water Inventory Control Commercial Grade Dedication Past operability Coatings Temporary Modification Emergency Lighting Condition Adverse to Quality Significance Determination Process Operability Determination Earthquake Maintenance Rule Program Fire Protection Program Power change |
IR 05000338/2006004 | 30 October 2006 | IR 05000338-06-004, IR 05000339-06-004, on 07/01/2006 - 09/30/2006 for North Anna, Units 1 and 2, Adverse Weather Protection | Fire Barrier Temporary Modification Tornado Generated Missile Significance Determination Process Tornado Missile Protection Operability Determination TORMIS Maintenance Rule Program Fire Protection Program |
IR 05000338/2006005 | 29 January 2007 | IR 05000338-06-005, 05000339-06-005 and 07200016-06-003 on 12/31/2006 for North Anna, Units 1 and 2 | Fire Barrier Water Inventory Control Internal Flooding Temporary Modification Emergency Lighting Significance Determination Process Operability Determination License Renewal Maintenance Rule Program Fire Protection Program |
IR 05000338/2006301 | 2 August 2006 | Er 05000338-06-301, 05000339-06-301; 5/22-26/2006, 6/5-9/2006, 6/14/2006; North Anna Power Station; Licensed Operator Examinations | |
IR 05000338/2006401 | 27 September 2006 | IR 05000338-06-401 & IR 05000339-06-401, Safeguards Removed) North Anna Power Power Station | Affidavit |
IR 05000338/2006501 | 27 December 2006 | IR 05000338-06-501 & 05000339-06-501; Virginia Electric and Power Company; 12/04/2006 - 12/08/2006; North Anna Power Station | |
IR 05000338/2007001 | 1 March 2007 | Annual Assessment Letter - North Anna Power Station (NRC Inspection Report 05000338/2007001 & IR 050000339/2007001) | |
IR 05000338/2007002 | 26 April 2007 | IR 05000338-07-002, 05000339-07-002 and 07200056-07-001, on 03/31/2007, North Anna, Units 1 and 2 | Fire Barrier Water Inventory Control Internal Flooding Reserve Station Service Transformer Temporary Modification Missed surveillance Significance Determination Process Maintenance Rule Program Offsite Circuit Fire Protection Program Power change |
IR 05000338/2007003 | 31 July 2007 | IR 05000338-07-003, IR 05000339-07-003; 04/01- 06/30/2007; North Anna Power Station, Units 1 & 2; Other Activities | Boric Acid High Radiation Area Offsite Dose Calculation Manual Fire Barrier Water Inventory Control Weld Overlay Internal Flooding Hydrostatic Coatings Reserve Station Service Transformer Nondestructive Examination Temporary Modification VT-2 Emergency Lighting Significance Determination Process Design basis earthquake Foreign Material Exclusion Annual Radiological Environmental Operating Report Operability Determination Code Reconciliation Maintenance Rule Program Fire Protection Program |
IR 05000338/2007004 | 30 October 2007 | IR 05000338-07-004 and 05000339-07-004; on 07/01/2007 - 09/30/2007; North Anna Power Station, Units 1 & 2, Routine Integrated Resident and Regional Report. Inservice Inspection | Boric Acid Ultimate heat sink Fire Barrier Water Inventory Control Weld Overlay Nondestructive Examination Temporary Modification VT-2 Significance Determination Process Operability Determination Maintenance Rule Program Biofouling Liquid penetrant Fire Protection Program DM weld |
IR 05000338/2007005 | 31 January 2008 | IR 05000338-07-005, 05000339-07-005 on 10/01/2007 - 12/31/2007 for North Anna, Units 1 & 2, Refueling and Outage Activities | Fire Barrier Water Inventory Control Enforcement Discretion Coatings Temporary Modification Emergency Lighting Significance Determination Process Foreign Material Exclusion Operability Determination Maintenance Rule Program Control of Heavy Loads Fire Protection Program |
IR 05000338/2007006 | 13 March 2007 | IR 05000338-07-006, 05000339-07-006, 12/11/2006 - 02/09/2007; North Anna Power Station Units 1 & 2; Component Design Bases Inspection | Probabilistic Risk Assessment Job Performance Measure Operability Determination Time Critical Operator Action |
IR 05000338/2007401 | 9 July 2007 | NRC Material Control and Accounting Program Inspection - Report 05000338-07-401 and 05000339-07-401 | Affidavit |
IR 05000338/2007402 | 20 June 2007 | IR 05000338-07-402 and 05000339-07-402, on 05/25/2007, North Anna Power Station - NRC Physical Security Baseline Inspection | Affidavit |
IR 05000338/2007501 | 6 September 2007 | IR 05000338-07-501 and 05000339-07-501, on 08/06-10/2007, North Anna, Units 1 and 2, Baseline Inspection | |
IR 05000338/2008002 | 30 April 2008 | IR 05000338-08-002, 05000339-08-002 on 03/31/2008 for North Anna | Fire Barrier Internal Flooding Temporary Modification Significance Determination Process Job Performance Measure Operability Determination Maintenance Rule Program Fire Protection Program Power change |
IR 05000338/2008004 | 28 October 2008 | IR 05000338-08-004, 05000339-08-004; 07/01/2008 - 09/30/2008; North Anna Power Station, Units 1 and 2; Routine Integrated Report, Other Activities | Boric Acid Fire Barrier Water Inventory Control Weld Overlay Internal Flooding Reserve Station Service Transformer Nondestructive Examination Significance Determination Process Operability Determination Earthquake Maintenance Rule Program Liquid penetrant Fire Protection Program Dissimilar Metal Weld |
IR 05000338/2008005 | 28 January 2009 | IR 05000338-08-005, 05000339-08-005, on 10/01/2008 - 12/31/2008, North Anna Power Station, Units 1 and 2; Routine Integrated Report, Fire Protection | Safe Shutdown High Radiation Area Fire Barrier Tornado Missile Water Inventory Control Weld Overlay Reserve Station Service Transformer Temporary Modification Emergency Lighting Locked High Radiation Area Significance Determination Process Tornado Missile Protection Foreign Material Exclusion Process Control Program Operability Determination Maintenance Rule Program Fire Protection Program |