Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000285/LER-2016-0018 April 2016Technical Specification Violation due to Installation of an Unqualified Part in a Radiation Monitor
LER 16-001-00 for Fort Calhoun, Unit 1 Regarding Technical Specification Violation due to Installation of an Unqualified Part in a Radiation Monitor
Past operability
05000285/LER-2016-0027 July 2016Unanalyzed Condition Shutdown Heat Exchanger Isolations ti
LER 16-002-00 for Fort Calhoun, Unit 1, Regarding Unanalyzed Condition Shutdown Heat Exchanger Isolations
Unanalyzed Condition
05000285/LER-2016-00322 August 2016Unplanned Turbine Trip during DCS Modification due to Failure to Identify and Disable the Transmitter Deviation Based Trip
LER 16-003-00 for Fort Calhoun, Unit 1, Regarding Unplanned Turbine Trip During DCS Modification Due to Failure to Identify and Disable the Transmitter Deviation Based Trip
05000285/LER-2017-00111 May 2017Unprotected Vital Area Barrier Due to Maintenance
LER 17-001-00 for Fort Calhoun Station, Unit 1, Regarding Unprotected Vital Area Barrier Due to Maintenance
BSEP 10-0056, Independent Spent Fuel Storage Installation - Quality Assurance Program26 April 2010Independent Spent Fuel Storage Installation - Quality Assurance Program
BSEP 11-0021, Independent Spent Fuel Storage Installation - Registration and Use of Cask to Store Spent Fuel7 February 2011Independent Spent Fuel Storage Installation - Registration and Use of Cask to Store Spent Fuel
BSEP 11-0023, Independent Spent Fuel Storage Installation - Registration and Use of Casks to Store Spent Fuel and System Thermal Performance Assessment21 February 2011Independent Spent Fuel Storage Installation - Registration and Use of Casks to Store Spent Fuel and System Thermal Performance Assessment
BSEP 11-0025, Registration and Use of Cask to Store Spent Fuel and System Thermal Performance Assessment24 February 2011Registration and Use of Cask to Store Spent Fuel and System Thermal Performance Assessment
BSEP 13-0016, ISFSI - Registration and Use of Cask to Store Spent Fuel12 February 2013ISFSI - Registration and Use of Cask to Store Spent Fuel
BSEP 13-0057, ISFSI - Registration and Use of Cask to Store Spent Fuel5 June 2013ISFSI - Registration and Use of Cask to Store Spent Fuel
BSEP 14-0098, Independent Spent Fuel Storage Installation (ISFSI) - Registration and Use of Casks to Store Spent Fuel28 August 2014Independent Spent Fuel Storage Installation (ISFSI) - Registration and Use of Casks to Store Spent Fuel
BSEP 15-0077, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Cask2 September 2015Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Cask
BSEP 15-0079, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Cask23 September 2015Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Cask
BSEP 15-0081, Regarding Storage of Dry Fuel Under Cask Certificate of Compliance 72-1004, Amendment 1023 September 2015Regarding Storage of Dry Fuel Under Cask Certificate of Compliance 72-1004, Amendment 10
BSEP 16-0033, Registration for Use of General License Spent Fuel Cask12 May 2016Registration for Use of General License Spent Fuel Cask
BSEP 16-0036, Registration for Use of General License Spent Fuel Cask12 May 2016Registration for Use of General License Spent Fuel Cask
BSEP 16-0041, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Cask6 June 2016Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Cask
BSEP 17-0071, ISFSI - Registration for Use of General License Spent Fuel Casks15 August 2017ISFSI - Registration for Use of General License Spent Fuel Casks
BSEP 17-0076, Registration for Use of General License Spent Fuel Casks6 September 2017Registration for Use of General License Spent Fuel Casks
CNL-22-031, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions22 March 2022Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)6 November 2015Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)
CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)25 February 2016Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)
CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 197114 July 2011G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971Fukushima Dai-Ichi
Significance Determination Process
Earthquake
Backfit
IR 05000206/201900420 February 2020Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 05000206/2019 004; 05000361/2019 007; 05000362/2019 007; and 07200054/2019-002
IR 05000282/201100913 May 2011IR 05000282-11-009, 05000306-11-009, on 03/23/2011 - 04/29/2011; Prairie Island Nuclear Generating Plant, Units 1 and 2, Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage EventSafe Shutdown
Internal Flooding
B.5.b
Seismically rugged
Design basis earthquake
Severe Accident Management Guideline
Earthquake
IR 05000285/200200226 July 2002IR 05000285-02-002, on 03/31-06/29/2002, Fort Calhoun, Integrated Resident & Regional Report; Refueling and Outage ActivitiesBoric Acid
High Radiation Area
Stroke time
Weld Overlay
Nondestructive Examination
Temporary Modification
VT-2
Significance Determination Process
Foreign Material Exclusion
Liquid penetrant
Fire Protection Program
IR 05000285/200200421 October 2002IR 05000285-02-004, on 06/30-09/28/2002, Omaha Public Power District, Fort Calhoun Station, Integrated Resident and Regional Report; Equipment Alignments; Operability EvaluationsInternal Flooding
Significance Determination Process
Safeguards Contingency Plan
Maintenance Rule Program
IR 05000285/200200521 January 2003IR 05000285-02-005 on 09/29-12/28/2002, Omaha Public Power District, Fort Calhoun Station, Integrated Resident and Regional Report. No Violations NotedHigh Radiation Area
Contraband
Job Performance Measure
Siren
IR 05000285/200200830 July 2002EA-02-123, Omaha Public Power District, Fort Calhoun Station, Final Significance Determination for a White Finding & Notice of Violation (IR 05000285-02-008; Fort Calhoun Station)Significance Determination Process
Preliminary White Finding
IR 05000285/20020096 October 2002IR 05000285-02-009 on September 16-20, 2002, Omaha Public Power District. Radiation Safety Team InspectionOffsite Dose Calculation Manual
Process Control Program
IR 05000285/200201027 August 2003IR 05000285-02-010, Fort Calhoun Station, Midcycle Performance Review and Inspection Plan
IR 05000285/200201130 December 2002IR 05000285-02-011; 10/28-11/1/2002; Omaha Public Power Districtl Fort Calhoun Station; Ti 2515/148, Verification of Compliance with Interim Compensatory Measures Order
IR 05000285/200230124 September 2002Er 05000285-02-301, on 09/6-12/2002, Omaha Public Power District; Fort Calhoun Station, Initial Examination of Applicants for Operator Licenses
IR 05000285/20030014 March 2003Annual Assessment Letter - Fort Calhoun Station (Report 50-285/03-01)
IR 05000285/200300228 February 2003IR 05000285-03-002; on 12/16-20/2002 and 1/13-17/2003; Omaha Public Power District; Fort Calhoun Station, Triennial Fire Protection InspectionSafe Shutdown
Boric Acid
Fire Barrier
Emergency Lighting
Significance Determination Process
Exemption Request
Fire Protection Program
Hourly Fire Watch
IR 05000285/200300316 April 2003IR 05000285-03-003, on 12/29/2002-03/22/2003; Omaha Public Power District; Fort Calhoun Station, Integrated Resident and Regional Report, Adverse WeatherUltimate heat sink
Temporary Modification
Significance Determination Process
Frazil ice
Maintenance Rule Program
Power change
IR 05000285/200300414 July 2003IR 05000285-03-004, on 03/23/2003 - 06/21/2003; for Fort Calhoun Station, Integrated Resident and Regional ReportInternal Flooding
Probabilistic Risk Assessment
Scaffolding
IR 05000285/200300517 October 2003IR 05000285-03-005, on 06/22/2003 - 09/20/2003, Omaha Public Power District, Fort Calhoun Station, Integrated Resident and Regional Report; Postmaintenance and Surveillance TestingInternal Flooding
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Grace period
Downpower
Siren
IR 05000285/20030064 February 2004IR 05000285-03-006 on 09/21/2003 - 12/31/2003 for Fort Calhoun Station, Integrated Resident and Regional Report; Maintenance Rule Implementation, Nonroutine Evolutions and Events, Refueling Activities, Access Control, Event FollowupBoric Acid
Reactor Vessel Water Level
High Radiation Area
Nondestructive Examination
Temporary Modification
VT-2
Significance Determination Process
Maintenance Rule Program
Deep Dose Equivalent
Fuel cladding
Liquid penetrant
Scaffolding
Substantial potential for overexposure
IR 05000285/200300817 June 2003IR 05000285-03-008; on 04/28 - 05/08/03, for Omaha Public Power District, Fort Calhoun Station; Biennial Baseline Inspection of the Problem Identification and ResolutionFitness for Duty
Contraband
Foreign Material Exclusion
Operability Determination
Deep Dose Equivalent
IR 05000285/200301024 June 2004IR 05000285-03-010, - Fort Calhoun Station - No Report to Be Issued
IR 05000285/20030119 January 2004IR 05000285-03-011; 11/03 - 12/12/2003; Fort Calhoun Station; Evaluation of Changes, Tests, or Experiments, and Safety System Design and Performance CapabilitySafe Shutdown
Mission time
Stroke time
Probabilistic Risk Assessment
Significance Determination Process
Fuel cladding
Operability Assessment
IR 05000285/20040013 March 2004Annual Assessment Letter - Fort Calhoun Station (NRC Report 05000285-04-001)Fitness for Duty
High Radiation Area
IR 05000285/20040022 February 2005IR 05000285-04-002 and IR 05000285-04-003 Errata; Omaha Public Power District; Fort Calhoun StationSignificance Determination Process
IR 05000285/200400412 November 2004IR 05000285-04-004, 07200054-04-001, on 07/01/2004 - 09/30/2004; Fort Calhoun Station, Integrated Resident and Regional ReportHigh winds
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Missed surveillance
IR 05000285/20040053 February 2005IR 05000285-04-005 on 10/01/2004 - 12/31/2004 for Fort Calhoun Station, Integrated Resident and Regional Report, Licensed Operator Requalification, and Occupational Radiation SafetySafe Shutdown
Boric Acid
High Radiation Area
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Job Performance Measure
Frazil ice
Substantial potential for overexposure
Siren
Overexposure
IR 05000285/200400610 May 2004IR 05000285-04-006, on 04/12/2004 - 04/23/2004, Fort Calhoun Station; Security Review of Fitness-For-Duty Work Hour Controls and Event Review
IR 05000285/200400719 October 2004IR 05000285-04-007; 09/20/2004 - 09/24/2004; Fort Calhoun Station; Radioactive Material Control ProgramHigh Radiation Area
Offsite Dose Calculation Manual
Significance Determination Process
IR 05000285/200430116 April 2004Er 05000285-04-301 on March 15-18, 2004; Fort Calhoun Station, Initial Operator Licensing Examination
IR 05000285/20050012 March 2005Annual Assessment Letter - Fort Calhoun Station (Report 05000285/2005001)Significance Determination Process