Category:Letter
MONTHYEARML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf IR 05000285/20230032023-07-10010 July 2023 NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska ML23151A0032023-06-0505 June 2023 Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, Shpo; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commission'S Analysis of Omaha Public Power District'S Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1252022-08-0303 August 2022 Letter to Mr. Timothy Rhodd, Chairperson, Iowa Tribe of Kansas and Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1262022-08-0303 August 2022 Letter to Roger Trudell, Chairman, Santee Sioux Nation, Nebraska, Re., Ft Calhoun LTP Section 106 ML22101A1092022-08-0303 August 2022 Letter to Mr. Durell Cooper, Chairman, Apache Tribe of Oklahoma; Re., Ft Calhoun LTP Section 106 ML22138A1242022-08-0303 August 2022 Letter to Mr. Reggie Wassana, Governor, Cheyenne and Arapaho Tribes, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1292022-08-0303 August 2022 Letter to Tiauna Carnes, Chairperson, Sac and Fox Nation of Missouri in Kansas, Re., Ft Calhoun LTP Section 106 ML22138A1212022-08-0303 August 2022 Letter to Mr. Edgar Kent, Chairman, Iowa Tribe of Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1282022-08-0303 August 2022 Letter to Victoria Kitcheyan, Chairwoman, Winnebago Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1232022-08-0303 August 2022 Letter to Mr. Leander Merrick, Chairperson, Omaha Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1272022-08-0303 August 2022 Letter to Vern Jefferson, Chairman, Sac and Fox Tribe of the Mississippi in Iowa, Re., Ft Calhoun LTP Section 106 ML22214A0922022-08-0303 August 2022 Letter to Stacy Laravie, Thpo, Ponca Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22159A2152022-06-28028 June 2022 Letter Forwarding FRN on Public Meeting and Request for Comment on License Termination Plan LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information IR 05000285/20220032022-06-15015 June 2022 NRC Inspection Report 05000285/2022003 ML22119A2472022-05-0303 May 2022 Review of Amendment Request to Add a LC to Include LTP Requirements, RAI for Environmental Review IR 05000285/20220022022-04-28028 April 2022 NRC Inspection Report 050-00285/2022-002 LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report 2024-01-31
[Table view] Category:License-Operator
MONTHYEARML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 LIC-16-0056, Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations.2016-07-0707 July 2016 Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations. ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 IR 05000285/20153012016-01-20020 January 2016 Er 05000285/2015301; 12/07/2015 - 01/13/2016; Fort Calhoun Station; Initial Operator Licensing Examination Report ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16012A3272015-12-14014 December 2015 2015-12 Draft Outline Comments ML16012A3242015-12-14014 December 2015 2015-12 Draft Outlines ML16012A3372015-12-14014 December 2015 2015-12-DRAFT Written Examination Comments ML16012A3392015-12-14014 December 2015 2015-12 Draft Operating Test ML16012A3452015-12-14014 December 2015 2015-12 Draft Operating Test Comments ML16012A3652015-12-14014 December 2015 2015-12 Final Operating Test ML16012A3672015-12-14014 December 2015 2015-12 Post-Examination Comments ML16012A3492015-12-14014 December 2015 2015-12-FINAL Outlines ML16021A1072015-12-14014 December 2015 2015-12 Public Forms ML15334A4862015-11-30030 November 2015 2015-12-Exam Approval Ltr_ LIC-15-0137, Revised Final Initial Licensed Operator Examination2015-11-24024 November 2015 Revised Final Initial Licensed Operator Examination LIC-15-0127, for Calhoun Station, Unit 1 - Provides the Final Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications2015-11-24024 November 2015 for Calhoun Station, Unit 1 - Provides the Final Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications ML14237A2332014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test Comments ML14237A2292014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test ML14237A2072014-07-31031 July 2014 ANO2-2014-07 Draft Outlines ML14181A3842014-06-30030 June 2014 Generic Fundamentals Examination Results June 2014 LIC-14-0076, 2014-05 Post Exam Analysis2014-06-0606 June 2014 2014-05 Post Exam Analysis ML14184B2982014-05-23023 May 2014 2014-04 Public Forms ML14181A0302014-05-22022 May 2014 2014-05 Final Operating Test ML14184B1482014-05-22022 May 2014 2014-05 Draft Operating Test ML14184B1472014-05-22022 May 2014 2014-04 Draft Written Exam ML14184B1492014-05-22022 May 2014 2014-05 Draft Written Exam Comments ML14184B3092014-05-22022 May 2014 2014-05 Draft Outline ML14184B3212014-05-22022 May 2014 2014-05-Draft Outline Comments ML14267A3282014-05-22022 May 2014 2014-05 Final Outlines ML14184B1632014-05-22022 May 2014 2014-05-Draft Operating Test Comments ML14128A1182014-05-0808 May 2014 2014-05-Examination Approval ML14063A6242014-03-0404 March 2014 IR 05000285-14-301, 02/16/2013, Fort Calhoun, Revision to Notification of NRC Initial Operator ML12291A7362012-09-21021 September 2012 09 Post Exam Analysis ML12291A7322012-09-21021 September 2012 2012-09 Final Written Exam ML12325A3882012-09-21021 September 2012 Fc 2012-09 Draft Outlines ML12325A3962012-09-21021 September 2012 FC-2012-09-DRAFT Outline Comments ML12325A3982012-09-21021 September 2012 2012-09 Draft Retake Written Exam ML12325A4082012-09-21021 September 2012 Fc 2012-09 Final Outlines ML12325A4142012-09-21021 September 2012 Fc 2012-09 Post Exam Analysis ML12325A4202012-09-21021 September 2012 09 Public Forms ML12325A4032012-09-21021 September 2012 FC-2012-09 Draft Written Exam Comments Steely ML1226300422012-09-19019 September 2012 NRC Initial Operator Licensing Examination Approval ML12180A4522012-06-28028 June 2012 Notification of NRC Retake Operator Licensing Examination 05000285/2012302 LIC-12-0055, FCS 2012-04 Post Exam Comments and Analysis2012-04-26026 April 2012 FCS 2012-04 Post Exam Comments and Analysis ML12157A2832012-04-20020 April 2012 FCS 2012-04 Draft Operating Test Comments ML12153A2782012-04-20020 April 2012 FC-2012-04 Final Written and Op Test Outlines ML12156A0032012-04-20020 April 2012 FC-2012-04 Final Operating Test ML12156A0052012-04-20020 April 2012 2012-04 Final Written Exam ML12156A3292012-04-20020 April 2012 FC-2012-04 Draft Outlines 2017-01-13
[Table view] Category:Part 55 Examination Related Material
MONTHYEARLIC-16-0056, Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations.2016-07-0707 July 2016 Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations. ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 IR 05000285/20153012016-01-20020 January 2016 Er 05000285/2015301; 12/07/2015 - 01/13/2016; Fort Calhoun Station; Initial Operator Licensing Examination Report ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16012A3392015-12-14014 December 2015 2015-12 Draft Operating Test ML16012A3242015-12-14014 December 2015 2015-12 Draft Outlines ML16012A3272015-12-14014 December 2015 2015-12 Draft Outline Comments ML16012A3372015-12-14014 December 2015 2015-12-DRAFT Written Examination Comments ML16012A3452015-12-14014 December 2015 2015-12 Draft Operating Test Comments ML16012A3492015-12-14014 December 2015 2015-12-FINAL Outlines ML16012A3652015-12-14014 December 2015 2015-12 Final Operating Test ML16012A3672015-12-14014 December 2015 2015-12 Post-Examination Comments ML16021A1072015-12-14014 December 2015 2015-12 Public Forms ML15334A4862015-11-30030 November 2015 2015-12-Exam Approval Ltr_ ML14237A2332014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test Comments ML14237A2292014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test ML14237A2072014-07-31031 July 2014 ANO2-2014-07 Draft Outlines ML14181A3842014-06-30030 June 2014 Generic Fundamentals Examination Results June 2014 LIC-14-0076, 2014-05 Post Exam Analysis2014-06-0606 June 2014 2014-05 Post Exam Analysis ML14184B2982014-05-23023 May 2014 2014-04 Public Forms ML14184B3092014-05-22022 May 2014 2014-05 Draft Outline ML14184B1632014-05-22022 May 2014 2014-05-Draft Operating Test Comments ML14184B1492014-05-22022 May 2014 2014-05 Draft Written Exam Comments ML14184B1482014-05-22022 May 2014 2014-05 Draft Operating Test ML14184B1472014-05-22022 May 2014 2014-04 Draft Written Exam ML14267A3282014-05-22022 May 2014 2014-05 Final Outlines ML14181A0302014-05-22022 May 2014 2014-05 Final Operating Test ML14184B3212014-05-22022 May 2014 2014-05-Draft Outline Comments ML14128A1182014-05-0808 May 2014 2014-05-Examination Approval ML12291A7362012-09-21021 September 2012 09 Post Exam Analysis ML12291A7322012-09-21021 September 2012 2012-09 Final Written Exam ML12325A3882012-09-21021 September 2012 Fc 2012-09 Draft Outlines ML12325A3962012-09-21021 September 2012 FC-2012-09-DRAFT Outline Comments ML12325A3982012-09-21021 September 2012 2012-09 Draft Retake Written Exam ML12325A4082012-09-21021 September 2012 Fc 2012-09 Final Outlines ML12325A4142012-09-21021 September 2012 Fc 2012-09 Post Exam Analysis ML12325A4202012-09-21021 September 2012 09 Public Forms ML12325A4032012-09-21021 September 2012 FC-2012-09 Draft Written Exam Comments Steely ML1226300422012-09-19019 September 2012 NRC Initial Operator Licensing Examination Approval ML12180A4522012-06-28028 June 2012 Notification of NRC Retake Operator Licensing Examination 05000285/2012302 LIC-12-0055, FCS 2012-04 Post Exam Comments and Analysis2012-04-26026 April 2012 FCS 2012-04 Post Exam Comments and Analysis ML12156A3392012-04-20020 April 2012 FCS 2012-04 Draft Outline Comments ML12153A2782012-04-20020 April 2012 FC-2012-04 Final Written and Op Test Outlines ML12156A0032012-04-20020 April 2012 FC-2012-04 Final Operating Test ML12156A0052012-04-20020 April 2012 2012-04 Final Written Exam ML12156A3292012-04-20020 April 2012 FC-2012-04 Draft Outlines ML12156A3432012-04-20020 April 2012 FC-2012-04 Draft Operating Test ML12157A2832012-04-20020 April 2012 FCS 2012-04 Draft Operating Test Comments ML12157A3912012-04-20020 April 2012 2012-04 Draft Written Exam ML12191A2402012-04-20020 April 2012 04 Public Forms 2016-07-07
[Table view] |
Text
ril 16, 2004
SUBJECT:
FORT CALHOUN STATION- NRC EXAMINATION REPORT 05000285/2004-301
Dear Mr. Ridenoure:
On March 18, 2004, the US Nuclear Regulatory Commission (NRC) completed an initial operator licensing examination at Fort Calhoun Station. The enclosed report documents the examination findings, which were discussed on March 18, 2004, with you and other members of your staff.
The examination included an evaluation of six applicants for operator licenses and four applicants for senior operator licenses. The examinations were developed using NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors," Draft Revision 9. The examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
No findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure(s), and your response will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Anthony T. Gody, Chief Operations Branch Division of Reactor Safety Docket: 50-285 License: DPR-40
Omaha Public Power District -2-
Enclosure:
NRC Inspection Report 05000285/2004-301
REGION IV==
Docket: 50-285 License: DPR-40 Report No.: 05000285/2004-301 Licensee: Omaha Public Power District Facility: Fort Calhoun Station Location: Ft. Calhoun, NE Dates: March 15-18, 2004 Inspectors: M. Murphy, Senior Operations Engineer, Operations Branch T. Stetka, Senior Operations Engineer, Operations Branch G. Werner, Senior Operations Engineer, Operations Branch J. Drake, Operations Engineer, Operations Branch Approved By: A. Gody, Chief Operations Branch Division of Reactor Safety
-2-SUMMARY OF FINDINGS ER 05000285/2004-301 on March 15-18, 2004; Fort Calhoun Station, initial operator licensing examination.
NRC examiners evaluated the competency of six applicants for operator licenses and four applicants for senior operator licenses. The licensee developed the examination using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Draft Revision 9. The licensee provided proctors for the administration of the written examination to all applicants on March 12, 2004, in accordance with instructions provided by the chief examiner. The NRC examiners administered the operating test on March 15-18, 2004.
No findings of significance were identified.
REPORT DETAILS 4. OTHER ACTIVITIES 4OA4 Initial License Examination
.1 Operator Knowledge and Performance a. Examination Scope The NRC examination team administered the operating test to the 10 applicants on March 15-18, 2004. The reactor operator applicants participated in two or three dynamic simulator scenarios, a control room and facilities walkthrough test consisting of 11 system tasks, and an administrative test consisting of 1 task in each of four areas.
The 2 applicants for upgrading their operator license to a senior operator license participated in three scenarios and took a control room and facilities walkthrough test consisting of 5 system tasks. The 2 applicants seeking an instant senior operator license participated in three dynamic simulator scenarios, and took a control room and facilities walkthrough test consisting of 10 system tasks. The administrative test for all senior operator applicants consisted of performing tasks in five areas.
On March 12, 2004, the licensee proctored the administration of the written examinations to all 10 applicants and provided the proposed grades together with the performance analysis to the NRC for approval.
b. Findings All applicants passed all parts of the examinations. For the written examinations, the average score for the operator applicants was 91 percent, and the average score for senior operator applicants was 93 percent. The operator applicant scores ranged from 87 to 96 percent, and the senior operator applicant scores ranged from 90 to 96 percent.
The licensee conducted a performance analysis for the written examinations with emphasis on five questions missed by half or more of the applicants. After reviewing the licensees analysis, the examiners concluded that all questions were valid and that there were only minor training deficiencies requiring the licensee to address in its corrective action program. Licensee personnel indicated that any training deficiencies would also be reviewed to determine impact on licensed operator requalification training.
There were no post-examination comments provided on examination questions. The text of the examination questions and the performance analysis may be accessed in the ADAMS system as noted in the attachment.
.2 Initial Licensing Examination Development The licensee developed the examination in accordance with NUREG-1021, Draft Revision 9. Licensee facility training and operations staff involved in examination development were on a security agreement.
-2-
.2.1 Operating Examination Outline and Examination Package a. Examination Scope The licensee staff submitted the operating test outlines on November 25, 2003. The chief examiner reviewed the submittal against the requirements of NUREG-1021, Draft Revision 9. The draft examination package was received by the NRC on January 20, 2004. Examiners reviewed the examination against the requirements of NUREG-1021, Draft Revision 9, and provided comments to the licensee on January 26, 2004. The chief examiner conducted an onsite validation of the examinations and provided further comments during the week of February 9, 2004.
b. Findings Examiners approved the initial examination outline with minor comments and advised the licensee to proceed with the operating examination development.
The chief examiner determined that the material initially submitted by the licensee staff were within the range of acceptability expected for a proposed examination.
No findings of significance were identified.
.2.2 Simulation Facility Performance a. Scope The examination team observed simulator performance with regard to plant fidelity during the examination validation and administration.
b. Findings No findings of significance were identified.
2.3 Examination Security a. Scope The examiners reviewed examination security both during the onsite preparation and examination administration weeks with respect to NUREG-1021 requirements.
b. Findings No findings of significance were identified.
4OA6 Meetings, Including Exit On March 18, 2004, the examiners presented the examination results to Mr. R. and other members of his staff who acknowledged the findings.
The inspectors confirmed that proprietary information was not provided or reviewed during the examination process.
ATTACHMENT KEY POINTS OF CONTACT Licensee personnel D. Bannister, Plant Manager G. Cavanaugh, Supervisor, Station Licensing R. Clemens, Division Manager, Nuclear Assessment P. Cronin, Manager, Shift Operations D. Dryden, Licensing J. Goodell, Manager, Operations J. Herman, Manager, Nuclear Licensing J. Kuzela, Operations Training Instructor R. Ridenoure, Vice President, Nuclear M. Tesar, Division Manger, NSSD D. Weaver, Supervisor, Operations and Technical Training R. Westcott, Manager, Training NRC personnel John Kramer, Senior Resident, Fort Calhoun Station ADAMS DOCUMENTS REFERENCED Accession No.: ML041050781 - Reactor and Senior operator written examination Accession No.: ML041050785 - Written examination performance analysis and applicant questions