June 20, 2007

SUBJECT:

NORTH ANNA POWER STATION - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT 05000338/2007402, 05000339/2007402

Dear Mr. Christian:

On May 25, 2007, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your North Anna Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with Mr. L. Lane and other members of your staff on May 25, 2007. A re-exit was conducted with Mr. T. Maddy and other site personnel on June 20, 2007. This report also covers the inspection results of Interim Compensatory Measures specified in Independent Spent Fuel Storage Installation Order (TI2690), dated October 16, 2002, which was discussed with Mr. P. Kemp and other members of your staff on March 15, 2006.

This inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390 a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs

VEPCO 2 document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this letter, please contact us.

Sincerely,

/RA/

Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-338, 50-339 License Nos.: NPF-4, NPF-7 Enclosure:

NRC Inspection Report No. 05000338/2007402, 05000339/2007402 w/Attachment: Supplemental Information (Official Use Only - Security Related Information)

VEPCO DOCUMENT CONTAINS 3 cc w/encl:

Chris L. Funderburk, Director Nuclear Licensing and Operations Support Virginia Electric and Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 D. G. Stoddard, Site Vice President North Anna Power Station P. O. Box 402 Mineral, VA 23117 P. A. Kemp Supervisor Licensing North Anna Power Station P.O. Box 402 Mineral, VA 23117-0402 cc w/o Enclosure:

Executive Vice President Old Dominion Electric Cooperative 4201 Dominion Boulevard Glen Allen, VA 23060 County Administrator Louisa County P. O. Box 160 Louisa, VA 23093 Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

Millstone Power Station Building 475, 5th Floor Rope Ferry Road Rt. 156 Waterford, Connecticut 06385 Attorney General Supreme Court Building 900 East Main Street Richmond, VA