OPERATING DATA REPORT 50-29 DOCKET NO.
DATE B20709 COh!PLETED BY A.E.
Doyle TELEPHONE f 61 ~/1 97?-8100 x2392 OPERATING STATUS Notes Yankee Rowe
- 1. Unit Name:
June, 1992 power level restricted by
- 2. Reporting Period:
600 installation of batfle
- 3. Licensed Thermal Power (MWt):
185 plates in turbine.
- 4. Nameplate Rating (Gross MWe):
175
- 5. Design Electrical Rating (Net MWe):
180
- 6. Maximum Dependable Capseity (Gross MWe):
175
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons:
150 Mwe
- 9. Power Lesel To Which Restricted.If Any (Net MWe):
See notes
- 10. Reasons For Restrictions.If Any:
This Month Yr..to.Date Cumu!stive 720.00 4.141.00
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 4.330.60 151.261.75 707.60 0.00 0.00 0.00
- 13. Resetor Reserve Shutdown Hours 701.90 4.194 o0 146.90s 40
- 14. Hours Generator On Line 0.00 0.00 0,00
- 15. Unit Reserve Shutdown Hours 415,244.00 2,564,894.00 79,069,827.52
- 16. Gross Thermal Energy Generated (MWH) 106.347.80 663.062.20 24.002.765.90
- 17. Cross Electries! Energy Generated (MWH) 98.735 10 616 1 A1 11 99 aso.994.99
- 18. Net Electrical Energy Generated (MWH) 97 ao no En 77.o
- 19. Unit Service Factor 97.49 99 SR 77.49
- 20. Unit Availability Factor 78.36 81.07 69.71
- 21. Unit Capseity Factor (Using MDC Net) 78.36 81.07 69.71
- 22. Unit Capacity Factor (Using DER Net) 2.51
.42 5.07
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eschi:
gnp n knv 11 sony Core XV-XVI Refuelino scheduloa nhntanen nn scheduled for 13 weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commereist Operation):
Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY CO3DIERCIAL OPERATION t /77) 9 8208120234 820709 PDR ADOCK 05000029 R
,f AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-29 UNIT Yankee Rove 20709 8
DATE COMPLETED BY A.E. Doyle
(- 6 117) 872-8100 TELEPHONE x2390 MONTH JUPE, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
I 142.9 17 142.*8 2
143.1 33 142.5 3
143.0 39 142.4 4
143.2 20 142.3 5
143.0
~
21 142.2 6
143.3 w
22 142.2 7
143 1 23
'141 '9 3
143.3 24 142.0 9
143.4 25 141 8 10 142.8 26-141.0 11 142.8 27 14127 a
12 143.0 28 141.6 13 136.3 29 37 14 142.9 30 89 7 15 142 9 31 16 142.9 i
i j
/
INSTRUCTIONS L,
On this format, list the average daily unit power levelin MWe Net for each diy in the reporting month. Compute to
~
- g the rmrest whole rnegawatt.
e t
1 (9/77) p
UNITSilOTDOWNS ANDPOWER REDUCTIONS DOCKETNO. 50-29 UNIT NAM E Yankee Rowe DATE 9?O709 REPORT MONTII 3"* rr _ lop?
COMPl.ETED fly
_A.E.
Doyle TELEPIIONE (617)872-8100 X2390 "i
-e*
c
.3m=
.2 e g
a cX Licensee 5 *,,
g, Cause & Corrective No.
Date g
g jg5 Event u?
[Q F
c5 E 5
j;5g Report
- LN 0 As. lion la U
Prevent Itecurrence 6
3 820629 F
18.1 11 3
N/A N/A N/A N/A Shutdown dt e to turbine t rip ca' sed by looa of 2 -126 hi gh line during a thur derstorm.
t 2
3 F: Finsed Iteason:
4 S: Sdicdoled Mettiod:
A II<pupment Failure (Explain)
Estiibit G Instructiims 1-Manud 11 Maintenance of Test for Pacparation of Data C-liefueling 7 Manual Scrain.
Entry Slicets for Licensee D Itegulasury Itcsirict;un
- 3. Automatic Serain.
Event Itepius (i.littl file iNUlti:G.
li-Opeutor Tsaining & License Examination 4-Ottier (Explain) 0168)
F-Ailaninisiviive G Opesational I esor (limplain) 5
('s/17)
II Ottie, (!'aplain)
Emintsil 1 SJune Sonfic m
a t
,s i
DOCKET NO.
50-29 UNIT Yankee Rowe DATE e20709 COMPLETED BY A.E. Doyle TELEPHONE (617) 872-8100 X2390 REPORT MONTH JUNE, 1982 SU'-NARY OF OPERATING EXPERIENCES 1
6/13/82: Power reduced at 0001 for throttle valve and non-return valve testing. Testing completed satisfactorily at
- 0450, 6/29/82: Plant trip at 0629 from 100% power due to loss of Z-126 high line during a thunderstorm.
6/30/82: Plant back on line at 0033. Power increased to the j
reduced power limit'of 467 KWT.
Reduced power held for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.