Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000272/20020011 March 20022002 Annual Assessment Letter - Salem Nuclear Station - Units 1 & 2 (Report Nos. 50-272/02-001, 50-311/02-001)
IR 05000272/20070012 March 2007Annual Assessment Letter EOC 2006 - Salem Generating Station (Report 05000272-07-001, 05000311-07-001)Enforcement Discretion
IR 05000272/20080013 March 2008Annual Assessment Letter EOC 2007 ROP8 - Salem Station (05000272-08-001, 05000311-08-001)B.5.b
IR 05000272/20090014 March 2009Annual Assessment Letter - Salem Nuclear Generating Station, Units 1 and 2 (05000272-09-001 and 05000311-09-001)
IR 05000272/20100014 March 2011Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2, EOC-11 (Report 05000272/2010001 and 05000311/2010001)
IR 05000272/20110015 March 2012Annual Assessment Letter for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Report 05000272/2011001 and 05000311/2011001)
IR 05000272/20120014 March 2013Annual Assessment Letter for Salem Nuclear Generating Station, Unit 1 and 2 (Report 05000272/2012001 and 05000311/2012001)
IR 05000272/20130014 March 2014ROP-14 2013 Salem Nuclear Generating Station Units 1 and 2, Annual Assessment Letter, Report 05000272-13-001 and 05000311-13-001),and Inspection Plan
IR 05000272/20130063 September 2013ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000272/2013006 and 05000311/2013006
IR 05000272/20140014 March 2015ROP-15 Annual Assessment Letter for Salem Nuclear Generating Station Units 1 and 2 (Report 05000272/2014001 and 05000311/2014001)Aging Management
License Renewal
IR 05000272/20140062 September 2014ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000272/2014006 and 05000311/2014006Spent Fuel Pool Instrumentation
License Renewal
IR 05000272/20150051 September 2015ROP-16 Mid-Cycle Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2015005 and 05000311/2015005)Aging Management
Spent Fuel Pool Instrumentation
License Renewal
IR 05000272/20150062 March 2016ROP 16 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 & 2 (Inspection Report 05000272/2015006 and 05000311/2015006)Aging Management
Spent Fuel Pool Instrumentation
License Renewal
IR 05000272/201600531 August 2016Mid-Cycle Assessment Letter for Salem Nuclear Generating Station - Unit Nos. 1 and 2 (Report 05000272/2016005 and 05000311/2016005)Spent Fuel Pool Instrumentation
IR 05000272/20160061 March 2017Annual Assessment Letter for Salem Nuclear Generating Station (Salem), Units 1 and 2 (Reports 05000272/2016006 and 05000311/2016006)Open Phase Condition
IR 05000272/201700528 August 2017Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2017005 and 05000311/2017005)Spent Fuel Pool Instrumentation
IR 05000272/201700628 February 2018Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2017006, 05000311/2017006, 05000272/2017402, 05000311/2017402, 05000272/2017501, and 05000311/2017501Cyber Security
IR 05000272/201800528 August 2018Updated Inspection Plan (Inspection Reports 05000272/2018005 and 05000311/2018005)License Renewal
IR 05000272/20180064 March 2019Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2018006 and 05000311/2018006)License Renewal
IR 05000272/201900528 August 2019Updated Inspection Plan (Inspection Reports 05000272/2019005 and 05000311/2019005)Fitness for Duty
Open Phase Condition
License Renewal
IR 05000272/20190063 March 2020Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2019006 and 05000311/2019006)Fitness for Duty
Open Phase Condition
IR 05000272/202000531 August 2020Updated Inspection Plan (Inspection Report 05000272/2020005 and 05000311/2020005)Fitness for Duty
Operator Manual Action
Open Phase Condition
Exemption Request
Coronavirus
IR 05000272/20200063 March 2021Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2020006 and 05000311/2020006)Fitness for Duty
Operator Manual Action
Open Phase Condition
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
IR 05000272/20210051 September 2021Updated Inspection Plan for the Salem Nuclear Generating Station (Report 05000272/2021005 and 05000311/2021005)Operator Manual Action
Cyber Security
Open Phase Condition
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
IR 05000272/20210062 March 2022Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2021006 and 05000311/2021006)Cyber Security
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
IR 05000272/202200531 August 2022Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022005 and 05000311/2022005)Fitness for Duty
Commercial Grade Dedication
Cyber Security
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
COVID19
IR 05000272/20220061 March 2023Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006)Fitness for Duty
Commercial Grade Dedication
Cyber Security
Exemption Request
COVID-19
IR 05000272/202300531 August 2023Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005)Fitness for Duty
Cyber Security
IR 07200200/19600012 March 20062006-001 - Annual Assessment Letter - Salem Nuclear Generating Station (Report 05-272/2006001 and 05-311/2006001)
LR-N21-0014, Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 203016 February 2021Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 2030
ML02235005823 August 20022002 Mid-Cycle Performance Review and Inspection Plan - Salem Generating Station Units 1 & 2Power change
ML0306206933 March 20032003 Annual Assessment Letter - Salem Nuclear Generating StationPower change
ML03239051127 August 20032003 Mid-Cycle Performance Review and Inspection Plan for Salem Units 1 and 2
ML0406307983 March 20042003-04 Annual Assessment Letter - SalemFitness for Duty
ML06243065131 August 2006Mid-cycle Performance Review and Inspection Plan - Salem Nuclear Generating Station
ML07243094731 August 2007Mid-Cycle Review and Inspection Plan
ML07347065513 December 2007ROP 8 - Salem - Change to Inspection Plan, 12/13/07
ML0924403091 September 2009Mid-Cycle Performance Review and Inspection Plan - Salem Nuclear Generating Station, Unit Nos. 1 and 2 (September 1, 2009)Dissimilar Metal Weld
ML1006208083 March 2010EOC Letter and Report 22Dissimilar Metal Weld
ML1024403641 September 2010Mid-Cycle Performance Review and Inspection Plan 2010 - Salem Nuclear Generating Station, Units 1 and 2
ML10295058712 March 2010Email from Ohara, Timothy to Conte, Richard, FW: Salem U1 Inspection Plan.Boric Acid
Nondestructive Examination
Dissimilar Metal Weld
ML1124112941 September 2011Mid-Cycle Performance Review and Inspection Plan 2011 - Salem Nuclear Generating Station, Units 1 and 2Severe Accident Management Guideline
ML12248A0404 September 2012Mid-Cycle Performance Review and Inspection Plan 2012 - Salem Nuclear Generating Station, Units 1 and 2
ML19031A09611 October 1977Response to NRC Request for Additional Information for Review of Proposed Inservice Inspection & Testing ProgramsBoric Acid
Hydrostatic
Nondestructive Examination
ML19031A66028 February 197702/28/1977 Letter Inservice Inspection and Testing ProgramsBoric Acid
Stroke time
Weld Overlay
Hydrostatic
Liquid penetrant
ML20077L34920 March 2020Ti 2515/194 Inspection Documentation RequestOpen Phase Condition
ML20281A51713 October 2020Notification of Conduct of a Fire Protection Team InspectionSafe Shutdown
Probabilistic Risk Assessment
Temporary Modification
Time Critical Operator Action
Fire Protection Program
ML22104A17614 April 2022Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000272/2022402 and 05000311/2022402Cyber Security
ML22234A03622 August 2022Request for Information to Support Triennial Baseline Design - Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000272/2022011 and 05000311/2022011Squib
Power-Operated Valves
Weak link
ML22318A10614 November 2022Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000272/2023011 and 05000311/2023011Ultimate heat sink
Commercial Grade Dedication
Probabilistic Risk Assessment
Temporary Modification
Aging Management