|
---|
Category:Inspection Report
MONTHYEARIR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 IR 05000338/20240102024-05-24024 May 2024 NRC Fire Protection Team Inspection (FPTI) Report 05000338/2024010 and 05000339/2024010 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 IR 05000338/20244012024-03-0808 March 2024 Security Baseline Inspection Report 05000338/2024401, 05000339/2024401 and 07200016/2024401 IR 05000338/20230062024-02-28028 February 2024 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 - NRC Inspection Reports 05000338/2023006 and 05000339/2023006 IR 05000338/20230042024-02-12012 February 2024 Integrated Inspection Report 05000338/2023004 and 05000339/2023004 IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 IR 05000338/20230052023-08-25025 August 2023 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338 2023005 and 05000339 2023005) IR 05000338/20230022023-08-0909 August 2023 Integrated Inspection Report 05000338/2023002 and 05000339/2023002 IR 05000338/20234012023-07-13013 July 2023 Security Baseline Inspection Report 050003382023401 and 050003392023401 - Cover Letter IR 05000338/20230102023-05-31031 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000338/2023010 and 05000339/2023010 IR 05000338/20230012023-05-0202 May 2023 Integrated Inspection Report 05000338/2023001 and 05000339/2023001 IR 05000338/20220062023-03-0101 March 2023 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 - NRC Inspection Reports 05000338/2022006 and 05000339/2022006 IR 05000338/20220042023-02-0909 February 2023 Integrated Inspection Report 05000338/2022004 and 05000339/2022004 IR 05000338/20224402023-02-0101 February 2023 NRC Security Inspection Report 05000338/2022440 and 05000339/2022440 and Investigation Report 2-2021-001 and Notice of Violation Cover Letter IR 05000338/20224012023-01-31031 January 2023 Material Control and Accounting Program Inspection Report 05000338/2022401 and 05000339/2022401 - Cover ML23013A0142023-01-13013 January 2023 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000338/2023403 and 05000339/2023403 IR 05000338/20220032022-12-20020 December 2022 Reissue - North Anna Power Station Integrated Inspection Report 05000338/2022003 and 05000339/2022003 IR 05000338/20220012022-12-15015 December 2022 Reissue - North Anna Power Station Integrated Inspection Report 05000338/2022001 and 05000339/2022001 and 07200056/2022001 ML22311A5422022-11-0707 November 2022 Integrated Inspection Report 05000338/2022003 and 05000339/2022003 IR 05000338/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000338 2022010 and 05000339 2022010 IR 05000338/20224022022-08-31031 August 2022 Security Baseline Inspection Report 05000338/2022402 and 05000339/2022402 IR 05000338/20220052022-08-30030 August 2022 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 Reports 05000338/2022005 and 05000339/2022005 IR 05000338/20220022022-08-11011 August 2022 Integrated Inspection Report 05000338/2022002 and 05000339/2022002 IR 05000339/20220012022-05-13013 May 2022 Integrated Inspection Report 05000338/ 2022001 and 05000339/2022001 and 07200056/2022001 IR 05000338/20210062022-03-0202 March 2022 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 (Reports No. 05000338/2021006 and 05000339/2021006) IR 05000338/20210042022-02-14014 February 2022 Integrated Inspection Report, 05000338/2021004 and 05000339/2021004 IR 05000338/20214032021-12-0808 December 2021 Security Baseline Inspection Report 05000338/2021403 and 05000339/2021403 IR 05000338/20210102021-11-18018 November 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000338/2021010 and 05000339/2021010 IR 05000338/20210032021-11-12012 November 2021 Integrated Inspection Report 05000338/2021003 and 05000339/2021003 IR 05000338/20210132021-10-13013 October 2021 Biennial Problem Identification and Resolution Inspection Report 05000338/2021013 and 05000339/2021013 IR 05000338/20210052021-08-31031 August 2021 Mid-Cycle Letter Revised Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2021005 and 05000339/2021005) IR 05000338/20210022021-07-27027 July 2021 Integrated Inspection Report 05000338/2021002 and 05000339/2021002 ML21196A4112021-07-19019 July 2021 Inspection Report IR 05000338/20210122021-06-25025 June 2021 Triennial Fire Protection Inspection Report 05000338/2021012 and 05000339/2021012 IR 05000338/20214042021-06-14014 June 2021 Security Baseline Inspection Report 05000338/2021404 and 05000339/2021404 IR 05000338/20214022021-05-25025 May 2021 Unit and 2 - Security Baseline Inspection Report 05000338/2021402 and 05000339/2021402 IR 05000338/20210012021-05-11011 May 2021 Integrated Inspection Report 05000338/2021001 and 05000339/2021001 IR 05000338/20200062021-03-0303 March 2021 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 NRC Inspection Reports 05000338/2020006 and 05000339/2020006 IR 05000338/20214012021-02-10010 February 2021 Security Baseline Inspection Report 05000338/2021401, 05000339/2021401, 07200016/2021401, and 07200056/2021401 IR 05000338/20200042021-01-28028 January 2021 Integrated Inspection Report 05000338/2020004 and 05000339/2020004; 07200016/2020002 IR 05000339/20204112020-12-22022 December 2020 Cyber Security Inspection Report 05000338/ 2020411 and 05000339/2020411 (Public) IR 05000338/20200032020-11-0505 November 2020 Integrated Inspection Report 05000338/2020003 and 05000339/2020003 and Exercise of Enforcement Discretion 2024-09-23
[Table view] Category:Letter
MONTHYEARML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240102024-05-24024 May 2024 NRC Fire Protection Team Inspection (FPTI) Report 05000338/2024010 and 05000339/2024010 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 ML24086A4292024-03-25025 March 2024 Response to Request for Additional Information Associated with Alternative Request N1-I5-NDE-007 Request to Deter Additional Required Reactor Coolant Pump Casing Inspection ML24082A2742024-03-22022 March 2024 Request for Approval of Alternative Request N1-I5-NDE-007 to Deter Additional Required Reactor Coolant Pump Casing Inspection ML24086A4682024-03-21021 March 2024 Summary of Facility Changes, Tests and Experiments ML24005A0042024-03-18018 March 2024 Issuance of Amendment Nos. 296 and 279, Regarding Revised Emergency Plan for Relocation of the Technical Support Center 2024-09-24
[Table view] |
Text
SUBJECT:
NORTH ANNA NUCLEAR POWER STATION - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT 05000338/2004007, 05000339/2004007
Dear Mr. Christian:
On April 30, 2004, the NRC completed an inspection at your North Anna Nuclear Power Station.
Portions of the access authorization inspection were completed at the Dominion Energy Corporate Office from April 26-27, 2004. The enclosed report documents the inspection findings, which were discussed on April 30, 2004, with N. Lane and other members of your staff.
This inspection examined activities conducted under your licenses as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your licenses. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will not be placed in the Public Document Room.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, without the enclosure, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED
VEPCO 2 DOCUMENT CONTAINS Should you have any questions concerning this letter, please contact us.
Sincerely,
/RA/
Anne T. Boland, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-338, 50-339 License Nos. NPF-4, NPF-7 Enclosure: NRC Inspection Report No. 05000338/2004007, 05000339/2004007 w/Attachment: Supplemental Information (Safeguards Information)
cc w/encl (Safeguards Information):
Chris L. Funderburk, Director Nuclear Licensing and Operations Support Virginia Electric and Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 Jack M. Davis Site Vice President North Anna Power Station P. O. Box 402 Mineral, VA 23117 cc w/o encl:
Executive Vice President Old Dominion Electric Cooperative 4201 Dominion Boulevard Glen Allen, VA 23060 (cc w/o encl contd - See page 3)
DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED
VEPCO 3 DOCUMENT CONTAINS (cc w/o encl contd)
County Administrator Louisa County P. O. Box 160 Louisa, VA 23093 Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
Millstone Power Station Building 475, 5th Floor Rope Ferry Road Rt. 156 Waterford, Connecticut 06385 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Distribution w/encl: (Safeguards Information)
B. Westreich, NSIR (hard copy w/encl)
E. McNiel, NSIR (hard copy w/encl)
Distribution w/o encl:
S. Monarque, NRR L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC OFFICE RII:DRS RII:DRS RII:DRS RII:DRP SIGNATURE RA RA RA RA NAME JWALLO JSHEHEE ABOLAND LANDIS DATE 05/26 /04 05/26 /04 05/26 /04 05/26 /04 E-MAIL YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC YES w/o SGI OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML041600297.wpd DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED