Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20058P377 | 31 July 1990 | Monthly Operating Rept for Jul 1990 for Maine Yankee Atomic Power Station | |
ML20058P381 | 30 June 1990 | Revised Monthly Operating Rept for June 1990 | |
ML20058P784 | 14 August 1990 | Part 21 Rept Re Misapplication of Fluorolube FS-5 Oil in Main Steam Line Pressure Gauges.All Four Indicators Replaced W/Spare Gauges Which Utilize High Temp Silicone Oil | |
ML20059B986 | 13 August 1990 | Partially Withheld Topical Rept Evaluation of Cen 387-P, Pressurizer Surge Line Flow Stratification Evaluation. Rept Found Inadequate to Justify Continued Operation for 40-yr Plant Life | |
ML20059C501 | 29 October 1993 | Special Rept:On 931019,meteorological Instrumentation Channel for Delta T Declared Inoperable.Caused by Ceased Aspirator Motor Located at Top of Tower.Motor Replaced | |
ML20059C647 | 20 December 1993 | Rev 8 to Maine Yankee Atomic Power Co Operational QA Program | |
ML20059D050 | 30 August 1990 | Safety Evaluation Supporting Amend 117 to License DPR-36 | |
ML20059E307 | 31 August 1990 | Safety Assessment of Yaec 1735, Reactor Pressure Vessel Evaluation Rept for Yankee Nuclear Power Station. Detailed Plan of Action W/Listed Elements Requested within 60 Days After Restart to Demonstrate Ability to Operate Longer | |
ML20059E800 | 31 August 1990 | Monthly Operating Rept for Aug 1990 for Yankee Atomic Power Station | |
ML20059G241 | 6 September 1990 | Safety Evaluation Supporting Amend 135 to License DPR-3 | |
ML20059H590 | 12 September 1990 | Safety Evaluation Re Facility Response to Station Blackout Rule.Issue of Conformance to Station Blackout Rule Will Remain Open at Facility Until Identified Nonconformances Resolved | |
ML20059K748 | 31 August 1990 | Monthly Operating Rept for Aug 1990 for Maine Yankee Atomic Power Station | |
ML20059K849 | 15 December 1993 | Clarifications to Pages 2,41,43 & 44 of 44 in Section I, Organization of YOQAP-I-A,Rev 24, Operational QA Program | |
ML20059K999 | 20 September 1990 | SER Accepting Methodology Re Statistical Combination of Uncertainties for RPS Setpoints | |
ML20059N458 | 30 September 1990 | Monthly Operating Rept for Sept 1990 for Maine Yankee Atomic Power Station | |
ML20059N459 | 30 June 1990 | Revised Monthly Operating Rept for Jun 1990 for Maine Yankee Atomic Power Station | |
ML20059N462 | 31 July 1990 | Revised Monthly Operating Rept for July 1990 for Maine Yankee Atomic Power Station | |
ML20059N464 | 31 August 1990 | Revised Monthly Operating Rept for Aug 1990 for Maine Yankee Atomic Power Station | |
ML20062A100 | 14 July 1982 | Safety Evaluation Supporting Amend 61 to License DPR-36 | |
ML20062B675 | 30 September 1990 | Monthly Operating Rept for Yankee Atomic Power Station for Sept 1990 | |
ML20062D288 | 13 September 1990 | Rev 0 to Cycle 12 Core Operating Limits Rept | |
ML20062E680 | 31 July 1982 | Valve Inlet Fluid Conditions for Pressurizer Safety & Relief Valves,Me Yankee Power Station | |
ML20062E686 | 31 October 1990 | Monthly Operating Rept for Maine Yankee Atomic Power Station for Oct 1990 | |
ML20062E833 | 31 October 1990 | Monthly Operating Rept for Oct 1990 for Yankee Atomic Power Station | |
ML20062F759 | 9 July 1982 | Monthly Operating Rept for June 1982 | |
ML20062G053 | 9 July 1982 | Monthly Operating Rept for June 1982 | |
ML20062H198 | 30 November 1990 | Plant Specific Fast Neutron Exposure Evaluations for First 20 Operating Fuel Cycles of Yankee Rowe Reactor | |
ML20062J095 | 11 September 1980 | Monthly Operating Rept for Aug 1980 | |
ML20125C716 | 7 December 1992 | Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl | Stroke time Anchor Darling |
ML20125E390 | 30 November 1992 | Monthly Operating Rept for Nov 1992 for Myaps | |
ML20126B249 | 31 December 1979 | Safety Evaluation Re Steam Generator Water Hammer at Facility.Water Hammer Unlikely | |
ML20126B434 | 30 January 1980 | RO 80-001/01T:during Review of Steam Line Break Analysis, Incorrect Assumption Utilized in Zero or Low Power Steam Line Break Analysis Discovered.Cause Unstated.Necessary Mods to Be Implemented Prior to Startup | |
ML20126C014 | 1 February 1980 | RO 50-29/80-8:during Surveillance Testing of Complete Circuit,Timers Failed to Operate.Caused by Timer Polarity Sensitivity.Installation Documentation Checked.Entire Circuit to Be Retested | |
ML20126E004 | 31 July 1962 | Operation Rept 19 for Jul 1962 | |
ML20126E020 | 30 June 1962 | Operation Rept 18 for June 1962 | Hydrostatic |
ML20126G685 | 31 October 1977 | Skiron:Computer Code for Determining Atmospheric Dispersion Conditions for DBA Evaluations. One-hour Exlusion Area Boundary X/Q at 0.5% Exceedance Probability Developed from Site Meteorological Data for Jan-Dec 1977 Encl | |
ML20126H037 | 26 March 1981 | Safety Evaluation Re Adequacy of Station Electric Distribution Sys Voltage | Reserve Station Service Transformer |
ML20126H621 | 29 December 1992 | Safety Evaluation Supporting Amend 135 to License DPR-36 | |
ML20126H637 | 31 March 1985 | Monthly Operating Rept for Mar 1985 | |
ML20126K524 | 5 May 1981 | Draft Safety Evaluation Supporting Amend to License DPR-36, to Revise Tech Spec 3.19 to Allow Use of Loop 2 Isolation Breakers Until 810509 Shutdown | |
ML20126L462 | 1 June 1981 | Safety Evaluation for Environ Qualification of safety- Related Electrical Equipment at Facility | Boric Acid |
ML20126L465 | 14 November 1980 | Environ Qualification of Safety-Related Electrical Equipment - IE Bulletin 79-01B, Technical Evaluation Rept | Safe Shutdown Boric Acid |
ML20126L781 | 3 June 1981 | Ro:On 810603,at Completion of Fuel Handling Activities & W/ Greater than 23 Ft of Water in Reactor Cavity,Svc Water Cooling to Secondary Component Coolers Interrupted for Approx 30 Minutes.No Significant Increase in Temp | |
ML20126M838 | 8 June 1981 | Safety Evaluation Supporting Amend 68 to License DPR-3 | |
ML20127A463 | 14 April 1987 | Recommends Commission Concurrence Re Process of Issuing Exemptions Deemed Warranted for Issues Described in Integrated Plant Safety Assessment Repts for SEP Plants | Tornado Missile |
ML20127B083 | 30 April 1985 | Cycle 9 Core Performance Analysis | Shutdown Margin Anticipated operational occurrence |
ML20127D506 | 11 January 1993 | Safety Evaluation Supporting Amend 136 to License DPR-36 | |
ML20127E482 | 31 December 1992 | Monthly Operating Rept for Dec 1992 for Myaps | |
ML20127P256 | 31 January 1993 | Rev 0 to Licensing Rept for Maine Yankee Atomic Power Company High Density Spent Fuel Pool Reracking Project | |
ML20127P586 | 23 November 1992 | Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl |