Engineering Change Request ECR NO-02-805-00
ML031530183
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/28/2002
From:
FirstEnergy Corp
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0224
Download: ML031530183 (2)


Text

el- ?

C> s - - _ - V -- -- L U- 5 NOP-CC-2003-01 Rev. 01 a BV1 EnBV2 l DB PY Statement of Problem While disassembled for maintenance, RCPs P36-1 and P36-2 were discovered to have a previously undocumented recessed machine surface on the pump case. This machined surface was most likely cut duing the original machining operation of the pump case. A review of the Byron Jackson fabrication records has been unable to confirm this.

The additional machined recess requires that the pump cover outside diameter be smaller than the outside diameter of the machined recess on the case. The measured diameter of both pump covers is 49.50 inches. P36-1 case recess outside diameter measures 49.34 inches and P36-2 measures 49.50 inches.

This dimensional stack-up will lead to an improper fit on the P36-1 pump and a potential for an improper fit on P36-2, which could cause inadequate gasket compression and eventual jolint leakage, Proposed Change (Description, Purpose, Scope)

Enlarge ReactorCoolant Pump 1-1 and 1-2covers existing (0.015 inch x45 degree) chamferto 0.10 inch x45 degree to ensure proper cover to case fit per the vendor (FlowServe) recommendations.

This will ensure proper fit between the pump cover and case (i.e metal to metal joint design).

{

SystemlAsset Numbers Initiating Document 064-03 CR 02-09674 Cl Initiator !Pn1 SteveRoe J

- .7.\7.77 S~ nI LZL f, e 7'_Mf.4\;;-M.

l Phone 2455 Date 11/27/02 t'-^im Initiator's Supervisor (Pnnt Name & Sign)

James M(ey leYA,

-e U -ee*§.g Date 1l 11/27/02 rE.s ACCEPTED l0 REJECTED (Provide Justiicaion)

[I ADMINISTRATIVE DOCUMENT-ONLY CHANGE (Attach sheets as necessary) f os- 4 57- 42.

INFORMAL CHANGE (Provide direction or attach sheets as necessary) Work Order No-- 'Oz_-4138 -zs f:ii rArL.cs'(1+770 A) A't77 $(24-~I~~qT Admin Oocument-nly or lormat Change Prepared by (Print Name & Sign) Date

-T-e4fir,G I QltloZ T lCmmercial Change l Document-Only Change Equivalent Change l Design Change

_~f I El Equivalent O Design I Prelimiry oCos PC Approval Required? D Yes s-No At-Risk Change? 9 Yes No Assigned to: Resposible E ginser Proj ner Initiation Team Leader

. 7t-S Z~ 2k4!tf!_ _71 -a 'M .;

C` E g Supervsor(xn fn .f5dnt 7%8b lin Engineering Change Package prrto PRC Design Engineering Manager (Ptint Name & Sign) app g i n a a a i (lei Engineering Manager approvalrequired) /)1/84 _

PafgJ&3' Rrsry ENGINEERING CHANGE REQUEST No.02-O ,

0 NOP-CC-2003-01 fRev. 1 E ,ff: D (Provide Justiicaton)

D APPROVED Re mmended Priority Recommended Cycle Estimated Cost Initiation Team Leader (Print me & Sign) Date

-3..i;.--9t S 5 # ;ILY.."wt_7H-V , vtr Ls N .

U/* .. -t.-; f=;7<.FraGr E APPROVED L REJECTED (ProvideJustiicatio Design Engineering Manager (Pu Name & Sign) Date i APPIROVED Re J tifrij Maintenince Manager (Print Name & Sign) Date g# -M.

ts<:i-ii~~~~~

z.- MI-!Ol VITfRY fEW,:UUMM l i ¢ E ¢, .* t't.MV  ;-i!t'- .. '. ..

_________ ________ ________ ______ - -]f-, -,,;,-J If yes. PRC chairperson(Pdnt Name & Sign) Date Conceptual Design-Required D Yes 0 No El APPROVED j PRC Chairperson (Print Name & Sign) Date L REJECTED (Provide Justification)

PRC Chairperson (Print Name & Sign) Date Accounting Work Order No. Cost Code C.