ML030800118
| ML030800118 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/18/2003 |
| From: | Myers L FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 2940 | |
| Download: ML030800118 (5) | |
Text
FENOC FirstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor, Ohio 43449 Lew W Myers 419-321-7599 Chief Operating Officer Fax 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 2940 March 18, 2003 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Semiannual Fitness-For-Duty Report, July-December, 2002 Ladies and Gentlemen:
Pursuant to 10 CFR 26.71 (d), "Recordkeeping Requirements," FirstEnergy Nuclear Operating Company (FENOC) submits the semiannual Fitness-For-Duty (FFD) report for the period of July through December 2002, for the Davis-Besse Nuclear Power Station, Unit 1 (DBNPS). provides FENOC's DBNPS FFD Program Performance Data. Attachment 2 provides a summary of management actions taken by FENOC based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by FENOC.
Should you have any questions or require additional information, please contact Mr. Patrick J. McCloskey, Manager - Regulatory Affairs, at (419) 321-8450.
Sincerely, GMW/s Attachments cc:
J. E. Dyer, Regional Administrator, NRC Region III S. P. Sands, NRC Project Manager C. S. Thomas, DB-1 Senior Resident Inspector Utility Radiological Safety Board U-2,
Docket Number 50-346 License Number NPF-3 Serial Number 2940 First Energy Nuclear Operating Company Davis-Besse Nuclear Power Station Fitness-For-Duty Report July - December 2002
Docket Number 50-346 License Number NPF-3 Serial Number 2940 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 December 31. 2002 Firt Eerv Nuclear OperatingiCm~n Company Davis-Besse Location 6 Months Ending (419) 321-8450 Phone P. J. McCloskev. Manaoer - Reeulatorv Affairs Contact Name Cutoffs: Screen/Confirmation (ncq/ml)
Marijuana Cocaine Opiates 50/15 300/150 300/300 Appendix A to 10 CFR 26 Amphetamines Phencyclidine Alcohol (%BAC) 1000/500 25/25 0.04 Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 846 0
1032 Categories Tested Positive Tested Positive Tested Positive Pre-Access 100 1/1 0
0 1416 19/22 For Post Accident 1
0 0
0 1
0 Cause Observed Behavior 0
0 0
0 17 2/2 Random 243 1/1 0
0 298 3/3 Follow-up 18 0
0 0
59 0
Other 2
0 0
0 18 0
Total 364 2/2*
0 0
1809 24/27*
- Indicates results according to NRC policy for cutoff levels on the left side and Company policy on the right Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal Mariuana Cctamines Clidine to test Licensee Employees 0
0 0
0 0
2 0
Long-Term Contractors 0
0 0
0 0
0 0
Short-Term Contractors 12 6
1 0
0 9
0 Total 12 6
1 0
0 11 0
Note: One contractor tested positive for two different drugs
Docket Number 50-346 License Number NPF-3 Serial Number 2940 FENOC MANAGEMENT ACTIONS RELATING TO FITNESS-FOR-DUTY FENOC Personnel Referred to EAP Management Sanctions 0
2
"**One contractor tested positive for two different drugs.
FENOC does not perform onsite initial drug screening tests; therefore, there are no unconfirmed positive results on which to base management actions.
FENOC FITNESS-FOR-DUTY REPORTS There were no Fitness-For-Duty reports submitted during this reporting period (July - December 2002).
I Contractor Personnel 0
27**
f
Docket Number 50-346 License Number NPF-3 Serial Number 2940 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager-Regulatory Affairs (419) 321-8450 at Davis-Besse of any questions regarding this document or associated regulatory commitments.
COMMITMENTS DUE DATE None N/A