Issue date | Title | Topic | |
---|---|---|---|
PNO-III-85-095D, on 851113,bearing Damage Occurred to Diesel Generators 13,11 & 14.Caused by Insufficient break-in Period.Bearing Replacement Required for Diesel Generator 11. Decrease in Lubricating Oil Viscosity Noted for 12 & 14 | 24 December 1985 | PNO-III-85-095D:on 851113,bearing Damage Occurred to Diesel Generators 13,11 & 14.Caused by Insufficient break-in Period.Bearing Replacement Required for Diesel Generator 11. Decrease in Lubricating Oil Viscosity Noted for 12 & 14 | |
PNO-III-85-098, on 851117,between 17,000 & 35,000 Gallons of Radioactive Water Released from Ruptured Seam in Condensate Storage Tank.Water Radioactivity Less than 0.4% of Regulatory Limit for Offsite Release | 18 November 1985 | PNO-III-85-098:on 851117,between 17,000 & 35,000 Gallons of Radioactive Water Released from Ruptured Seam in Condensate Storage Tank.Water Radioactivity Less than 0.4% of Regulatory Limit for Offsite Release | |
PNO-III-86-004, RHR Pump Motor Removed Offsite for Testing & Insp Following 851125 Failure Due to Mfg Defect.Pump Replaced.Generic Implications Under Investigation | 23 January 1986 | PNO-III-86-004:RHR Pump Motor Removed Offsite for Testing & Insp Following 851125 Failure Due to Mfg Defect.Pump Replaced.Generic Implications Under Investigation | |
PNO-III-86-008, on 860125,roving Fire Watch Discovered Burning Insulation on Exhaust Line of Emergency Diesel Generator 13.Caused by Oil Soaking Insulation During Prior Disassembly & Oil Flushing.Fire Extinguished.Leak Repaired | 27 January 1986 | PNO-III-86-008:on 860125,roving Fire Watch Discovered Burning Insulation on Exhaust Line of Emergency Diesel Generator 13.Caused by Oil Soaking Insulation During Prior Disassembly & Oil Flushing.Fire Extinguished.Leak Repaired | Fire Watch |
PNO-III-86-009, on 860131,earthquake Felt at Plant.No Significant Damage Reported.Some Site Personnel Evacuated. Site Area Emergency Declared.Supporting Documentation Encl | 31 January 1986 | PNO-III-86-009:on 860131,earthquake Felt at Plant.No Significant Damage Reported.Some Site Personnel Evacuated. Site Area Emergency Declared.Supporting Documentation Encl | Earthquake |
PNO-III-86-009A, on 860131,earthquake Experienced at Plant. Site Response Activities Accomplished by Implementing Emergency Plan,Although Action Not Required Prior to Licensing.No Significant Damage Noted | 3 February 1986 | PNO-III-86-009A:on 860131,earthquake Experienced at Plant. Site Response Activities Accomplished by Implementing Emergency Plan,Although Action Not Required Prior to Licensing.No Significant Damage Noted | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake Scaffolding |
PNO-III-86-024, on 860317,backup Reactor Protection Sys Trip Breaker Failed to Trip During Bus a Transfer from Primary Electrical Supply.Caused by Repeated Testing.Manual Scram Inserted.Investigation Underway | 17 March 1986 | PNO-III-86-024:on 860317,backup Reactor Protection Sys Trip Breaker Failed to Trip During Bus a Transfer from Primary Electrical Supply.Caused by Repeated Testing.Manual Scram Inserted.Investigation Underway | |
PNO-III-86-037, on 860418,util Announced Extension of Outage to mid-Jul 1986.Licensee Review of Reevaluation of Design Work Performed on Concrete Embedments & Pipe Supports Will Be Completed by 860501 | 18 April 1986 | PNO-III-86-037:on 860418,util Announced Extension of Outage to mid-Jul 1986.Licensee Review of Reevaluation of Design Work Performed on Concrete Embedments & Pipe Supports Will Be Completed by 860501 | |
PNO-III-86-067, on 860708,Monroe County Board of Commissioners Adopted Resolution,By 5 to 3 Vote,Requesting Congressman Dingell to Hold Hearings on Adequacy of GE Mark 1 Containment | 9 July 1986 | PNO-III-86-067:on 860708,Monroe County Board of Commissioners Adopted Resolution,By 5 to 3 Vote,Requesting Congressman Dingell to Hold Hearings on Adequacy of GE Mark 1 Containment | |
PNO-III-86-069, on 860715,full Scram & ECCS Actuation Occurred During Heatup of Reactor Pressure Vessel.Approx 10 Gallons of Water Injected Into Vessel.Caused by Pressure Spike from Flow Perturbation.State of Mi Informed | 16 July 1986 | PNO-III-86-069:on 860715,full Scram & ECCS Actuation Occurred During Heatup of Reactor Pressure Vessel.Approx 10 Gallons of Water Injected Into Vessel.Caused by Pressure Spike from Flow Perturbation.State of Mi Informed | Hydrostatic |
PNO-III-86-074, on 860731,licensee Authorized to Resume Operation Up to 5% Power.Further NRC Authorization Required for Higher Power Levels.Startup Will Begin on 860801 | 1 August 1986 | PNO-III-86-074:on 860731,licensee Authorized to Resume Operation Up to 5% Power.Further NRC Authorization Required for Higher Power Levels.Startup Will Begin on 860801 | |
PNO-III-86-074A, on 860804,start Up Initiated W/Removal of Control Rods.Activities Postponed from 860801 for Repair of Bypass Valve.Problem W/Position Indicators for MSIVs Also Corrected | 4 August 1986 | PNO-III-86-074A:on 860804,start Up Initiated W/Removal of Control Rods.Activities Postponed from 860801 for Repair of Bypass Valve.Problem W/Position Indicators for MSIVs Also Corrected | |
PNO-III-86-077, on 860806,fire & Electric Overload Alarm Received.Fire Located in Cubicle Containing Power Supply Breaker.Cause Unknown.Fire Extinguished.Power Supply Breaker & Affected Motor Control Ctr Inspected | 7 August 1986 | PNO-III-86-077:on 860806,fire & Electric Overload Alarm Received.Fire Located in Cubicle Containing Power Supply Breaker.Cause Unknown.Fire Extinguished.Power Supply Breaker & Affected Motor Control Ctr Inspected | |
PNO-III-86-083A, on 860828,nine NRC Licensing Examiners Completed Simulator Portion of Requalification Exams.All Nine Passed Exams.Licensee Requalification Program for Licensed Operators Acceptable | 29 August 1986 | PNO-III-86-083A:on 860828,nine NRC Licensing Examiners Completed Simulator Portion of Requalification Exams.All Nine Passed Exams.Licensee Requalification Program for Licensed Operators Acceptable | |
PNO-III-86-088, on 860902,normal Plant Shutdown Began for Repair of Malfunctioning torus-to-reactor Bldg Vacuum Breaker Isolation Valve.Repair Effort Expected to Take More than 48 H.Addl Maint Will Be Conducted During Shutdown | 3 September 1986 | PNO-III-86-088:on 860902,normal Plant Shutdown Began for Repair of Malfunctioning torus-to-reactor Bldg Vacuum Breaker Isolation Valve.Repair Effort Expected to Take More than 48 H.Addl Maint Will Be Conducted During Shutdown | |
PNO-III-86-097, on 860912,authorization Granted to Increase Power Level to 20%.Power Escalation Expected This Wk.Power Increase Previously Recommended for 860910 | 15 September 1986 | PNO-III-86-097:on 860912,authorization Granted to Increase Power Level to 20%.Power Escalation Expected This Wk.Power Increase Previously Recommended for 860910 | |
PNO-III-86-106, on 860926,suspicious Device Found on Hatch Cover on Fourth Floor of Auxiliary Bldg.Bomb Disposal Specialists Investigated Device & Found Device Empty.Device Was Piece of Pipe Placed on Hatch by Maint Personnel | 26 September 1986 | PNO-III-86-106:on 860926,suspicious Device Found on Hatch Cover on Fourth Floor of Auxiliary Bldg.Bomb Disposal Specialists Investigated Device & Found Device Empty.Device Was Piece of Pipe Placed on Hatch by Maint Personnel | |
PNO-III-86-111, on 861005,reactor Manually Scrammed from 15% Power Due to Partial Loss of Vacuum in Condenser Causing Temp Increase.Also,On 861005,during Test of Water Level Transmitters,Pressure Spike Inadvertently Introduced | 8 October 1986 | PNO-III-86-111:on 861005,reactor Manually Scrammed from 15% Power Due to Partial Loss of Vacuum in Condenser Causing Temp Increase.Also,On 861005,during Test of Water Level Transmitters,Pressure Spike Inadvertently Introduced | |
PNO-III-86-112, on 861009,problem Occurred W/Rod Sequence Control Sys,Hindering Normal Manual Insertion of Control Rods.Caused by Low Voltage in Normal Power Supply.Evaluation of Problem Underway | 10 October 1986 | PNO-III-86-112:on 861009,problem Occurred W/Rod Sequence Control Sys,Hindering Normal Manual Insertion of Control Rods.Caused by Low Voltage in Normal Power Supply.Evaluation of Problem Underway | |
PNO-III-86-118, on 861023,licensee Demonstrated Remote Shutdown Capability.Demonstration Successful W/All Equipment Operating as Designed.Plant Control Returned to Control Room After 45 Minutes.Plant in Cold Shutdown for Scheduled Maint | 24 October 1986 | PNO-III-86-118:on 861023,licensee Demonstrated Remote Shutdown Capability.Demonstration Successful W/All Equipment Operating as Designed.Plant Control Returned to Control Room After 45 Minutes.Plant in Cold Shutdown for Scheduled Maint | |
PNO-III-86-125, on 861031,operator Inadvertently Skipped Step in Rod Withdrawal Procedure & Pulled Next Rod in Sequence Out One Notch (6 Inches).Rod Reinserted to Proper Position & Correct Rod Sequence Restored | 31 October 1986 | PNO-III-86-125:on 861031,operator Inadvertently Skipped Step in Rod Withdrawal Procedure & Pulled Next Rod in Sequence Out One Notch (6 Inches).Rod Reinserted to Proper Position & Correct Rod Sequence Restored | |
PNO-III-86-131, on 861107,unit Shut Down Due to Air Leakage Into Main Condenser.Caused by Leakage in Thermal Expansion Joint Between One Low Pressure Turbine & Main Condenser. Licensee Plans to Inspect Remaining Joints | 10 November 1986 | PNO-III-86-131:on 861107,unit Shut Down Due to Air Leakage Into Main Condenser.Caused by Leakage in Thermal Expansion Joint Between One Low Pressure Turbine & Main Condenser. Licensee Plans to Inspect Remaining Joints | |
PNO-III-86-131A, 4-ft Tear Identified in North Condenser Boot During Repairs to Condenser Thermal Expansion Boots.Caused by Structural Damage to Condenser Supports.North & Ctr Condenser Thermal Expansion Boots Replaced | 14 November 1986 | PNO-III-86-131A:4-ft Tear Identified in North Condenser Boot During Repairs to Condenser Thermal Expansion Boots.Caused by Structural Damage to Condenser Supports.North & Ctr Condenser Thermal Expansion Boots Replaced | |
PNO-III-86-136, on 861117,283,000 Gallons of Water Lost from Condensate Storage Tank Following Maint on Valve.Caused by Breaking of Weld to HPCI Test Return Pipe.Radwaste Spill Occurred During Transfer of Spilled Water | 18 November 1986 | PNO-III-86-136:on 861117,283,000 Gallons of Water Lost from Condensate Storage Tank Following Maint on Valve.Caused by Breaking of Weld to HPCI Test Return Pipe.Radwaste Spill Occurred During Transfer of Spilled Water | |
PNO-III-86-142, on 861205,licensees Notified NRC That Electrical Splices Did Not Meet Environ Qualification Requirements & Plants Shut Down.Each Unit Has 150 Splices Which Must Be Repaired.Repairs Expected to Take 5 Days | 5 December 1986 | PNO-III-86-142:on 861205,licensees Notified NRC That Electrical Splices Did Not Meet Environ Qualification Requirements & Plants Shut Down.Each Unit Has 150 Splices Which Must Be Repaired.Repairs Expected to Take 5 Days | |
PNO-III-86-148, on 861217,guns,knives,ammunition & Marijuana Found in Possession of Truck Driver Seeking Entrance to Protected Area.Driver Denied Access & Arrested by State Police.Driver Involved W/Paramilitary Organization for Hire | 17 December 1986 | PNO-III-86-148:on 861217,guns,knives,ammunition & Marijuana Found in Possession of Truck Driver Seeking Entrance to Protected Area.Driver Denied Access & Arrested by State Police.Driver Involved W/Paramilitary Organization for Hire | |
PNO-III-87-001, on 870102,three Small Steam Leaks Discovered on Two of Four Main Steam Lines.During Power Reduction for Shutdown,Main Turbine Tripped on 18% Power.Cause Under Investigation.Instrument Lines Will Be Temporarily Plugged | 2 January 1987 | PNO-III-87-001:on 870102,three Small Steam Leaks Discovered on Two of Four Main Steam Lines.During Power Reduction for Shutdown,Main Turbine Tripped on 18% Power.Cause Under Investigation.Instrument Lines Will Be Temporarily Plugged | |
PNO-III-87-001A, on 870102,licensee Discovered Three Small Steam Leaks on Two of Four Main Steam Lines & on 870105, Following Repairs & Return of Steam Lines to Svc,Cracked Weld on Instrument Line/Valve Connection Found | 6 January 1987 | PNO-III-87-001A:on 870102,licensee Discovered Three Small Steam Leaks on Two of Four Main Steam Lines & on 870105, Following Repairs & Return of Steam Lines to Svc,Cracked Weld on Instrument Line/Valve Connection Found | |
PNO-III-87-001B, on 870108,normal Plant Shutdown Commenced to Repair Series of Small Steam Leaks on Main Steam Piping Attachments.Leak Located on Main Turbine Stop Valve 3 & Can Only Be Isolated by Closing MSIVs | 8 January 1987 | PNO-III-87-001B:on 870108,normal Plant Shutdown Commenced to Repair Series of Small Steam Leaks on Main Steam Piping Attachments.Leak Located on Main Turbine Stop Valve 3 & Can Only Be Isolated by Closing MSIVs | |
PNO-III-87-004, rept Submitted on 870107 to State of Oh Governor Rf Celeste Re Emergency Planning at Facilities Recommended That Plants Be Limited to 5% Power Until Emergency Planning Deficiencies Corrected | 7 January 1987 | PNO-III-87-004:rept Submitted on 870107 to State of Oh Governor Rf Celeste Re Emergency Planning at Facilities Recommended That Plants Be Limited to 5% Power Until Emergency Planning Deficiencies Corrected | |
PNO-III-87-009, on 870114,Safe Energy Commission of Michigan (Sec) Announced Results of Investigation Into Licensee Safeteam Program.Rept Contends Safeteam Program Failure.Sec Plans to File 2.206 Petition W/Nrc | 14 January 1987 | PNO-III-87-009:on 870114,Safe Energy Commission of Michigan (Sec) Announced Results of Investigation Into Licensee Safeteam Program.Rept Contends Safeteam Program Failure.Sec Plans to File 2.206 Petition W/Nrc | |
PNO-III-87-012, on 870123,licensee Informed Region That NRC- Licensed Nuclear Supervising Operator Suspended on 870122 Due to Positive Testing in Random Drug Screening on 870115. No Evidence of Error Found in Performance | 26 January 1987 | PNO-III-87-012:on 870123,licensee Informed Region That NRC- Licensed Nuclear Supervising Operator Suspended on 870122 Due to Positive Testing in Random Drug Screening on 870115. No Evidence of Error Found in Performance | Fitness for Duty |
PNO-III-87-016, on 870129,small Steam Leak Discovered in Spare Instrument Line Attached to Body of West Main Steam Bypass Valve.Caused by Crack in Weld Attaching Valve to Instrument Line.Valves Cut Off & Instrument Lines Plugged | 30 January 1987 | PNO-III-87-016:on 870129,small Steam Leak Discovered in Spare Instrument Line Attached to Body of West Main Steam Bypass Valve.Caused by Crack in Weld Attaching Valve to Instrument Line.Valves Cut Off & Instrument Lines Plugged | Flow Induced Vibration |
PNO-III-87-022, on 870216,Region III Authorized Facility to Exceed Previous 20% Power Limitation & Continue Testing Activities Up to 50% Power.Power Escalation Expected Pending Restoration of HPCI to Operable Status | 17 February 1987 | PNO-III-87-022:on 870216,Region III Authorized Facility to Exceed Previous 20% Power Limitation & Continue Testing Activities Up to 50% Power.Power Escalation Expected Pending Restoration of HPCI to Operable Status | |
PNO-III-87-022A, on 870308,plant Reached NRC Imposed Limit of 50% Power.Licensee Will Operate Plant at Approx 50% While Conducting Test on HPCI Sys,Rwcu Sys & Safety Relief Valves. Util Also Plans to Conduct Loss of Offsite Power Test | 9 March 1987 | PNO-III-87-022A:on 870308,plant Reached NRC Imposed Limit of 50% Power.Licensee Will Operate Plant at Approx 50% While Conducting Test on HPCI Sys,Rwcu Sys & Safety Relief Valves. Util Also Plans to Conduct Loss of Offsite Power Test | |
PNO-III-87-048, on 870402,util Informed Region III That Some Licensed Operators May Not Have Attended All of Required Lectures of Requalification Program.Unit Will Not Restart, Pending Review of Program | 3 April 1987 | PNO-III-87-048:on 870402,util Informed Region III That Some Licensed Operators May Not Have Attended All of Required Lectures of Requalification Program.Unit Will Not Restart, Pending Review of Program | |
PNO-III-87-048A, on 870406-10,NRC Special Insp Concluded That All Licensed Reactor Operators,Currently on Shift,Duty Up to Date W/Util Operator Requalification Program.Addl Review of Past Requalification Program Will Be Conducted | 13 April 1987 | PNO-III-87-048A:on 870406-10,NRC Special Insp Concluded That All Licensed Reactor Operators,Currently on Shift,Duty Up to Date W/Util Operator Requalification Program.Addl Review of Past Requalification Program Will Be Conducted | |
PNO-III-87-055, on 870410-11,licensee Identified Several Steam Leaks in Main Steam Line & HPCI & RCIC Sys Declared Inoperable.Caused by Cracked Welds & Blown Fuse, Respectively.Reactor Shut Down for Steam Line Repairs | 13 April 1987 | PNO-III-87-055:on 870410-11,licensee Identified Several Steam Leaks in Main Steam Line & HPCI & RCIC Sys Declared Inoperable.Caused by Cracked Welds & Blown Fuse, Respectively.Reactor Shut Down for Steam Line Repairs | |
PNO-III-87-075, on 870521,licensee Shut Unit Down from 7% Power to Repair Valve Packing Leak Detected on 870520 in Rwcu.Source of Leak Determined & Valve Opened & Closed to Stop Leakage Through Packing | 22 May 1987 | PNO-III-87-075:on 870521,licensee Shut Unit Down from 7% Power to Repair Valve Packing Leak Detected on 870520 in Rwcu.Source of Leak Determined & Valve Opened & Closed to Stop Leakage Through Packing | Packing leak |
PNO-III-87-081, on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other Plants | 11 June 1987 | PNO-III-87-081:on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other Plants | Earthquake |
PNO-III-87-101, on 870726,licensee Received Bomb Threat from Caller Angry Because Place of Residence Lost Power During Storm.Security Personnel Notified & Search Procedures Implemented.No Bomb Discovered | 27 July 1987 | PNO-III-87-101:on 870726,licensee Received Bomb Threat from Caller Angry Because Place of Residence Lost Power During Storm.Security Personnel Notified & Search Procedures Implemented.No Bomb Discovered | |
PNO-III-87-103, on 870727,licensee Reduced Power to Approx 2% to Repair Feedwater Check Valve Which Was Leaking. Unusual Event Under Licensee Emergency Plan Was Declared,Due to Required Shutdown | 31 July 1987 | PNO-III-87-103:on 870727,licensee Reduced Power to Approx 2% to Repair Feedwater Check Valve Which Was Leaking. Unusual Event Under Licensee Emergency Plan Was Declared,Due to Required Shutdown | |
PNO-III-87-116, on 870831,maint Personnel Discovered Evidence of Pipe Movement & Damage to Pipe Hangers & Supports on Emergency Drain Lines.Cause Undetermined. Investigation Continuing.Unit in Maint Since 870731 | 3 September 1987 | PNO-III-87-116:on 870831,maint Personnel Discovered Evidence of Pipe Movement & Damage to Pipe Hangers & Supports on Emergency Drain Lines.Cause Undetermined. Investigation Continuing.Unit in Maint Since 870731 | |
PNO-III-87-116A, updates Discovery of Turbine Bldg Pipe Support Damage.Addl Damage to Feedwater Heater Emergency Drain Lines Identified.Cause Undetermined.Damage Under Evaluation & Repair Plans Developed | 8 September 1987 | PNO-III-87-116A:updates Discovery of Turbine Bldg Pipe Support Damage.Addl Damage to Feedwater Heater Emergency Drain Lines Identified.Cause Undetermined.Damage Under Evaluation & Repair Plans Developed | |
PNO-III-87-130, on 871006,loaded .25 Caliber Automatic Pistol Found During Search of tractor-trailer Delivering Empty Radwaste Container to Plant Protected Area.Individual Denied Site Access & Detained Until Arrival of Police | 6 October 1987 | PNO-III-87-130:on 871006,loaded .25 Caliber Automatic Pistol Found During Search of tractor-trailer Delivering Empty Radwaste Container to Plant Protected Area.Individual Denied Site Access & Detained Until Arrival of Police | |
PNO-III-87-133, on 871009,licensee Authorized to Resume Operations Following Maint Outage.Limitation of 50% Power Remains in Effect.Licensee Will Provide Monthly Repts on Status of Preventive Maint Program & Improvement Plans | 13 October 1987 | PNO-III-87-133:on 871009,licensee Authorized to Resume Operations Following Maint Outage.Limitation of 50% Power Remains in Effect.Licensee Will Provide Monthly Repts on Status of Preventive Maint Program & Improvement Plans | |
PNO-III-87-138, on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems | 3 November 1987 | PNO-III-87-138:on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems | |
PNO-III-88-001, on 871231,reactor Scrammed from 75% Power as Result of High Water Level in Reactor,Caused by Personnel Error During Installation of Auxiliary Computer Intended to Monitor Feedwater Heater Temp | 4 January 1988 | PNO-III-88-001:on 871231,reactor Scrammed from 75% Power as Result of High Water Level in Reactor,Caused by Personnel Error During Installation of Auxiliary Computer Intended to Monitor Feedwater Heater Temp | |
PNO-III-88-002, on 880111,reactor Tripped & HPCI & RCIC Sys Triggered Automatically Due to Trip of One Reactor Feedwater Pump.Caused by Feedwater Control Sys Power Supply Failure. Power Supply Replaced | 11 January 1988 | PNO-III-88-002:on 880111,reactor Tripped & HPCI & RCIC Sys Triggered Automatically Due to Trip of One Reactor Feedwater Pump.Caused by Feedwater Control Sys Power Supply Failure. Power Supply Replaced | |
PNO-III-88-003, on 880115,regional Administrator Authorized Licensee to Exceed 75% for First Time & Proceed Up to 100% Power.On 880116,licensee Began Increasing Power But Encountered Vibration Problems on Two Main Steam Lines | 20 January 1988 | PNO-III-88-003:on 880115,regional Administrator Authorized Licensee to Exceed 75% for First Time & Proceed Up to 100% Power.On 880116,licensee Began Increasing Power But Encountered Vibration Problems on Two Main Steam Lines |