Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20058P37731 July 1990Monthly Operating Rept for Jul 1990 for Maine Yankee Atomic Power Station
ML20058P38130 June 1990Revised Monthly Operating Rept for June 1990
ML20058P78414 August 1990Part 21 Rept Re Misapplication of Fluorolube FS-5 Oil in Main Steam Line Pressure Gauges.All Four Indicators Replaced W/Spare Gauges Which Utilize High Temp Silicone Oil
ML20059B98613 August 1990Partially Withheld Topical Rept Evaluation of Cen 387-P, Pressurizer Surge Line Flow Stratification Evaluation. Rept Found Inadequate to Justify Continued Operation for 40-yr Plant Life
ML20059C50129 October 1993Special Rept:On 931019,meteorological Instrumentation Channel for Delta T Declared Inoperable.Caused by Ceased Aspirator Motor Located at Top of Tower.Motor Replaced
ML20059C64720 December 1993Rev 8 to Maine Yankee Atomic Power Co Operational QA Program
ML20059D05030 August 1990Safety Evaluation Supporting Amend 117 to License DPR-36
ML20059E30731 August 1990Safety Assessment of Yaec 1735, Reactor Pressure Vessel Evaluation Rept for Yankee Nuclear Power Station. Detailed Plan of Action W/Listed Elements Requested within 60 Days After Restart to Demonstrate Ability to Operate Longer
ML20059E80031 August 1990Monthly Operating Rept for Aug 1990 for Yankee Atomic Power Station
ML20059G2416 September 1990Safety Evaluation Supporting Amend 135 to License DPR-3
ML20059H59012 September 1990Safety Evaluation Re Facility Response to Station Blackout Rule.Issue of Conformance to Station Blackout Rule Will Remain Open at Facility Until Identified Nonconformances Resolved
ML20059K74831 August 1990Monthly Operating Rept for Aug 1990 for Maine Yankee Atomic Power Station
ML20059K84915 December 1993Clarifications to Pages 2,41,43 & 44 of 44 in Section I, Organization of YOQAP-I-A,Rev 24, Operational QA Program
ML20059K99920 September 1990SER Accepting Methodology Re Statistical Combination of Uncertainties for RPS Setpoints
ML20059N45830 September 1990Monthly Operating Rept for Sept 1990 for Maine Yankee Atomic Power Station
ML20059N45930 June 1990Revised Monthly Operating Rept for Jun 1990 for Maine Yankee Atomic Power Station
ML20059N46231 July 1990Revised Monthly Operating Rept for July 1990 for Maine Yankee Atomic Power Station
ML20059N46431 August 1990Revised Monthly Operating Rept for Aug 1990 for Maine Yankee Atomic Power Station
ML20062A10014 July 1982Safety Evaluation Supporting Amend 61 to License DPR-36
ML20062B67530 September 1990Monthly Operating Rept for Yankee Atomic Power Station for Sept 1990
ML20062D28813 September 1990Rev 0 to Cycle 12 Core Operating Limits Rept
ML20062E68031 July 1982Valve Inlet Fluid Conditions for Pressurizer Safety & Relief Valves,Me Yankee Power Station
ML20062E68631 October 1990Monthly Operating Rept for Maine Yankee Atomic Power Station for Oct 1990
ML20062E83331 October 1990Monthly Operating Rept for Oct 1990 for Yankee Atomic Power Station
ML20062F7599 July 1982Monthly Operating Rept for June 1982
ML20062G0539 July 1982Monthly Operating Rept for June 1982
ML20062H19830 November 1990Plant Specific Fast Neutron Exposure Evaluations for First 20 Operating Fuel Cycles of Yankee Rowe Reactor
ML20062J09511 September 1980Monthly Operating Rept for Aug 1980
ML20125C7167 December 1992Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils EnclStroke time
Anchor Darling
ML20125E39030 November 1992Monthly Operating Rept for Nov 1992 for Myaps
ML20126B24931 December 1979Safety Evaluation Re Steam Generator Water Hammer at Facility.Water Hammer Unlikely
ML20126B43430 January 1980RO 80-001/01T:during Review of Steam Line Break Analysis, Incorrect Assumption Utilized in Zero or Low Power Steam Line Break Analysis Discovered.Cause Unstated.Necessary Mods to Be Implemented Prior to Startup
ML20126C0141 February 1980RO 50-29/80-8:during Surveillance Testing of Complete Circuit,Timers Failed to Operate.Caused by Timer Polarity Sensitivity.Installation Documentation Checked.Entire Circuit to Be Retested
ML20126E00431 July 1962Operation Rept 19 for Jul 1962
ML20126E02030 June 1962Operation Rept 18 for June 1962Hydrostatic
ML20126G68531 October 1977Skiron:Computer Code for Determining Atmospheric Dispersion Conditions for DBA Evaluations. One-hour Exlusion Area Boundary X/Q at 0.5% Exceedance Probability Developed from Site Meteorological Data for Jan-Dec 1977 Encl
ML20126H03726 March 1981Safety Evaluation Re Adequacy of Station Electric Distribution Sys VoltageReserve Station Service Transformer
ML20126H62129 December 1992Safety Evaluation Supporting Amend 135 to License DPR-36
ML20126H63731 March 1985Monthly Operating Rept for Mar 1985
ML20126K5245 May 1981Draft Safety Evaluation Supporting Amend to License DPR-36, to Revise Tech Spec 3.19 to Allow Use of Loop 2 Isolation Breakers Until 810509 Shutdown
ML20126L4621 June 1981Safety Evaluation for Environ Qualification of safety- Related Electrical Equipment at FacilityBoric Acid
ML20126L46514 November 1980Environ Qualification of Safety-Related Electrical Equipment - IE Bulletin 79-01B, Technical Evaluation ReptSafe Shutdown
Boric Acid
ML20126L7813 June 1981Ro:On 810603,at Completion of Fuel Handling Activities & W/ Greater than 23 Ft of Water in Reactor Cavity,Svc Water Cooling to Secondary Component Coolers Interrupted for Approx 30 Minutes.No Significant Increase in Temp
ML20126M8388 June 1981Safety Evaluation Supporting Amend 68 to License DPR-3
ML20127A46314 April 1987Recommends Commission Concurrence Re Process of Issuing Exemptions Deemed Warranted for Issues Described in Integrated Plant Safety Assessment Repts for SEP PlantsTornado Missile
ML20127B08330 April 1985Cycle 9 Core Performance AnalysisShutdown Margin
Anticipated operational occurrence
ML20127D50611 January 1993Safety Evaluation Supporting Amend 136 to License DPR-36
ML20127E48231 December 1992Monthly Operating Rept for Dec 1992 for Myaps
ML20127P25631 January 1993Rev 0 to Licensing Rept for Maine Yankee Atomic Power Company High Density Spent Fuel Pool Reracking Project
ML20127P58623 November 1992Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl