Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20054F4723 May 1982Forwards Survey Plan for Unrestricted Areas of United Nuclear Corp Facility in Wood River Junction,Ri.Plan Incorporates Comments from State
ML20054H31813 May 1982Comments on Mar 1982 Draft Agreement Between NRC & State of Ri Re Decommissioning of Unc Recovery Sys.Substantive Requirements to Be Imposed Erroneous,Unjustified & Objectionable.Requests Notification Upon Formal Submittal
ML20054J09311 June 1982Forwards Comments on United Nuclear Corp Recovery Sys Detailed Soil Decontamination Plan, & Submitted in Util .Application for Termination of License Supported
ML20054J4457 June 1982Responds to Re Draft Agreement Between State of Ri & NRC Regarding Decommissioning of United Nuclear Corp Recovery Sys.Will Notify When Draft Document Received from State for Comment.W/O Encl
ML20054M53325 June 1982Forwards IE Insp Rept 70-0820/82-06 on 820511-14.No Noncompliance Noted
ML20054M81422 June 1982Forwards Attachment to United Nuclear Corp
ML20055C12527 July 1982Forwards IE Insp Rept 70-0820/82-07 on 820715-16 & Notice of Violation
ML20056H45619 July 1993Advises That Rept Entitled Groundwater Monitoring Plan:Unc Site,Charlestown,Ri, Satisfies Criteria for Monitoring Plan W/Two Exception.Provides Listed Comments on Deficiencies Re Plan
ML20058B37522 June 1982Forwards Draft Memorandum of Understanding Between NRC & State of Ri Re Decommissioning of Unc Recovery Sys Facility. Encl Draft Reflects Input of General Public,State Officials & Citizens Advisory Committee
ML20059J89528 October 1993Forwards Results of Nitrogen Analyses Performed by USGS on Samples,Recently Obtained from Wells Near Former Unc Facility in Wood River Junction,Ri.Notifies That Old Wells Riw 667 & Riw 670 Replaced by Wells Riw 789 & Riw 790
ML20062A56613 July 1982Forwards Comments on Revised State of Ri Draft Agreement, Submitted May 1982,re Decommissioning of United Nuclear Corp Recovery Sys.Apparent Goals of State of Ri Cannot Be Accommodated within Atomic Energy Act & NRC Regulations
ML20062J34225 October 1993Forwards Results of Radiological Analyses Performed on Water Samples,Including 3 Replicates Collected from Wells in Vicinity of Unc Scrap Recovery Facility,Wood River Junction, Ri,By USGS During Sept 1993
ML20125C2992 December 1992Forwards Map of Unc Wood River Junction,Ri Site,Showing Relation of Site Boundaries to Amtrak Line & Areas of Site Where Nuclear Matl Utilized or Stored,Per 921014 Request
ML20126C63823 May 1985Ltr to Licensees Informing That Safeguard Event Repts Required by 10CFR73.71,including Unaccounted for Shipments, Suspected Thefts,Unlawful Diversion & Radiological Sabotage Should Be Submitted to Tt Martin,Region I
ML20126H3288 January 1981Advises That Exemptions from Specific Requirements of 10CFR73.40(a) & 73.67(c) Are Granted,Provided Listed Physical Protection Requirements Are Met
ML20126J41617 February 1981Forwards IE Insp Rept 70-0820/80-26 on 801209,10,15-17 & 19. No Noncompliance Noted
ML20126J53517 December 1980Discusses Tasks II-b & II-c of NRC-02-80-076 & Provides Comments Re Specs for Addl Deep Well to Be Drilled by licensee.Goldberg-Zoino Hydrological Rept Was Received
ML20126J56911 March 1981Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Rept 70-0820/80-14
ML20126J5766 February 1981Responds to NRC Re Violations Noted in IE Insp Rept 70-0820/80-14.Disputes Violation.Presents Seven Reasons for Considering U Scrap to Have Been Unirradiated Matl
ML20127B20617 June 1985Forwards Safeguards Insp Rept 70-0820/85-02 on 850509-10.No Violation Noted
ML20129K06216 March 1981Notifies That License SNM-777 Amended to Delete Condition 12,re Emergency Plan Per 10CFR70
ML20132A36127 August 1985Forwards Selected Papers in Hydrologic Sciences,1985, Dealing W/Usgs Studies Performed at Unc Recovery Sys Site
ML20133E2849 December 1996Forwards 1996 Groundwater Monitoring Rept for Unc, Charleston,Ri. Workscope Listed
ML20133K38717 September 1985Forwards Geohydrologic Data for Low Level Radioactive Contamination Site,Wood River Junction,Ri & Two Articles Re Groundwater Contamination Problem at Wood River Junction Plant
ML20133Q39329 October 1985Forwards J Berger Re Isotopic U in Soils.Requests Specific Actions & Schedules for Completion of Soil Decontamination Effort.Appropriate Confirmatory Surveys Will Be Performed Upon Receipt of Info
ML20133Q40516 October 1985Forwards Results of Analysis of Isotopic U Content of Soil Samples from Restricted Area,Confirming That U-234 Major Contaiminant in Residues at Wood River Junction Site & U-234/U-235 Ratio on Order of 30 or Greater
ML20137W90615 April 1997Forwards Drafts of Policy Memo Re Submissions to Us NRC, Settlement of Us NRC NOV & Proposed Imposition of Civil Penalty & $99,000 Check.W/O Check
ML20137X45820 November 1985Forwards Abbreviated History of Recovery Sys Facility from 1964 to Present,In Response to Request
ML20138R00118 October 1985Expresses Appreciation for Update on Decommissioning Efforts at Wood River Junction.Inclusion in List of Relevant Informational Documents Re Decommissioning of Facility Requested
ML20138R00924 October 1985Advises That Update of Status of Decommissioning Efforts Will Be Provided Periodically
ML20141C86715 May 1974Requests Schedule for Developing & Submitting Environ Rept in Connection W/License Renewal Application. Guide for Preparation of Environ Repts for Fuel Fabricating Facilities Encl.Schedule Requested within 30 Days.W/O Encl
ML20141E52316 May 1972Requests Registration as Users of Model BB-250-2,GE Models BU-4 & BU-5,Kerr Mcgee Corp Model NPd-1-528 & United Nuclear Models UNC-2400 & UNC-2901
ML20141F26213 July 1977Notifies That NRC Published for Comment,Proposed Rule That Would Require Licensees Possessing Strategic Quantities of SNM to Develop & Implement Plans for Responding to Threats, Thefts & Sabotage
ML20141F88929 July 1977Notifies of NRC 770823-25 Meetings W/Fuel Cycle Licensees & Transportation Agents Near Richmond,Va to Discuss Proposed Rules 42FR25744 Re Contingency Planning & 42FR34310 Re Upgrading Safeguards in Fuel Cycle Facilities
ML20141M08323 December 1991Responds to 911219 Telcon Requesting Vol II of Oak Ridge Associated Univs Confirmatory Radiological Survey of Unc Site,Wood River Juction,Rhode Island & Map Showing Location of All Known Burials
ML20147A96921 September 1978Request Admin Amend to Lic SNM-777,clarifying Language in Health Physics Section to Assure Compliance During Planned Shutdown of Ventilation Equip.Forwards Check for $150
ML20147B6902 November 1978Requests 10 Day Extension for Resolution of 781002 Inventory Since Contractor Labs Mass Spectrometer Unit Failed
ML20147C3409 November 1978Forwards Info of 781013 from United Nuc Corp Re an Alternate Form of Constr of the Addl Lagoons to Be Used for Immediate Storage of Liquid Wastes.Requests Eval & Recommendations Re the 2 Lagoon Design Alternatives
ML20147D0398 December 1978NRC Has Contracted Mound Labs,Monsanto Res Corp,To Prepare a Handbook of Nuc Safeguards Measurement Methods.Requests Facil Cooperation W/Mound Inquiries Re Special Nuc Matl. W/O Encl Project Description