Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20087J953 | 15 August 1995 | Proposed Tech Specs,Consisting of Change Request 95-06, Moving RCS Flow Limits from TS to COLR & Providing Guidelines for Removal of cycle-specific Parameter Limits from TS | Shutdown Margin |
ML20087K175 | 15 August 1995 | Proposed Tech Specs,Moving Shutdown Margin Limits from TS & Providing Guidelines for Removal of cycle-specific Parameter Limits from TS | Boric Acid Shutdown Margin |
ML20087L458 | 15 August 1995 | Proposed Tech Specs Removing Several Cycle Specific Parameter Limits & Adding Limits to COLR | Shutdown Margin Fuel cladding |
ML20091D666 | 6 April 1992 | Proposed TS Rev to Table 3.3-1, Reactor Trip Sys Instrumentation Re Boron Dilution Mitigation Sys | |
ML20092B808 | 4 February 1992 | Proposed TS Section 3/4 Re LCOs & Surveillance Requirements During Operational Modes & TS Table 1.4.1, Seismic Monitoring Instrumentation | Safe Shutdown Hydrostatic Nondestructive Examination Grace period |
ML20094G784 | 28 February 1992 | Proposed Tech Specs 3.3.1,Table 3.3-1,Functional Unit 6.b, Boron Dilution Flux Doubling | Boric Acid Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Backfit |
ML20094N620 | 21 November 1995 | Proposed Tech Specs,Allowing Containment Pal Doors to Remain Open During Movement of Irradiated Fuel & During Core Alterations for Plant | |
ML20094N901 | 21 November 1995 | Proposed Tech Specs,Incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints, Resulting from Reload Analyses for CPSES Unit 2,Cycle 3 | |
ML20095E831 | 15 December 1995 | Proposed TS Bases 2.2.1,deleting Unnecessary Details Re Time Delay Requirements for Undervoltage & Underfrequency RCP Trip Setpoints | |
ML20096B328 | 5 January 1996 | Proposed TS Re Wide Range RCS Temp.-Th Remote Shutdown Indication | |
ML20097E976 | 5 June 1992 | Proposed TS Section 3/4.7.7 Re Svc Water Sys | Ultimate heat sink |
ML20098E079 | 26 May 1992 | Proposed Tech Specs Re Reactor Trip Sys Instrumentation, Removing Ref to Unit 2 | |
ML20100J079 | 22 February 1996 | Proposed Tech Specs 3/4.9.4,revising Units 1 & 2 TS Bases Allowing Both Doors of Pal to Remain Open as Long One Pal Door Is Capable of Closing | |
ML20101C568 | 12 March 1996 | Proposed Tech Specs 3/4.6.1 & 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J,Option B | |
ML20101H384 | 26 June 1992 | Proposed marked-up TS Table 2.2-1 Re Reactor Trip Sys Instrumentation Trip Setpoints & Section 3/4.5.1 Re Cold Leg Injection | |
ML20102A476 | 20 July 1992 | Proposed Tech Specs Including Corrections to Validated Unit 2 Values,Corrections Reflecting Previously Transmitted Changes & Revised Testing Frequency for Turbine Overspeed Protection | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Process Control Program Fuel cladding Offsite Circuit |
ML20104B393 | 10 September 1992 | Proposed TS Table 2.2-1 Re Reactor Trip Sys Instrumentation Trip Setpoints for Reactor Coolant Pump Undervoltage & Underfrequency | |
ML20106G823 | 13 March 1996 | Proposed Tech Specs,Supplementing LAR-95-007,revising TS LCO 3.9.4 to Allow Both Doors of Personnel Airlock to Remain Open as Long as One Pal Door Capable of Being Closed | |
ML20113B589 | 21 June 1996 | Proposed Tech Specs,Removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Info to Clarify Expanded Bases Specific to CPSES | |
ML20114B116 | 21 August 1992 | Proof & Review Combined TS 3.6.1.2 Re Containment Leakage Rates & 3/4.6.1.2 Re Limitations on Containment Leakage Rates | |
ML20114D681 | 3 September 1992 | Proposed Ts,Deleting WCAP-8200 Re Wflash Computer Program for Simulation of Transients in multi-loop PWR from TS Page 6-25.Sections of Unit 2 FSAR Encl | Shutdown Margin Loop seal Fuel cladding |
ML20115C946 | 9 July 1996 | Proposed Tech Specs Re Steam Line pressure-low Allowable Value | |
ML20115D219 | 16 October 1992 | Proposed TS 5.3.1 Re Initial Core Loading Max Enrichment of U-235 | |
ML20115E804 | 10 July 1996 | Proposed TS 3/4.7.11,revising Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room | |
ML20115E811 | 19 October 1992 | Proposed Tech Specs Re Increase in Refueling Water Storage Tank & Accumulator Boron Concentration | Boric Acid Shutdown Margin Fuel cladding |
ML20116C834 | 29 October 1992 | Proposed Tech Specs,Reflecting Revised Heatup & Cooldown Curves & Revised Limits for PORV Setpoints | Hydrostatic |
ML20116E324 | 4 November 1992 | Final Draft Combined Proposed Tech Specs | Boric Acid Ultimate heat sink Hydrostatic Fuel cladding Power change |
ML20116E865 | 31 July 1996 | Proposed Tech Specs Modifying Inverter/Battery Chargers by Incorporating Listed Changes Into CPSES Units 1 & 2 TSs | |
ML20116F047 | 2 August 1996 | Proposed Tech Specs Re Increase in Allowed Outage Time for Charging Pump from 72 H to 7 Days | Shutdown Margin |
ML20116F371 | 31 July 1996 | Proposed Tech Specs 6.9.1.6b Including TR, SBLOCA Analysis Methodology, in List of NRC-approved Methodologies & Rev of Unit 1 Rx Trip Setpoints | Shutdown Margin High Radiation Area |
ML20126E281 | 16 December 1992 | Proposed TS Bases B.3/4.1.2,B.3/4.5.4 & B.3/4.7.1.3 Re Boration Sys,Rwst & Condensate Storage Tank | Boric Acid |
ML20128C525 | 17 May 1985 | Proposed Tech Spec Changes,Replacing Automatic MSIV Bypass Valve Actuators W/Manual Operators | |
ML20134B980 | 19 September 1996 | Proposed Tech Specs Re Inverter/Battery Charger Mod | |
ML20141G194 | 16 May 1997 | Proposed Tech Specs,Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint | |
ML20153E266 | 24 September 1998 | Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls | |
ML20154C910 | 2 October 1998 | Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria | Operating Basis Earthquake Earthquake |
ML20154R786 | 21 October 1998 | Proposed Tech Specs Section 3.7, Plant Systems | |
ML20154S290 | 14 October 1998 | Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively | Shutdown Margin High Radiation Area Pressure and Temperature Limits Report Process Control Program |
ML20195B646 | 27 May 1999 | Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance | |
ML20195B677 | 24 May 1999 | Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML20195E540 | 4 June 1999 | Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 | |
ML20195F175 | 13 November 1998 | Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS | Boric Acid Shutdown Margin |
ML20195F529 | 11 November 1998 | Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 | |
ML20196B881 | 30 October 1998 | Proposed Tech Specs Section 3.3 Re Instrumentation | Post Accident Monitoring Offsite Circuit |
ML20196C536 | 20 November 1998 | Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 | Shutdown Margin High Radiation Area Post Accident Monitoring Hydrostatic |
ML20197K049 | 11 December 1998 | Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS | |
ML20198J254 | 18 December 1998 | Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS | Shutdown Margin High Radiation Area Process Control Program Power change |
ML20198J317 | 21 December 1998 | Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt | Shutdown Margin Hydrostatic Design basis earthquake Process Control Program Earthquake |
ML20198J521 | 17 December 1998 | Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application | |
ML20202B164 | 5 February 1998 | Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves |