Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML022400781 | 18 January 2002 | E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report | |
ML023370686 | 13 November 2002 | Request for License Amendment for TS Surveillance Requirements for CS Nozzles - Dated 4/19/02 | Foreign Material Exclusion |
ML030360357 | 17 January 2003 | Y020030018 - E-mail from Mike Mulligan Safety Concern at Braidwood & Byron - Submittance of Inaccurate Documents | |
ML030360362 | 18 January 2003 | Y020030017 - E-mail from Mike Mulligan Byron & Generic Safety Concern | |
ML030360366 | 20 January 2003 | Y020030016 - E-mail from Mike Mulligan Generic Safety Concern with MSSV x-750 Seat & Indications of Safety Culture Problem | Boric Acid |
ML031430489 | 23 April 2003 | Submittal Dated October 16, 2002 - License Amendment for Instrument | |
ML031700389 | 18 June 2003 | Byron/Braidwood, Relief Request - Repair for the CRDM Canopy Seal Weld | Boric Acid VT-2 |
ML031820441 | 6 March 2003 | Email Dated March 6, 2003, from Dr. Ed Siegel to A. Hiser, W. Bateman, and T. Chan, Fwd: Fyi: Questions? Comments? | Boric Acid Weld Overlay Coatings Earthquake |
ML032660344 | 22 September 2003 | FOIA/PA-2003-0444 - Exelon Generation Co., LLC, Transcript of Meeting at Riii Office on 9-18-2003 | |
ML032820247 | 2 October 2003 | Request for a License Amendment to Revise Psv Lift Settings - Byron/Braidwood Units 1 and 2 | |
ML032820506 | 7 October 2003 | Questions Regarding SX AOT Extension Request | Probabilistic Risk Assessment Large early release frequency |
ML033180436 | 9 November 2003 | G20030685/LTR-03-0729 - Bob Meyer Ltr. Fatigue Rule - 16 Hour Wording | Fatigue Rule |
ML033250377 | 19 March 2002 | E-mail from Qualls to Chyu, Byron/Braidwood Single Spurious Actuation | Safe Shutdown |
ML040440084 | 3 February 2004 | Units 1 and 2, E-mail, Request for Rev. to 3.4.15, RCS Leak Detection Instrumentation | |
ML040580612 | 3 February 2004 | Duplicate Document - See ML040440084 | |
ML050680255 | 2 March 2005 | G20050160 - Barry Quigley Ltr Re 2.206 - Byron Station/1C RCS Cold Leg Loop Stop Isolation Valve | |
ML051660527 | 18 March 2005 | E-mail from Chrzanowski to NRC, Documents 2, 7 and 8 (Attached) | |
ML051660529 | 18 March 2005 | E-mail from Chrzanowski to NRC, Byron Lsv Info 1 | Nondestructive Examination Code Reconciliation Liquid penetrant |
ML051660534 | 18 March 2005 | E-mail Re Byron Lsiv Drawing | |
ML051660541 | 18 March 2005 | E-mail Re Byron #3 | Hydrostatic Nondestructive Examination Liquid penetrant Dissimilar Metal Weld |
ML051660544 | 19 March 2005 | Fwd: 1C Lsiv Data | |
ML051670192 | 18 March 2005 | E-mail, Byron #2 | Boric Acid Nondestructive Examination VT-2 Liquid penetrant Through-Wall Leak |
ML051680082 | 5 June 2005 | G20050435/LTR-05-0318 - Mike Mulligan Email 2.206 - Exelon'S Nuclear Power Plants | |
ML052500241 | 12 August 2005 | Comments on Proposed Director'S Decision by Exelon Regarding 2.206 Petition Re Byron Station | |
ML052500244 | 14 August 2005 | Comments by Barry Qugley Re Proposed Director'S Decision on 2.206 Petition for Byron Station | |
ML052550405 | 8 September 2005 | Request to Exelon to Address One of Comments Made Regarding a Proposed Director'S Decision for Byron Station | |
ML052760217 | 28 September 2005 | E-mail from Joseph Bauer to George Dick, Dated 09/28/2005, Regarding Clarification of 2.202 Questions | Foreign Material Exclusion |
ML052840344 | 6 October 2005 | E-mail from David Chrzanowski to George Dick, Regarding PRT Issues | |
ML053320470 | 17 August 2004 | E-Mail from Kim to Prible, Ranking of Plans for Openness Survey | |
ML053400029 | 3 December 2005 | Comment (31) Submitted by Danny Todhunter on Proposed Rule PR-26 Regarding Fitness for Duty Programs | Fitness for Duty |
ML060790434 | 2 December 2005 | E-mail from R. Telson, NRR, to R. Telson, NRR, Braidwood Potential Off- Site Migration of Tritium Contamination | |
ML061450404 | 17 February 2006 | E-mail from Shane to Boland Braidwood Article | |
ML061460071 | 13 February 2005 | E-Mail from Boland to Mitchell, Tritium at Dresden and Byron | |
ML061460280 | 14 February 2006 | Email from Riemer to Ring Et Al Pn Byron/Dresden Ex 5 and Portions Outside the Scope of the Request and Therefore Not Provided | |
ML061940121 | 6 July 2006 | E-mail from R. Kuntz, NRC, to D. Chrzanowski, Exelon Byron Unit 2 SG Tube Inspection RAI | |
ML070080210 | 4 May 2006 | E-mail from Barrett to Bahadur Et Al, Staff Revised CRGR #408 (April 25) Package | Hot Short Safe Shutdown Fire Barrier Probabilistic Risk Assessment Significance Determination Process Thermoset Exemption Request Fire Protection Program Backfit |
ML070080225 | 9 May 2006 | E-mail from Gwynn to Cupidon, Staff Revised CRGR #408 (April 25) Package | Backfit |
ML072680164 | 26 August 2003 | E-mail from E. Marinos, NRR to C. Grimes, NRR and J. Calvo on Lost Balls | |
ML072680165 | 22 September 2003 | E-mail from S. Alexander, NRR to D. Thatcher, NRR, E. Marinos, NRR, G. Cwalina, NRR, I. Ahmed, NRR, J. Calvo, NRR, S. Arndt, RES and T. Quay, NRR on 2003-0003 Ci Concerns Compilation | |
ML072680166 | 25 September 2003 | E-mail from S. Alexander, NRR to E. Marinos, NRR and I. Ahmed, NRR on 2003-03 & 07 Cl Concerns Compilation | |
ML072680178 | 23 October 2003 | E-mail from G. Cwalina, NRR to J. Calvo, NRR and T. Quay, NRR on Letter with Questions to Westinghouse Concerning Challenges to the Crossflow Instrument Design | |
ML072710664 | 22 June 2006 | E-mail from M. King, NRR to V. Gaddy, Riv on Leading Edge Flow Measurement Ope Search Info | Fuel cladding Power change Coast down |
ML080250489 | 8 January 2003 | E-mail from P. Rebstock to M. Chawla Byrontp: Bases for Concern Regarding Byron Thermal Power Operating Point | |
ML080280180 | 20 August 2003 | Timeline on Byron Thermal Power Issue from P. Lougheed (Riii) to A. Stone (Riii), Et Al | |
ML080280186 | 27 August 2003 | Power/Amag Issue Update from P. Snyder (NRR) to A. Stone (Riii), Et Al | |
ML080280317 | 28 August 2003 | U1, Overpower? from A. Stone (Riii) to Branch Inspectors (Riii) | |
ML080280341 | 3 September 2003 | Overpower?/Westinghouse Letter NSAL 03-6 from P. Snyder (NRR) to A. Stone (Riii), Et Al | |
ML080280598 | 16 October 2003 | Fyi: New Westinghouse NSAL from Nirodh Shah (Riii) to R. Skokowski (Riii), P. Snyder (NRR) | |
ML080290164 | 28 January 2004 | Email from G. Dick (NRR) to R. Skokowski (Riii) Fwd: Conference Call with IEMA Amag Issues at Byron and Braidwood | |
ML080290218 | 10 February 2004 | Amag at Braidwood from S. Ray (Riii) to Skokowski, R. (Riii), Et Al |