Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML02276030530 September 2002Degradation of the Davis-Besse Nuclear Power Station Reactor Pressure Vessel Head Lessons-Learned Report - Signature Page
ML02304026819 September 2002Part 4 of 4 - Westinghouse Technology Manual, Course Outline for R-104P and Course ManualSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Power-Operated Valves
ML02318047311 November 200210 CFR 50.59 Summary Report of Facility Changes, Tests & Experiments Covering Period 05/18/00 Through 05/18/02Safe Shutdown
Boric Acid
Ultimate heat sink
Offsite Dose Calculation Manual
Post Accident Monitoring
Internal Flooding
Temporary Modification
Finite Element Analysis
Condition Adverse to Quality
Foreign Material Exclusion
Frazil ice
Control of Heavy Loads
Flow Induced Vibration
Power Uprate
ML02326005818 November 2002Regulatory Commitment Change Summary Report (May 18, 2000 - May 18, 2002)High Radiation Area
Nondestructive Examination
ML0302403949 January 2003Firstenergy Nuclear Operating Co. (Fenoc)/ Evaluations Performed at Davis-Besse to Address USNRC Inspection Manual Chapter 0350, Item No. 1, Adequacy of Root Cause Determination/ Letter, Table of Contents - Attachment BBoric Acid
Past operability
Condition Adverse to Quality
Operability Determination
License Renewal
Pressure Boundary Leakage
Unidentified leakage
Unidentified leak
Power Uprate
ML0302404089 January 2003Firstenergy Nuclear Operating Co. (Fenoc)/ Evaluations Performed at Davis-Besse to Address USNRC Inspection Manual Chapter 0350, Item No. 1, Adequacy of Root Cause Determination/ Letter, Enclosure 4, Table of Contents - Attachment 1Boric Acid
Slow transfer
Nondestructive Examination
Condition Adverse to Quality
ML0302404209 January 2003Firstenergy Nuclear Operating Co. (Fenoc)/ Evaluations Performed at Davis-Besse to Address USNRC Inspection Manual Chapter 0350, Item No. 1, Adequacy of Root Cause Determination/ Letter, Attachment 1, Page 158 - 364
ML0302404249 January 2003Firstenergy Nuclear Operating Co. (Fenoc)/ Evaluations Performed at Davis-Besse to Address USNRC Inspection Manual Chapter 0350, Item No. 1, Adequacy of Root Cause Determination/ Letter, Attachment 1, Page 365 - 574
ML0302404409 January 2003Firstenergy Nuclear Operating Co. (Fenoc)/ Evaluations Performed at Davis-Besse to Address USNRC Inspection Manual Chapter 0350, Item No. 1, Adequacy of Root Cause Determination/ Letter, Attachment 2Safe Shutdown
Boric Acid
Packing leak
Ultimate heat sink
Stroke time
Past operability
Temporary Modification
VT-2
Condition Adverse to Quality
Significance Determination Process
Maintenance Rule Program
Pressure Boundary Leakage
Fire Protection Program
ML0302404829 January 2003Firstenergy Nuclear Operating Co. (Fenoc)/ Evaluations Performed at Davis-Besse to Address USNRC Inspection Manual Chapter 0350, Item No. 1, Adequacy of Root Cause Determination/ Letter
ML03028044830 September 2002Reactor Vessel Head Degradation Lessons-Learned Task Force Report Executive Summary - Handout Provided at Public Meeting on November 20, 2002Boric Acid
Generic Issues Program
ML03041038130 January 2003Questions from the Public Meeting Between NRC and Firstenergy Nuclear Operating Co. Davis-Besse Safety Culture and Safety Concious Work Environment
ML03080011818 March 2003Semiannual Fitness-For-Duty Report, July - December 2002Fitness for Duty
ML03091062431 July 2002Preliminary FENOC Submission Titled Responses to NRC Staff Comments and Questions on Davis-Besse Safety Significance Assessment (SIA-W-DB-O1Q301) Submitted April 8, 2002Finite Element Analysis
ML0310102406 April 2003Transmittal of Revision 6 of Davis-Besse Return to Service Plan, Revision 5 of Davis-Besse Restart Action Plan, Revison 5 of Davis-Besse Program Compliance Plan, & Revison 3 of Nuclear Operating Business Practice, Restart Readiness Review ESafe Shutdown
Boric Acid
Non-Destructive Examination
Commercial Grade Dedication
Coatings
Temporary Modification
Significance Determination Process
Foreign Material Exclusion
Maintenance Rule Program
Through Wall Leak
Fire Protection Program
ML03104015013 July 2002Handwritten Comment on Preliminary FENOC Submission Titled Responses to NRC Staff Comments & Questions on Davis-Besse Safety Significance Assessment (SIA-W-DB-01Q-301)Finite Element Analysis
ML03104019618 April 2002Letter to Jim Dyer from Howard Bergendahl Re Confirmatory Action Letter Response - Root Cause Analysis Report with Handwritten NotesBoric Acid
Time of Discovery
Packing leak
Non-Destructive Examination
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Finite Element Analysis
Condition Adverse to Quality
Fuel cladding
Pressure Boundary Leakage
Through-Wall Leak
Through Wall Leak
ML03104023531 August 2002ORNL/NRC/LTR-, Stochastic Failure Model for Davis-Besse Rvp Head.Boric Acid
Hydrostatic
Pressure Boundary Leakage
ML03104025130 September 2002ORNL/NRC/LTR-, Stochastic Failure Model for Davis-Besse Rvp Head.Boric Acid
Hydrostatic
Pressure Boundary Leakage
ML0311100978 April 2003Nuclear & Environmental Operations, Davis Besse Reactor Vessel Head Examination
ML03111049230 April 2002Failure Criterion Development and Parametric Finite Element Analyses to Assess Margins for the Davis Besse RPV Head CorrosionBoric Acid
Finite Element Analysis
ML03121050123 April 2003Submittal of Report Titled, Safety Culture Evaluation of Davis Besse Nuclear Power Station, Dated April 14, 2003Foreign Material Exclusion
ML03153016929 May 2003Engineering Change Package - Reference Documents Table of Content - ECR No. 02-0805-00, Rev. 01
ML03153017429 May 2003Engineering Change Screen
ML0315301805 August 2002Restart Test Plan
ML03153018328 November 2002Engineering Change Request ECR NO-02-805-00
ML03153018528 November 2002Installation and Test Requirements
ML03153018628 November 2002Regulatory Applicability Determination No. 02-02026, Rev 0
ML0315304025 May 2002NRC Assessment of Margin Available at Davis Besse
ML03156065430 April 2002Failure Criterion Development and Parametric Finite Element Analyses to Assess Margins for the Davis-Besse RPV Head Corrosion with Handwritten NotesFinite Element Analysis
ML03231004513 August 2003Transmittal of Final Report on Examination of the Reactor Vessel Head Degradation, and Safety Significance Assessment UpdateNondestructive Examination
Finite Element Analysis
ML03231005830 June 2003Final Report: Examination of the Reactor Vessel (Rv) Head Degradation at Davis-Besse. Table of Contents and Pages 1 - 98Boric Acid
Nondestructive Examination
ML03231006030 June 2003Final Report: Examination of the Reactor Vessel (Rv) Head Degradation at Davis-Besse. Pages 99 - 226Boric Acid
ML03251033917 September 2003Incore Monitoring Nozzle InspectionsBoric Acid
Pressure Boundary Leakage
ML03260098215 July 2002Stochastic Failure Model for the Davis Besse RPV Head
ML03260098314 August 2002Stochastic Failure Model for Davis Besse RPV HeadBoric Acid
Hydrostatic
Pressure Boundary Leakage
ML03314040220 November 2003Letter, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident ConditionsCoast down
ML03335032730 November 2003Framatome Anp, Inc. Document 31-5029337-02, Examination of Reactor Vessel (Rv) Head Degradation at Davis Besse, Cover Page Through Figure 2.7.9Boric Acid
Nondestructive Examination
ML03335033530 November 2003Framatome Anp, Inc. Document 31-5029337-02, Examination of Reactor Vessel (Rv) Head Degradation at Davis Besse, Figures 3.1.1 - 3.2.3
ML03335034030 November 2003Framatome Anp, Inc. Document 31-5029337-02, Examination of Reactor Vessel (Rv) Head Degradation at Davis Besse, Figures 3.3.1 - 3.5.5
ML03335034330 November 2003Framatome Anp, Inc. Document 31-5029337-02, Examination of Reactor Vessel (Rv) Head Degradation at Davis Besse, Figures 3.5.6 - 5.3
ML03335034930 November 2003Framatome Anp, Inc. Document 31-5029337-02, Examination of Reactor Vessel (Rv) Head Degradation at Davis Besse, Figures 5.3 - 6.1.1.1
ML03335035330 November 2003Framatome Anp, Inc. Document 31-5029337-02, Examination of Reactor Vessel (Rv) Head Degradation at Davis Besse, Figures 6.1.1.2 - 7.2.4.1Boric Acid
ML03335035830 November 2003Framatome Anp, Inc. Document 31-5029337-02, Examination of Reactor Vessel (Rv) Head Degradation at Davis Besse, Figures 7.2.4.2 - 8.3.3.5Boric Acid
ML03336025123 November 2003Integrated Report to Support Restart of the Davis-Besse Nuclear Power Station and Request for Restart ApprovalSafe Shutdown
Boric Acid
Packing leak
Non-Destructive Examination
Tornado Missile
Coatings
Temporary Modification
Condition Adverse to Quality
Tornado Missile Protection
Foreign Material Exclusion
Large early release frequency
Code Reconciliation
Exemption Request
Pressure Boundary Leakage
Through-Wall Leak
Grace period
ML03365029823 September 2002Confirmatory Action Letter Response - Revision 1 to Root Cause Analysis Report Regarding Reactor Pressure Vessel Head Degradation - Serial Number 1-1289
ML04002003219 December 2003Submittal of Revisions 7, 8, 9, and 10 of the Nuclear Operating Business Practice, Restart Readiness Review Extended Plant Outage (DBBP-VP-0002)Safe Shutdown
Boric Acid
Commercial Grade Dedication
Temporary Modification
Foreign Material Exclusion
Maintenance Rule Program
Fire Protection Program
ML04027018111 February 2004Memo, Evaluation of Davis-Besse Modifications to the High Pressure Injection Pump and Associated Mock-Up Testing (TIA No. 2003-04, TAC No. MC0584)Safe Shutdown
Boric Acid
Mission time
Hydrostatic
Coatings
Finite Element Analysis
ML0402702715 March 2002Holtec Highlights, HH17.05
ML04028059727 January 2004Submittal of Revision 1 and Revision 2 of the Davis-Besse Nuclear Power Station Operational Improvement Plan Operating Cycle 14Grace period