Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000338/LER-2016-00116 March 20161 OF 3
LER 16-001-00 for North Anna, Units 1 and 2, Regarding Emergency Diesel Generators Automatic Start Due to Loss of Power to "C" Reserve Station Service Transformer
Reserve Station Service Transformer
05000338/LER-2016-0025 May 2016, Chemical Addition System Outside of Technical Specification Due to Excessive Unseating Thrust on MOVs
LER 16-002-00 for North Anna, Unit 1, Regarding Chemical Addition System Outside of Technical Specification Due to Excessive Unseating Thrust on MOVs
05000338/LER-2016-00316 June 20161 OF 3
LER 16-003-00 for North Anna, Unit 1, Regarding Engineered Safety Feature Actuation Due to Loss of Power to "A" Reserve Station Service Transformer
Reserve Station Service Transformer
05000339/LER-2016-00121 September 2016Technical Specification Required Shutdown Due to Reactor Coolant System Leak
LER 16-001-00 for North Anna Power Station, Unit 2 Regarding Technical Specification Required Shutdown Due to Reactor Coolant System Leak
Pressure Boundary Leakage
Through Wall Leak
CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 197114 July 2011G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971Fukushima Dai-Ichi
Significance Determination Process
Earthquake
Backfit
IR 05000039/20180018 May 2018NRC Integrated Inspection Report 05000338/3018001 and 0500039/2018001Boric Acid
High winds
Fire Barrier
Enforcement Discretion
Reserve Station Service Transformer
Nondestructive Examination
Functionality Assessment
Significance Determination Process
Operability Determination
Earthquake
Liquid penetrant
Fire Protection Program
Power change
IR 05000280/200200625 March 2002IR 05000338/2002-006, IR 05000339/2002-006, 05000280/2002-006 & 05000281/2002-006, Virginia Electric & Power Co., Glen Allen, Va. Inspection on 02/08/2002 Related to Application for Renewal. No Violations NotedSafe Shutdown
Boric Acid
Ultimate heat sink
Coatings
Reserve Station Service Transformer
Aging Management
License Renewal
Fire Protection Program
IR 05000280/20020106 November 2002Stations - Addendum to NRC IR 05000338-02-010, 05000339-02-010, 05000280-02-010 and 05000281-02-010
IR 05000333/20030014 March 2003Annual Assessment Letter - North Anna Power Station (Reports 50-333/03-01 & 50-339/03-01)
IR 05000338/200100525 April 2002IR 05000338/01-05 & IR 05000339/01-05 on March 30, 2002. No Violations Identified
IR 05000338/200100927 March 2002Reply to Denial of NCV and Claim of Backfit (IR 05000338/2001-009 & 05000339/2001-009)Backfit
IR 05000338/20020014 March 2002Annual Assessment Letter - North Anna Power Station (Reports 50-338/02-01 and 50-339/02-01)License Renewal
IR 05000338/200200219 July 2002IR 05000338-02-002, IR 05000339-02-002, on 03/31-06/29/2002, Virginia Electric and Power Co., North Anna Power Station Units 1 & 2. Resident Inspector Integrated ReportStroke time
Temporary Modification
Job Performance Measure
Earthquake
Maintenance Rule Program
Fire Protection Program
Power change
IR 05000338/200200328 October 2002IR 05000338-02-003 & IR 05000339-02-003, on 06/30-09/28/2002, Virginia Electric and Power Co., North Anna Power Station Units 1 & 2. Resident Inspector Integrated ReportHigh Radiation Area
Temporary Modification
Emergency Lighting
Maintenance Rule Program
Fire Protection Program
IR 05000338/200200430 January 2003IR 05000338-02-004 & IR 05000339-02-004, on July 15-19 & September 29, 2002 Through January 4, 2003, North Anna, Units 1 & 2. Heat Sink Performance, Inservice Inspection Activities, Operability Operations & Access Control to RadiologicallyBoric Acid
High Radiation Area
Weld Overlay
Nondestructive Examination
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Job Performance Measure
Maintenance Rule Program
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program
Scaffolding
Exit Sign
Exclusive Use
IR 05000338/20030025 May 2003IR 05000338-03-002, IR 05000339-03-002, on 01/05/ - 04/05/2003, Virginia Electric and Power Company; North Anna, Units 1 & 2; Inservice Inspection ActivitiesHot Short
Boric Acid
Packing leak
High Radiation Area
Past operability
Coatings
Nondestructive Examination
Temporary Modification
VT-2
Locked High Radiation Area
Significance Determination Process
Maintenance Rule Program
Liquid penetrant
Pressure Boundary Leakage
Through-Wall Leakage
Fire Protection Program
Fire Watch
Dissimilar Metal Weld
Scaffolding
Coast down
IR 05000338/200300427 October 2003IR 05000338-03-004 & IR 05000339-03-004 on 09/27/03 for North Anna Power Station, Units 1 & 2, Event FollowupBoric Acid
High winds
High Radiation Area
Significance Determination Process
Operability Determination
Maintenance Rule Program
Minimum staff
Fire Protection Program
Siren
IR 05000338/20030062 July 2003IR 05000338-03-006 & 05000339-03-006, on May 5-9, 2003 & May 19-23, 2003, North Anna Power Station. Triennial Fire ProtectionHot Short
Safe Shutdown
Fire Barrier
Operator Manual Action
Emergency Lighting
Significance Determination Process
Fire Protection Program
IR 05000338/200300729 March 2004IR 05000338-03-007, IR 05000339-03-007, on 10/03/2003, North Anna Power Station, Physical Security Inspection Completed
IR 05000338/200300814 March 2003IR 05000338-03-008, 05000339-03-008, on 01/27-02/14/2003, Virginia Electric and Power Co., North Anna Power Station Units 1 & 2. Biennial Baseline Inspection of the Identification and Resolution of ProblemsHot Short
Packing leak
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
IR 05000338/200301018 November 2003IR 05000338-03-010, IR 05000339-03-010, on 10/06-10/2003 & 10/20-24/2003, North Anna Power Station, Units 1 & 2, Safety System Design and Performance Capability InspectionStroke time
Probabilistic Risk Assessment
Job Performance Measure
Foreign Material Exclusion
Battery sizing
IR 05000338/200400216 April 2004IR 05000338-04-002 & 05000339-04-002, on 03/27/2004, Virginia Electric and Power Company, Glen Allen, VAPacking leak
High Radiation Area
Internal Flooding
Temporary Modification
Significance Determination Process
Job Performance Measure
Operability Determination
Maintenance Rule Program
Fire Protection Program
IR 05000338/200400323 July 2004IR 05000338-04-003, 05000339-04-003, on 03/28/04 - 06/26/04, North Anna, Units 1 & 2; Integrated Resident & Regional Report; Maintenance Implementation, Maintenance Risk Assessment, Non-Routine Evolution, Operability Evaluation & SurveillanSafe Shutdown
Boric Acid
High Radiation Area
Non-Destructive Examination
Offsite Dose Calculation Manual
Tornado Missile
Internal Flooding
Coatings
Nondestructive Examination
Temporary Modification
VT-2
Locked High Radiation Area
Significance Determination Process
Tornado Missile Protection
Annual Radioactive Effluent Release Report
Foreign Material Exclusion
Operability Determination
Maintenance Rule Program
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program
Scaffolding
Power change
Operability Assessment
Exclusive Use
IR 05000338/200400628 January 2005IR 05000338-04-006 & 05000339-04-006, on 09/26-12/31/2004, North Anna Power Station, Units 1 & 2; Problem Identification and Resolution, and OtherHot Short
Safe Shutdown
Packing leak
Past operability
Temporary Modification
Condition Adverse to Quality
Missed surveillance
Significance Determination Process
Operability Determination
Maintenance Rule Program
Fire Protection Program
Operability Assessment
IR 05000338/200400727 May 2004IR 05000338-04-007 & IR 05000339-04-007, on 04/26/2004 - 04/27/2004, North Anna Nuclear Power Station, Physical Security Baseline Inspection, Cover Letter
IR 05000338/200430119 July 2004NRC Examination Report 05000338-04-301 & 05000339-04-301 for North Anna Power StationJob Performance Measure
IR 05000338/200500221 April 2005IR 05000338-05-002, IR 05000339-05-002, IR 07200016-05-001 on 01/01/2005 - 03/31/2005 for North Anna, Units 1 & 2 and North Anna Independent Spent Fuel Storage Installation. Routine Integrated ReportHigh winds
Offsite Dose Calculation Manual
Temporary Modification
Emergency Lighting
Operability Determination
Maintenance Rule Program
Fire Protection Program
IR 05000338/200500530 January 2006IR 05000338-05-005, IR 05000339-05-005; 10/01/2005 - 12/31/2005; North Anna Power Station Units 1 & 2. Routine Integrated Resident and Regional Report. Inservice InspectionBoric Acid
Non-Destructive Examination
Fire Barrier
Water Inventory Control
Reserve Station Service Transformer
Nondestructive Examination
VT-2
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Maintenance Rule Program
Through-Wall Leak
Fire Protection Program
Dissimilar Metal Weld
Scaffolding
Incremental Core Damage Probability Deficit
IR 05000338/200500622 February 2005IR 05000338-05-006, IR 05000339-05-006, Virginia Electric and Power Co., 01/10 - 01/28/05, North Anna Power Station Units 1 & 2, Biennial Baseline Inspection of the Identification and Resolution of ProblemsBoric Acid
Packing leak
High Radiation Area
Coatings
Temporary Modification
Significance Determination Process
Maintenance Rule Program
Through Wall Leak
Fire Watch
Operability Assessment
IR 05000338/200500710 May 2005IR 05000338-05-007, IR 05000339-05-007, on 03/21-25/2005 & 04/11-15-2005, North Anna Power Station, Units 1 and 2; Safety System Design and Performance Capability InspectionStroke time
Job Performance Measure
Battery sizing
IR 05000338/200500824 March 2006IR 05000338-05-008 and 05000339-05-008; Virginia Electric and Power Company; 01/27/2006 Through 02/10/2006; North Anna Power Station, Unit 1 & 2, NRC Triennial Fire Protection InspectionSafe Shutdown
Fire Barrier
Emergency Lighting
Significance Determination Process
Job Performance Measure
Fire Protection Program
IR 05000338/200600226 April 2006IR 05000338-06-002, IR 05000339-06-002, IR 07200016-06-001; 01/01/2006 - 03/31/2006; North Anna Units 1 & 2, & North Anna Independent Spent Fuel Storage Installation. Routine Integrated Resident and Regional Inspector Report. Event Follow-uBoric Acid
High Radiation Area
Fire Barrier
Water Inventory Control
Reserve Station Service Transformer
Nondestructive Examination
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Process Control Program
Operability Determination
Earthquake
Maintenance Rule Program
Liquid penetrant
Through Wall Leak
Fire Protection Program
Scaffolding
Downpower
Coast down
IR 05000338/200600328 July 2006IR 05000338-06-003, IR 05000339-06-003, IR 07200016-06-001, on 04/01/2006 - 06/30/2006, for North Anna, Units 1 & 2, and Independent Spent Fuel Storage Installation. Routine Integrated Resident and Regional ReportSafe Shutdown
High Radiation Area
Fire Barrier
Water Inventory Control
Commercial Grade Dedication
Past operability
Coatings
Temporary Modification
Emergency Lighting
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Earthquake
Maintenance Rule Program
Fire Protection Program
Power change
IR 05000338/200600430 October 2006IR 05000338-06-004, IR 05000339-06-004, on 07/01/2006 - 09/30/2006 for North Anna, Units 1 and 2, Adverse Weather ProtectionFire Barrier
Temporary Modification
Tornado Generated Missile
Significance Determination Process
Tornado Missile Protection
Operability Determination
TORMIS
Maintenance Rule Program
Fire Protection Program
IR 05000338/200600529 January 2007IR 05000338-06-005, 05000339-06-005 and 07200016-06-003 on 12/31/2006 for North Anna, Units 1 and 2Fire Barrier
Water Inventory Control
Internal Flooding
Temporary Modification
Emergency Lighting
Significance Determination Process
Operability Determination
License Renewal
Maintenance Rule Program
Fire Protection Program
IR 05000338/20063012 August 2006Er 05000338-06-301, 05000339-06-301; 5/22-26/2006, 6/5-9/2006, 6/14/2006; North Anna Power Station; Licensed Operator Examinations
IR 05000338/200640127 September 2006IR 05000338-06-401 & IR 05000339-06-401, Safeguards Removed) North Anna Power Power StationAffidavit
IR 05000338/200650127 December 2006IR 05000338-06-501 & 05000339-06-501; Virginia Electric and Power Company; 12/04/2006 - 12/08/2006; North Anna Power Station
IR 05000338/20070011 March 2007Annual Assessment Letter - North Anna Power Station (NRC Inspection Report 05000338/2007001 & IR 050000339/2007001)
IR 05000338/200700226 April 2007IR 05000338-07-002, 05000339-07-002 and 07200056-07-001, on 03/31/2007, North Anna, Units 1 and 2Fire Barrier
Water Inventory Control
Internal Flooding
Reserve Station Service Transformer
Temporary Modification
Missed surveillance
Significance Determination Process
Maintenance Rule Program
Offsite Circuit
Fire Protection Program
Power change
IR 05000338/200700331 July 2007IR 05000338-07-003, IR 05000339-07-003; 04/01- 06/30/2007; North Anna Power Station, Units 1 & 2; Other ActivitiesBoric Acid
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Water Inventory Control
Weld Overlay
Internal Flooding
Hydrostatic
Coatings
Reserve Station Service Transformer
Nondestructive Examination
Temporary Modification
VT-2
Emergency Lighting
Significance Determination Process
Design basis earthquake
Foreign Material Exclusion
Annual Radiological Environmental Operating Report
Operability Determination
Code Reconciliation
Maintenance Rule Program
Fire Protection Program
IR 05000338/200700430 October 2007IR 05000338-07-004 and 05000339-07-004; on 07/01/2007 - 09/30/2007; North Anna Power Station, Units 1 & 2, Routine Integrated Resident and Regional Report. Inservice InspectionBoric Acid
Ultimate heat sink
Fire Barrier
Water Inventory Control
Weld Overlay
Nondestructive Examination
Temporary Modification
VT-2
Significance Determination Process
Operability Determination
Maintenance Rule Program
Biofouling
Liquid penetrant
Fire Protection Program
DM weld
IR 05000338/200700531 January 2008IR 05000338-07-005, 05000339-07-005 on 10/01/2007 - 12/31/2007 for North Anna, Units 1 & 2, Refueling and Outage ActivitiesFire Barrier
Water Inventory Control
Enforcement Discretion
Coatings
Temporary Modification
Emergency Lighting
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Maintenance Rule Program
Control of Heavy Loads
Fire Protection Program
IR 05000338/200700613 March 2007IR 05000338-07-006, 05000339-07-006, 12/11/2006 - 02/09/2007; North Anna Power Station Units 1 & 2; Component Design Bases InspectionProbabilistic Risk Assessment
Job Performance Measure
Operability Determination
Time Critical Operator Action
IR 05000338/20074019 July 2007NRC Material Control and Accounting Program Inspection - Report 05000338-07-401 and 05000339-07-401Affidavit
IR 05000338/200740220 June 2007IR 05000338-07-402 and 05000339-07-402, on 05/25/2007, North Anna Power Station - NRC Physical Security Baseline InspectionAffidavit
IR 05000338/20075016 September 2007IR 05000338-07-501 and 05000339-07-501, on 08/06-10/2007, North Anna, Units 1 and 2, Baseline Inspection
IR 05000338/200800230 April 2008IR 05000338-08-002, 05000339-08-002 on 03/31/2008 for North AnnaFire Barrier
Internal Flooding
Temporary Modification
Significance Determination Process
Job Performance Measure
Operability Determination
Maintenance Rule Program
Fire Protection Program
Power change
IR 05000338/200800428 October 2008IR 05000338-08-004, 05000339-08-004; 07/01/2008 - 09/30/2008; North Anna Power Station, Units 1 and 2; Routine Integrated Report, Other ActivitiesBoric Acid
Fire Barrier
Water Inventory Control
Weld Overlay
Internal Flooding
Reserve Station Service Transformer
Nondestructive Examination
Significance Determination Process
Operability Determination
Earthquake
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
IR 05000338/200800528 January 2009IR 05000338-08-005, 05000339-08-005, on 10/01/2008 - 12/31/2008, North Anna Power Station, Units 1 and 2; Routine Integrated Report, Fire ProtectionSafe Shutdown
High Radiation Area
Fire Barrier
Tornado Missile
Water Inventory Control
Weld Overlay
Reserve Station Service Transformer
Temporary Modification
Emergency Lighting
Locked High Radiation Area
Significance Determination Process
Tornado Missile Protection
Foreign Material Exclusion
Process Control Program
Operability Determination
Maintenance Rule Program
Fire Protection Program